Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 28 of 31  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  321   02 May 2022, 07:27 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.05.2022General Announcement:
- Martin Doering gives update on the maintenance
planning progress: a Dashboard will be introduced
  
  601   02 Apr 2025, 10:31 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.04.2025General Announcement:
- A. Galler reminds instruments that enquiring
and requests on beam parameters shall come
  
  305   02 Mar 2022, 10:12 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.03.2022General Announcement:
- There is a high probability that we will
run out of Helium gas due to difficulties
  
  297   02 Feb 2022, 08:39 Andreas GallerGeneralInformationNotes XO Integration Meeting 02.02.2022

General Announcement:


 


CTRL:
  
  283   01 Dec 2021, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.12.2021General Announcement:
- Info that today the 20C cooling water will
be switched to the towers was sent. Please
  
  465   01 Nov 2023, 10:04 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.11.2023General Announcement:
- Jan G. as PRC comments: 1. reminds SQS
and FXE instruments to place entries at the
  
  273   01 Nov 2021, 10:10 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.11.2021General Announcement:
-  XO is currently setting scheduling meetings
with the groups for planning and cross-checking
  
  256   01 Sep 2021, 10:36 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.09.2021General Announcement:
- A change of meeting room occupancy will
happen soon (increase by some %) and will
  
  345   01 Aug 2022, 10:02 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.08.2022General Announcement:
- Today the SEPS interlock tests take place
at all SASEs. This happens usually after
  
  526   01 Jul 2024, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.07.2024General Announcement:
-  
  
  138   01 Jul 2020, 13:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.07.2020General Announcement:
- Interlock tests are starting in SASE3 instruments
right now. Zunaira, Eric and Wolfgang Clement
  
  330   01 Jun 2022, 09:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.06.2022General Announcement:
- Martin Doering presents the status of the
maintenance planning: currently XO is about
  
  399   01 Mar 2023, 09:41 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.03.2023General Announcement:
-  
  
  203   01 Mar 2021, 10:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.03.2021General Announcement:
- An e-mail from Steve Aplin informs on how
to contact the DATA operation center during
  
  391   01 Feb 2023, 10:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.02.2023General Announcement:
- A. Galler reminds instruments to use the
Operation-2023 e-log for daily reports.
  
  195   01 Feb 2021, 09:06 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 01.02.2021General Announcement:

- The test of the emergency automatic
switch of power bridge is scheduled for Tuesday, 2nd
  
  204   03 Mar 2021, 09:23 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 03.03.2021General Announcement:

- Hick-ups in the beam operation
are happening since last night. There is
  
  309   16 Mar 2022, 10:39 Frederik Wolff-FabrisGeneralInformationNotes XO Int. Meeting 16.03.2022General Announcement:
- The Summer maintenance planning period
is approaching and next Wednesday at the
  
  308   14 Mar 2022, 10:41 Frederik Wolff-FabrisGeneralInformationNotes XO Int. Meeting 14.03.2022General Announcement:
- On the Summer-22 maintenance period: In
about 2 weeks (by end of March) the call
  
  97   10 Feb 2020, 10:12 Frederik Wolff-FabrisGeneralInformationNotes Dispatch meeting Feb 10th, 2020SPB: Nothing to report;

FXE:  Everything ongoing; nothing special
  
ELOG V3.1.4-7c3fd00