Entry   Notes XO Integration Meeting 16.01.2023, posted by Frederik Wolff-Fabris on 16 Jan 2023, 09:54 
General Announcement:
- Tomorrow and Wednesday the 5Hz test take place; Wednesday as the pure 5Hz operation and on Wednesday there is the hybrid test. Every second pulse will not see any train.

CTRL:
- New version of Beckhoff Karabo device will be deployed today at 14:00; it shall take 5-10 mins.

DA:
- Nothing to report.

EEE:
- Continuing with remaining maintenance tasks and preparing the bring-up days with instruments.

VAC:
- Nothing to report. Tunnels XTD6 and XTD9 remain open until Wednesday.

XPD:
- Preparing for tunnel closure, stat-up and 5Hz tests.

DET:
- Gotthard1 detectors: need a firmware upgrade and will be coordinated with instruments.

ITDM: 
- Announcement: on Friday exchange of SA1 devices.

XRO:
- All fine from XRO.

LAS:
- Working on the Lasers back-up; Lasers will be shut down for the 5Hz tests.
- Issue with Smaract stages being worked.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 11.01.2023, posted by Frederik Wolff-Fabris on 11 Jan 2023, 11:16 
General Announcement:
- If you have a forwarded invitation for the XO Int. meeting in your calendar, it will not be automatically deleted. The new invitation was sent at the end of December. 
Please contact XO if you have not received. Another option is to subscribe to the xo-info mailing list.
- The Operations-2023 e-log is made available. Thanks to ITDM for the support on it.
- The 5Hz tests will take place on the 17-18.01. A timeline schedule is to made available today from Desy and will be shared via the xo-info list. 
The 5Hz operation will be done on the 17th and a hybrid mode test is on the 18th.
- Tunnels XTD6 and XTD9 will remain open for a max of 1 week. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Power OFF in SA3: electronics in SQS, SCS and PP-lasers were affected. Systems had to be restarted. 
- Discussion is going on to avoid such mishaps not happening again in future.

VAC:
- XTD6 and XTD9 are open; Please FXE and HED shall check cameras and Monochromators before the tunnels are permanently closed.

XPD:
- XGM in SCS hutch was affected by the power failure. It was recovered and is back into the normal state. Other systems are also being brought back during this week.

DET:
- Nothing to report.

ITDM: 
- Upgrade of Ubuntu 18.04 LTS control PCs is going to take place until April. An e-mail was sent to xo-info list. Instruments shall contact ITDM accordingly by using the ticket systems.

XRO:
- Not present.

LAS:
- Switch OFF in SA3: no harm seems to remain. 

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- FXE is interested in XTD9 access for the next days. 

MID:
- Nothing to report.

HED:
- HED is interested in XTD6 access for the next days.

SCS:
- Suffered from the power OFF: bringing back vacuum for XGM and other systems. All shall be fine.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 09.01.2023, posted by Frederik Wolff-Fabris on 09 Jan 2023, 10:10 
General Announcement:
- Interlock tests light taking place today and tomorrow, starting at Desy premises and tunnels.
- On 23.01 there is the Interlock tests at XHEXP1. 
- Zunaira A. asks for one experimental hutch in all SASEs (optics hutch can also be) to be closed for tomorrow to check some signals for tunnels. Hutches need to be closed at around 09:30-10:00. 
SQS accepts to interlock the hutch. MID also says it is possible but a precise time needs to be communicated.
- On 17-18.January the 5Hz operation will happen. Needed groups are already informed and tests shall be transparent for the instruments. Tim Wilksen will prepare a schedule to be distributed as soon as 
available.

CTRL:
- Influx DB: two nodes are available. A 6-month policy notice is the one to be used by Karabo. An e-mail will be sent.

DA:
- Nothing to report.
EEE:
- SA2 lost power on the 31.01. The CPUs in the instruments were not affected; the CPU in SA2 laser was affected and parameters had to be reset. Impression is that UPS did not act. EEE needs more 
information.
- A. Galler says that it relates to the broken UPS in SA2 area. A possible automatic check run/done by MPS triggered the emergency OFF. A new battery for the UPS is ordered and it is to be delivered in 
future.

VAC:
- All relevant tasks for WMP are closed.

XPD:
- XPD would like to continue in XTD9 and XTD6 after the interlock tests to conclude minor activities.

DET:
- Nothing to report.

