Group Selection Page
HELP
Controls Group
ITDM
Vacuum
WP78
SPB
SQS
XO
ToBeMigrated2XWiki
ToBeMigrated2GitlabPages
ToBeMigratedByGroup
Migrated2Zulip
Archived2PDF
not2MigrateOrArchive
|
|
SCS
SXP Migrated2Zulip
Photon Commissioning Team
XRO
DOC
HED Migrated2Zulip
WP74
MID
PSPO_XO
XO_Operation
SQS Migrated2Zulip
FXE Migrated2Zulip
DET
Sample Environment
SPB Migrated2Zulip
|
|
SASE1 Status and SASE3 Readiness
Technical integration and coordination
|
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
|
Message ID: 428
Entry time: 21 Jun 2023, 11:42
|
| Author: |
Frederik Wolff-Fabris |
| Location: |
General |
| Severity: |
Information |
| Subject: |
Notes XO Integration Meeting 21.06.2023 |
|
|
General Announcement:
- Tobias Clever informs on the UPS repair for SA2 and SA3 areas in the XHEXP1. A new date has to be tentatively arranged.
XO will communicate with involved parts. The on the central UPS system does not only affect green sockets but also will affect overall power while the emergency OFF is pressed.
- Please note the PRC scheduled will be restarted on July 14th only.
CTRL:
- Starting updating SA1 today, tomorrow with SA2 and SA3.
DA:
- Nothing to report.
EEE:
- Started with activities; Many instruments contact people are gone - needs a solution for the future.
VAC:
- At tunnel.
XPD:
- Hirex being protected;
- XGM switched OFF yesterday.
- Work at FEL IMG SA3: vented.
- Nothing bad appeared in the ramp down; MCP detector in SA3 found some things - to be followed up.
DET:
- Nothing to report.
ITDM:
- Started activities in all three SASEs: SASEs storage unavailable for the next 2 days
- Updates with SA1 with CTRL;
- Next week Friday gateway update; followed by FastX 3 update (URL will change as port changes - if using webbrowser to get to FastX has to be downloaded again). Details to be sent later.
- Maxwell updates on next week.
- Updates of packages at control PCs: update all hardware in all instruments, requiring reboot afterwards.
XRO:
- Tunnel doing repairs and activities: Solid Attenuator today; Got contaminated by exposure to air. XRO will disable the 75um tick diamond in SA2 (arm1) and introduce the 2.4mm tick diamnond (agreed with
instruments).
- Ramp down went well: reminder it is dedicated to ramp down (machine activities interrupted a bit) is a matter of communication to be reinforced.
- Few things were found during the ramp down.
LAS:
- Nothing to report.
UNSYS:
- Work ongoing accordingly to the plan: installed Pb shield in SA2 and SA1 in PS.
- Replaced doocs servers; batteries on Almemo sensors;
- XTD4/SA3 upgrade of absorbers in cell 22 and cell23.
- Replacing MONO in SA3
SPB:
- Not present.
FXE:
- XTD9 task today.
MID:
- Nothing to report - all ongoing.
- Please contact MID if tasks take a day or more inside MID to verify for collisions and vacations time.
HED:
- All in the retreat.
SCS:
- Not present.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |