Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 424     Entry time: 07 Jun 2023, 10:35
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.06.2023 
General Announcement:
- As PRC, Jan G. says that overall the start on Monday was difficult but no major issues happened so far. SXP got the 2.5keV photon energy at best effort and planned program was carried out.

CTRL:
- Not present.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- All fine with VAC.

XPD:
- No issues for diagnostics.

DET:
- Investigation on AGIPD at HED is ongoing but is determined that the X-rays caused the damage (detector set for several runs died as it was illuminated with high intensity). 
Idea is to keep this module until the end of the run (no possibility to recover it before) and plan for exchanging damaged module for the next run will be organized.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- SCS helped SPB/SFX in giving more bunches to SA1 yesterday night.

FXE:
- Colleagues waiting for beam for 2 hours this morning to get it at the same conditions as yesterday.
***Note after meeting: machine was down for about 1hr due to overheat of a kicker at TLD system caused by high number of unused bunches sent to TLD.

MID:
- Waiting for XHRSS better conditions and machine colleagues are working on it.

HED:
- Precautions for protecting detector will be evaluated.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.