ITDM: 
- Reminder to all instruments and support groups: finish accessing and closing the proposals (deadline has already passed) before they will be discarded.

XRO:
- Will need access to tunnels XTD6 at late January. The access is not related to test components.

LAS:
- Bringing lasers back up. In SA2 there was a rough start due to the power OFF but seems all in good track.

UNSYS:
- SA3 undulators: rotary encoders could be used to control the undulator gaps.
- Suren K. informs that partially recovered encoders for the 3 upstream segments. Spare parts for the next two devices will arrive in some months. Root cause for the SA3 power issue is not understood. 
Undulators can be operated.
- Power distribution terminals in SA2 (2 units) and 1 unit in SA1 needed replacements.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Request to support groups: if external companies need access to hutch, please remind these companies to do not use dirty shoes when accessing any hutch.

HED:
- Nothing to report.

SCS:
- Issue with XGM gas supply last week (valve was closed by someone unknown). Check functionality is ongoing but all seems to be fine. 
- Transport taking place may affect access in areas around SCS, including XTD10.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.12.2022, posted by Frederik Wolff-Fabris on 19 Dec 2022, 10:01 
General Announcement:
- This is the last XO Integration meeting of this meeting.
- An electrical issue in SA2 experimental area happen: issue with UPSs - rack rooms could be affected. TS is investigating. PP-lasers were unaffected.

CTRL:
- Concluded Karabo updates basically in all topics.
- Further updates ongoing this week.

DA:
- Nothing to report.

EEE:
- Nothing to report.
- Train-IDs for SA2 instruments were missing during the weekend (likely related to the UPS failure) but are back since about an hour ago and then maybe only PLCs were affected.

VAC:
- All fine with VAC.

XPD:
- Work ongoing as planned.

DET:
- Nothing to report.

ITDM: 
- Maxwell maintenance taking place this week. 
- Servers for SA2 apparently were not affected due to the issue with UPS. To be further checked.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Five undulators in SA3 have faulty encoders and are not moving after a power cut on 06.12 (seen in history of local PLCs - happened from cell14 to cells23). Reason for power down is not known. The power 
was ON from cell1-13. 
- Replacement of linear encoders are not possible with vacuum chamber between girders as needs alignment.
- First UNSYS will try to operate with rotatory encoders, if does not succeed, segments will be taken out.
- There are 4 spare encoders to repair 3 segments. Delivery time for new spares is 3-4 Months.
- Needs investigation to discover reason for the power outage in cells#14-23.
- Cell 33 in SA2 is fully operational.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Power failure of UPS happened on Saturday on the SA2 experimental Hall area – will further investigate for affected systems.

HED:
- Will investigate any effect of the UPS failure.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.12.2022, posted by Frederik Wolff-Fabris on 14 Dec 2022, 09:55 
General Announcement:
- There will not be Xo Int. meeting next Wednesday 21.12. The last meeting for this series will be next Monday 19.12.
- Martin Doering announces that the DACHS system maintenance previously scheduled for next Monday 07:30AM was already done and there will be no access disturbance next Monday; 
Currently around 48% of the winter maintenance tasks are timely done. For Desy groups around 36% are closed.
- Please inform xo-planning for tasks that are not going to happen or are cancelled/delayed. An e-mail will be sent to inform the groups in the coming days and the file to be updated will appear at the 
Sync&Share system.
- XO has been asked regarding gases and cryogenics. The process in place is the Hall Crew only supporting TS and if any group is needing technical gases and cryogenics, please continue to submit a ticket 
to TS. 
- K. Wrona asks for additional info on the 5Hz operation. A. Galler says that if there is a showstopper this has to be communicated and the startup period in January is meant to test this operation mode.
All timing systems will run at 5Hz and some solutions will be put in place e.g. at the lasers. Reason behind is to save electricity. 

CTRL:
- Done with Karabo upgrade in SA1 and SA3 topics. Today goes on with SA3.
- On Thursday ITDM will upgrade the SA1 topic for data loggers' machines. This takes about 1 hour.

DA:
- Nothing to report.

EEE:
- Ongoing with the current schedule for tunnel updates: SA1 motion done yesterday. Please check these systems in the coming days.

VAC:
- Everything is going accordingly to the schedule.

XPD:
- In a group retreat.

DET:
- Testing detectors after the Karabo update.
- Following request from DA to test Detectors calibration pipeline (LPD, AGIPD-1M).
- Operation at 5Hz will be discussed internally.

ITDM: 
- Continuing the calibration work.
- Finalize servers update today (there is one hardware issue to solve).
- Data loggers for SA1 will be changed to the new hardware. An e-mail will be sent.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Small absorber at the end of SA2 was installed in preparation for the SCUs.
- SA3 will have a Marwin installed to measure radiation during operation.
- Beckhoff sent back repaired motors for PSs. A total of 8 spares are now available.
- SA3 undulators had a power cut and is under investigation.

SPB:
- Nothing to report.

FXE:
- Maintenance of the electrical rack today.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Work happening at the experimental hutch today; Filter change for the air conditioning has to be postponed.
Entry   Notes XO Integration Meeting 12.12.2022, posted by Frederik Wolff-Fabris on 12 Dec 2022, 10:01 
General Announcement:
- So far there is no reports of big bad effects from the power outage on 03.12 caused by MPS activity.
- Experimental Hall cranes will be maintained tomorrow by an external company and therefore can not be used in the time.

CTRL:
- Starting today with Karabo update.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All planned tasks for maintenance are ongoing; in XTD2 started mounting the clean tent; 
- On Tuesday and Wednesday XPD has a group retreat.

DET:
- Nothing to report.

ITDM: 
- Delivery of online cluster server is delayed in SA1 and it will be concluded this week. Please contact ITDM if service is needed.
- Tomorrow 6AM distribution layer switches will be updated to be back with redundant mode of operation.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- New SA2 undulator is aligned and vacuum chamber clearance is to be checked today.
- Fuses for the balcony room are ordered.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Working inside the hutch as planned.
Entry   Notes XO Integration Meeting 07.12.2022, posted by Frederik Wolff-Fabris on 07 Dec 2022, 12:06 
General Announcement:
- Tobias Clever informs to contact TS (Oleg E.) in case of broken fuses (see UNSYS).
- Regarding liquified gases: the XHCrew does not provide safety trainings nor is the main contact for supplying gases or cryogenics. 
Please contact TS will enquires regarding technical gases or cryogenic liquids. TS is the main point of contact for this matters.
- Regarding network problems yesterday: Desy exchanged a switch for a new one and it was when problem happens. Office telephones are currently not working. A new ticket to NOC was issued. 

CTRL:
- Started the topics back after the power maintenance. Not all devices are up as there is some updates to be done in the next days/week. The ramp-up went fine for the topics that were restarted.

DA:
- Nothing to report.

EEE:
- Results of the check after the power cut show no damage.
- PLCs were also recovered.
- uTCA went up and the planned update of fast-ADC will take place next week after the Karabo update. Please do not use fast ADC until then and contact Bruno F. in case of questions.

VAC:
- Continue with scheduled works for the WMP.
- From Saturday task: everything was recovered without main issues.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Not present.

XRO:
- Electrical shutdown went well in tunnels.
- From yesterday once Karabo is back: XRO is checking again systems.
- An update of tasks for the WMP will be send to XO as some tasks were cancelled.

LAS:
- No issues from the power shutdown. All are fine.

UNSYS:
- SA3 balcony room had a problem after the power shutdown - fuse was broken; Now it is working.

SPB:
- All going fine, tests with Jets today.

FXE:
- Examining CRL lenses.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Switching ON components and so far no damaged devices were found.
- Normal maintenance program is ongoing.

SQS:
- Restarting devices and no damaged components were found already.
Entry   Notes XO Integration Meeting 05.12.2022, posted by Frederik Wolff-Fabris on 05 Dec 2022, 09:59 
General Announcement:
- Dec.3rd power an drinking water maintenance: many thanks to TS and MKK groups for their efforts - tasks accomplished without any harm by lunch time (4 hs earlier than originally planned). 
- Unfortunately an action by another Desy group triggered radiation protection in instrument areas. This action was not announced to XO. 
Please inform XO if you encounter any damaged device. An 8D report will be prepared on this incident.
- PLCs and Karabo will be ramped up; Office network was available all time; Drinking water is already available.
- Zunaira A. says that an e-mail is usually sent to a list of persons. A. Galler says that this time we do not know if someone was informed.
- J. Szuba says only in SA1 rack rooms were out of power.
- Tobias Clever inform that every device can be switched on again.

CTRL:
- Start bringing up Karabo topics as soon as control machines are available.

DA:
- Nothing to report.

EEE:
- Tunnel loops are already properly working.
- Switching ON instruments loops as agreed with them from today on.
- uTCAs are in process to be brought back.

VAC:
- Lost some controllers and power suppliers as expected but no major issues on Saturday.

XPD:
- Survived electrical shutdown quiet well: PES and XGMs are fine.
- Second outage due to Desy group was detected first at SCS XGM which was the first device to be brought back.
- Re-starting more devices after Karabo is back.

DET:
- Nothing to report.

ITDM: 
- Started to bring up the control servers and other systems.
- Comment to update done on office network switches Friday afternoon: one distribution layer is not working. Currently one runs office network in a single layer - to be investigated by NOC.
XRO:
- All systems are reconnected and will be checked when Karabo is available.
- One computer did not come back (failure of power supply).

LAS:
- Nothing to report. Seeders were unaffected to the best of LAS knowledge.

UNSYS:
- Replacement of undulator: new one in SA2/cell33 is in place and connected to control system; Needs alignment by MEA.
- Control cabinets in balcony room to be brought back.

SPB:
- Ion pump system is back online Saturday evening. Continue today with other devices.

FXE:
- To be checked today for effects from the weekend.

MID:
- All fine at MID. Most devices were OFF.
- Work on power line at the balcony room today. Wait for TS finish the work before start major switches. ITDM will wait before re-starting machines there.
- High temperature in control room and hutches is seen this morning.

HED:
- High temperature in the control room and hutches as of now.

SCS:
- Components were OFF and today switches ON again and search for damage.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 30.11.2022, posted by Frederik Wolff-Fabris on 30 Nov 2022, 09:55 
General Announcement:
- Reminder on the Power cut activity on Dec. 3rd: please contact XO for questions.
- The heating at HXQ will be switched OFF on Friday 8AM.
- There will be no available drinking water from Friday 15:00.

CTRL:
- Related to 03.12: Karabo and other topics will be shut down on Friday starting at 11:00AM.

DA:
- No updates for today.

EEE:
- In process of preparing for the power cut; groups were contacted for timeframe work.

VAC:
- Not present.

XPD:
- Preparing for power cuts.
- Ramp down day on Monday found only minor issues; very useful data were taken; XGMs were placed OFF; beam transport was brought to safe state.

DET:
- Nothing to report; no news on Jungfrau burst mode.

ITDM: 
- Working accordingly to the plan.

XRO:
- Not present.

LAS:
- Lasers will be switched down from tomorrow.

UNSYS:
- Maintenance work is ongoing.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID; 95% of devices are already OFF.
- Reminder: on Monday TS has work in MID rack rooms; MID start back on Tuesday with maintenance work.

HED:
- Question related to cooling water for the PLC CPUs (which are not being switched OFF): Nerea J. and A. Galler confirm that water cooling is available. 

SCS:
- Nothing to report.

SQS:
- Not present: on a retreat.
Entry   Notes XO Integration Meeting 28.11.2022, posted by Frederik Wolff-Fabris on 28 Nov 2022, 09:58 
General Announcement:
- The XO Integration Meetings will continue until the end of the year; For next year SXP will be included in the round of discussions.
- A. Galler reminds on the electrical and water supply maintenance on Saturday 3rd. Please read the latest e-mail from TS and contact xo-planning@xfel.eu in case of questions.
- SXP hutch is currently interlocked for the ramp down day. A. Scherz will ask G. Mercurio for closing also SCS experimental hutch.

CTRL:
- Nothing to report.

DA:
- All fine at DA.

EEE:
- Dates for switching OFF the PLCs for the Dec.3rd activity are available at the EuXFEL infrastructure calendar.

VAC:
- Nothing to report.

XPD:
- Working on the ramp-down activities today. Ongoing activities can be seen at Remote1 Zoom session from BKR.

DET:
- DSSC was tested in commissioned. 
- SPB/SFX AGIPD modules were exchanged and detector is running again.
- No news from Jungfrau / Burst mode.

ITDM: 
- Start tomorrow with online resources at balcony room updates (out of service during intervention).
- Over the weekend ITDM takes the chance to migrate InfluxDB: system not available.
- On Friday the network gateway will be updated.

XRO:
- Busy with ramp-down day.

LAS:
- Nothing to report.

UNSYS:
- Cell29/SA1 Phase shifter presents a problem and is to be fixed from tomorrow by exchanging motors.

SPB:
- Working with Agipd and ramping down for the weekend.

FXE:
- XRO is using FXE hutch for the ramp-down.
- Preparing for the power work on Saturday.

MID:
- All fine at MID; started with ramp down procedure.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 23.11.2022, posted by Frederik Wolff-Fabris on 23 Nov 2022, 10:03 
General Announcement:
- Remind the 03.12 activity on Electrical and drinking water is nearing: please contact XO if you have any questions on their effects or where electricity is affected.


CTRL:
- Monday SA2 VAC tests went fine.

DA:
- Nothing to report.

EEE:
- TCP/IP VAC SA2 tests went fine on Monday.

VAC:
- Nothing to report.

XPD:
- No incident to report; Preparing for the studies e.g. 30keV.

DET:
- Jungfrau 1M module at FXE: work ongoing in the detector to understand why burst mode was not working. Work with firmware is done.
- MID detector update is ongoing (opened detector; needed support from Desy). Now it is back online.
- SPB AGIPD firmware update was done and tomorrow exchange front end modules.

ITDM: 
- Nothing to report.

XRO:
- Reported by SQS strange behavior of M1 in SA3 (related to beam moving event of last weekend): after investigation it was found one electronics was dying near the Dump, probably related to radiation 
damage. 
It will be disconnected as it is not needed at the moment. During the WMP more activities will be done. 
- Monday there is the Ramp-down activity scheduled to access conditions of mirrors: SA3 hutches must be interlocked at lest for the morning. An agreement for time schedule will be done.

LAS:
- Nothing to report.
UNSYS:
- All fine with Undulators. There are 5 spare encoders for PS.

SPB:
- AGIPD intervention planned for tomorrow.

FXE:
- EEE is looking into homing procedure with encoders today.
- PP-laser issues from last week were resolved.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.
- Giuseppe M. will ask internally if hutch can be closed on Monday.

SQS:
- Suffering from artefact on DAQ 412 digitizer recently: if another instrument also see such problems, please contact Alberto de Fanis.
- SQS can close the hutch on Monday.
Entry   Notes XO Integration Meeting 21.11.2022, posted by Frederik Wolff-Fabris on 21 Nov 2022, 10:09 
General Announcement:
- The procedure for requesting gases and cryogenic liquids consists in submitting a ticket to TS at least one week prior your plans for usage/needs. 
Please avoid requests by phone or e-mail or at last minute which may not be possible to grant.
- An e-mail on the effects of the Electrical and Drinking water activities of 03.Dec was sent to xo-info@xfel.eu mailing list. In case of questions please contact xo-planning@xfel.eu.

CTRL:
- Busy together with EEE preparing for the deployment and test SA2 VAC update.

DA:
- All fine.

EEE:
- VAC SA2 update activity starting at 12:00 today.

VAC:
- Nothing to report.
- As PRC, Martin Dommach says the weekend was quiet with no major issues.

XPD:
- Nothing to report. All fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report. Issue with pump diode at PP-laser SA1 last Wednesday was solved by replacing it.

UNSYS:
- Nothing to report.

SPB:
- Last shifts on weekend were cancelled.

FXE:
- Lost 2 days with PP-laser operation.
- Weekend problem with digitizer: stopping every two hours but lately more often. Had to start acquisition manually. Called DOC and solved by re-instantiating the Karabo. 
It should investigate if a permanent solution can happen.
- Issues with undulator scans energy: beam instability while scanning - BKR switched OFF feedback which somewhat helped. Pulse energy fluctuates during the scans.

MID:
- All fine - start preparing for the power outage of Dec.3rd.

HED:
- Minor issues: 1. DAQ aggregator slow again; 2. Saturday the proposal was finished due to issues; 
3. issues with Jungfrau (DOC contacted): experiment killed the rep rate with communication between Karabo and detector SA2 topic (Jungfrau not triggered at the right trains of laser pulses).
- Drop in HXRSS ending with on Sunday with 100uJ.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 16.11.2022, posted by Frederik Wolff-Fabris on 16 Nov 2022, 10:58 
General Announcement:
- With the winter maintenance period coming in two weeks, XO kindly reminds you to check the access rights for tunnels at the DACHS/DARF system. Please also remind your respective groups' colleagues.
- Steffen H. presents a summary for the ramp down plan of PLCs and Karabo relative to the Saturday's Electrical activity of Dec. 3rd. 
Please note that Karabo or PLCs based controls will not be available from Friday 11:00 up to Monday mid-day. XO will prepare an e-mail clarifying this information.

CTRL:
- Nothing to report.

DA:
- Concerning skipping of calibration: an e-mail with procedures was sent and is available at Alfresco. Instruments can look at it. 

EEE:
- Nothing to report.

VAC:
- All running fine.

XPD:
- Nothing to report.

DET:
- On last weekend: SPB/SFX documented at the e-log an incident of AGIPD detectors with modules replaced last Summer Maintenance. Three out of 4 modules are compromised. 
Steve A. said he was charged to propose a solution to be discussed with R. Bean.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- AMPHOS SA1 switched OFF this morning and investigation is ongoing to find reason. Beam is back on the table and will be available to FXE in few hours.

UNSYS:
- Nothing to report.

SPB:
- Nothing major to report.

FXE:
- Problems with beam with lower intensity than expected: XO informs that tuning for the North Branch happened yesterday late afternoon and performance was improved.
- Problem with PP-laser.

MID:
- All fine.

HED:
- Problems with uTCA crates with cards that do not show signal. Being addressed.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 14.11.2022, posted by Frederik Wolff-Fabris on 14 Nov 2022, 10:00 
General Announcement:
- As PRC, F. Wolff-Fabris says operation during the weekend was not optimal: 
1. on Friday evening the A6 started to trip several times; we first decreased the gradient in the same fashion as done on Wednesday morning but it did not help; On Saturday the A6 was removed entirely from 
operation after lunch time. 
2. On Sunday 9PM a PLC for the Dump/TLD stopped work and experts from Desy came to exchange it. Beam was recovered around 1:30AM. 
- Today, Monday, machine is being changed to 16.3GeV. Currently we expect beam delivery to start tomorrow at 7AM.
- Martin Doering presents a summary of major tasks planned for the winter maintenance period regarding e.g. limited access to the campus; timing issues; IT systems; gas supplies; media maintenance; cooling 
water; elevator; etc... 
An e-mail will be sent to xo-info@xfel.eu

CTRL:
- InfluxDB data was not available at Graphana: fixed and under monitoring.
- HED VAC loop6 update: test is being planned with EEE and HED.

DA:
- Calibration issue reported on Wednesday is fixed;
- Some OCD calls for calibration during the weekend but all have been addressed.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- InfluxDB: taken care and reconfigured; being watched.

XRO:
- Nothing to report.

LAS:
- Incident Friday on SA1 PP-laser with chiller; came back on Saturday morning after replacement.

UNSYS:
- All good; as OCD Mikhail Yakopov reports all went fine.

SPB:
- In house activities this week at nights 9.3keV.

FXE:
- Nothing to add.

MID:
- Users went home with data. Photon energy came back very OFF on Sunday night. 

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 09.11.2022, posted by Frederik Wolff-Fabris on 09 Nov 2022, 10:07 
General Announcement:
- Martin Doering informs on the winter maintenance period: XO will publish the final task list on next Friday. For next Monday a short presentation will be done in the XO Integration meeting.
- As PRC, F. Wolff-Fabris says many machine downtimes happened since yesterday afternoon due to the trip in one LLRF station, the A6. 
This early morning an intervention was done to reduce the gradient from 620MV to 530MV. Observation in coming hours will say if this has helped to suppress or decrease the ammount of trips.

CTRL:
- News on HED VAC loop6: interlock condition was flickering. Together with HED and EEE it was found the reason and update will be done soon.

DA:
- Calibration team: two weeks ago it was introduced a picture for automatic correction. MyMdc system is still showing bugs and permanent solution is being worked out. 
Until its deployment, please call DOC for solution. K. Wrona says bug happens only if at the beginning of the run it is forgotten to change the run type.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Graphana upgrade went OK. In case of issues in the coming days please contact ITDM

XRO:
- Nothing to report.

LAS:
- AMPHOS maintenance in SA2 is under way.

UNSYS:
- M. Yakopov repaired another encoder in SA3/cell22 phase shifter on Monday morning. Also as OCD the support for moving the HXRSS crystal is being done.

SPB:
- Yesterday photon intensity jumped down as BKR mistakenly tune down one corrector in SA1 undulators instead of SA2 (when tuning HXRSS). Recovered after 1 hour.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Setting up experiment for next week. Troubles with SmarAct devices under investigation.

SCS:
- Nothing to report.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 07.11.2022, posted by Frederik Wolff-Fabris on 07 Nov 2022, 09:57 
General Announcement:
- Jan Gruenert, as PRC, reports on the Saturday night access (SA2 remained running) and on Friday evening at XTD6 done by HED. The remainder of the weekend worked well with instruments.
- A. Silenzi, as DRC, says the SA2/HED loop6 had flickering conditions that makes it irresponsible for short times. Apart of it, it was a quiet week.
- A. Galler suggests groups to check the TS announcement concerning the Dec.3rd electrical maintenance as well as the interruption of drinking water from Dec. 2nd. 
It is suggested to reduce the number of people onsite after 15:00 on Friday 02/12.

CTRL:
- Issue with update of cameras: A. Parenti says that this morning an update for Bassler cameras was installed in agreement with A. Koch. 
It addresses the issue that after pressing "stop" at cameras the Karabo was irresponsible. Cameras will be re-instantiated and will be under monitoring for the next days.
- Unresponsiveness of VAC loop6 in HED will be followed up.

DA:
- Quiet OCD last week.

EEE:
- Nothing to report.

VAC:
- Saturday evening in SA3: failure of fast valve controller for interface to Desy. Access by VAC-OCD and PRC was needed to exchange the controller and beam interruption of 4.5hs in the north branch 
happened (investigation + access). 
Rack 3.1 was affected (located behind the concrete wall at the dump).

XPD:
- All fine with XPD.

DET:
- Nothing to report.

ITDM: 
- Status of "Readthedocs": the possibility to generate new documentation is now fixed by a workaround. In mid-term a different documentation system will be used - still to be decided.
- Pre-announcement: 
1. upgrade of InfluxDB to happen during the winter maintenance period; 
2. today the update of Graphana is taking place at a proposed time 15:00 (service down for a short period). An e-mail will be sent and in case of any concerns from other groups it may be shifted to next 
Monday.

XRO:
- Nothing to report.

LAS:
- Regular maintenance and tests being carried out today.

UNSYS:
- Issues with SA3 cell9 and cell17 undulators which had taper values blocking their movement. It was solved from remote action.

SPB:
- Good data were measured last week.

FXE:
- Nothing to report; experiment was successful.

MID:
- All fine at MID.

HED:
- Apart of small issue last Friday, nothing to report.
- Transmission with MONO was too low and HED decided to stop using it during the weekend. 
- J. Gruenert adds the recalibration of SA2 XGM has to be done when changing beam path or alignment of beam.

SCS:
- Preparation for beamtime; issue with motion being addressed.

SQS:
- Not present.
Entry   Notes XO Integration Meeting 02.11.2022, posted by Frederik Wolff-Fabris on 02 Nov 2022, 10:20 
General Announcement:
- A. Galler informs groups are very welcome to contact XO for questions and discussions on the electrical maintenance task taking place on 3rd of December.
- A. Galler reminds on the beam quality Karabo device that was announced in an e-mail to xo-info@xfel.eu. 
Please instruments are asked to make use of it for that a database can be built to further investigate correlation between beam quality and environment and operating conditions.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- All fine with XPD.
- As PRC J. Gruenert informs machine had trouble on Monday while switching to 14GeV, which took longer time than planned. As consequence tuning started later on Tuesday. 
The HXRSS tuning is starting only this morning. The SA2 regular SASE intensity is still low but SA1 and SA3 runs fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Last week SA1/cell27 PS encoder motor was replaced. Suren K. says Unsys still has 5 spare motors to be used in such cases.
- Issue with stages of the Monochromator crystal in second chicane of SA2: X-axis, Y-axis and roll angle have to be controlled in local mode as encoders are broken. 
Crystal was inserted this morning into beam by Unsys staff using the local controls. Roll angle can not be seen in the camera, only Y and X-axis can be seen in camera with accuracy of 0.5mm.

SPB:
- Nothing to report.

FXE:
- Test on digitizer of a motor that worked nicely.

MID:
- Special thanks for support from Suren K., HXRSS team and XO during the weekend for providing HXRSS beam.

HED:
- Nothing to report.

SCS:
- Theta rotator last week: experiment last week went fine and motors are working.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 26.10.2022, posted by Frederik Wolff-Fabris on 26 Oct 2022, 09:59 
General Announcement:
- F. Wolff-Fabris as PRC says beam delivery is working fine and only last night it was interrupted for about 1 hours due to an issue with RF system. 
SA1 and SA3 beam is running in good performance and currently the HXRSS in SA2 improved as compared to yesterday and has achieved around 500uJ with 100uJ SASE background as of now.
- Gero Flucke as DRC says all is fine but suffering with shortage of people in DOC.
- A. Galler says that please contact XO for information/question on the power cut of December 3rd.

CTRL:
- Nothing to report.

DA:
- Nothing major to report.

EEE:
- Nothing major for the moment to report.

VAC:
- Not present.

XPD:
- No issues to report. All fine.

DET:
- Jungfrau issue reported by FXE: the detector was not expected to be used in burst mode and this probably caused the issue. The burst mode is not yet optimized (some experiments/tests were done At SPB) 
and this was not prepared at FXE.  

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with SA1 PP-laser: trigger delay device at the instruments showed issues and yesterday a patch was deployed and it works now.
- SPB requested improvement in the beam shape and LAS colleagues are working on it today.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- A. Galler informs a new He gas delivery in on the way to EuXFEL.

MID:
- DOOCS device crashed overnight: e.g. information from the undulator was lost and the clone device was gone. Fixed by DOC. 
Wajid E. and Steffen H. comment that the "refresh" button helped to re-start; the server that runs the clones for MID crashed due to unknown reasons and the refresh button worked; reason under 
investigation.

HED:
- Nothing to report.
- HED will need XGM next week.

SCS:
- User operation and issue with theta rotation of a chamber. SCS will contact EEE and CTRL.
- Question on ReadtheDocs problem: SCS uses with users for documentation and shows malfunction. 
K. Wrona comments that the servers were put in operation but software is not in good state and not easy to fix. Progress is being done with preparing a workaround. Once a strategy is known ITDM will inform 
accordingly. 

SQS:
- Nothing to report. Estimation for pulse duration during last week: Alberto De Fanis will find out internally and inform accordingly.
Entry   Notes XO Integration Meeting 24.10.2022, posted by Frederik Wolff-Fabris on 24 Oct 2022, 09:47 
General Announcement:
- Processing of the maintenance tasks lists is delayed but effort in background is ongoing. Lists will not be published next Friday and scheduling meetings will take place during this and next week. 
The release will take place on November 11th.
- As PRC, A. Galler says that nothing major is to report apart of the laser interlocks issues on Thursday and Saturday, fixed either by SRP or the instruments.
- A. Galler inform on the e-mail sent to the xo-info@xfel mailing list on the the beam quality device at Karabo. Instruments are very much invited to use it at least once per shift or when beam conditions 
change.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Having group retreat today but OCD is available.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Incidents: AMPHOS was OFF in SA3 - reason not fully understood but OCD has brought it up again.

UNSYS:
- Nothing to report.

SPB:
- Last week's Extra-foam issue with AGIPD was solved by DOC.

FXE:
- Problem with calibration of Jungfrau: it was fixed but an issue still remains. DET will discuss together with Calibration team.
- Question regarding the He gas supply: A. Galler in forms there is no new supply apart of what was received two weeks ago. The central supply must have around 40 bars as of today.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
Entry   Notes XO Integration Meeting 19.10.2022, posted by Andreas Galler on 19 Oct 2022, 08:45 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • Group retreat on Monday, Tuesday next week --> OCD available
    • ion pump controller broken in XTD1

VAC:

  • not present

XPD:

  • nothing

DET:

  • 25th of October group retreat

ITDM:

  • nothing major
  • change of FastX on max-display from FastX2 to FastX3

XRO:

  • nothing to report

LAS:

  • AMPHOS Shutter Laser issue

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Laser interlock error
  • extra foam 4 center modules from AGIPD
    • DOC / DRC to be contacted
  • jet motion
    • dynamic brake engaged because the cable was loose --> fixed

FXE:

  • extra foam issues had been sorted out
    • 16 cell mode of Jungfrau not being used

MID:

  • all fine at MID

HED:

  • collimated beam showed jitter --> downfocussing reduced the effect
  •  

SCS:

  • nothing major

SQS:

  • nothing to report