  92   31 Mar 2017, 16:02 NEREA JARDONGeneralInformationSASE1 EPSDear all,
EPS loop is running with the latest
hardware updates. Today, when I was trying
  
  160   21 Apr 2017, 14:36 Tobias FreyermuthXTD9InformationSASE EPS RACK 1.14 disconnectWe have to disconnect the EPS crate in
RACK 1.14 in order to check the interface
to the MPS.
  
  163   21 Apr 2017, 15:30 Tobias FreyermuthXTD9FeedbackSASE EPS RACK 1.14 connected




The
EPS-loop is now complete again.
  
  178   26 Apr 2017, 18:34 Jan GrünertXTD9ProblemSA1-VAC loop down (only XTD9) and later restartedSince around 17h30 all XTD9 VAC loop is
in error. It came back in karabo around 17h50.
XTD2 not affected.
  
  347   27 Jul 2017, 15:42 Eric BoydXHEXPInformationRestricted areas Durring Radiation Measurements of SASE 1, Friday 28.07No radiation measurements have taken place
today (27.07) due to insufficent energy of
the machine. We think we can achive the desired
 Restricted_areas_for_measurments.pptx 
  225   12 May 2017, 08:21 Harald SinnGeneralInformationRestart vacuum loop now We are in the BRK and corrected the
vacuum interlock condition.
We will restart the SA1 vacuum loop
  
  238   16 May 2017, 15:59 Andreas KochXTD2FeedbackRequest for imager checksSince tomorrow there is no beam I want
to use the time for some checks of the imagers
in XTD2. Please, let the motion loop up if
  
  592   16 Jan 2019, 10:20 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX

FXE

​SQS
  
  594   21 Jan 2019, 10:43 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX

FXE

​SQS
  
  595   23 Jan 2019, 10:47 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX

FXE


Fixing session of the sample
  
  597   28 Jan 2019, 14:33 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


The vacuum section of the
burthrough monitor was vented for some intervention 
  
  593   18 Jan 2019, 11:05 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


The interlock definitions
in the tunnel were updated. They have to
  
  596   25 Jan 2019, 10:07 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


Trigger for Jungfrau detector
is needed. 
Commissioning
  
  15   02 Dec 2016, 11:47 Frederike WittmaackGeneralInformationRemote access to control network form http://tinyurl.com/jskzj2h
 
 
  
  55   28 Feb 2017, 11:38 Tobias HaasGeneralInformationReminder: Stable operation and development periodsOne word of clarification:
The discussion last Friday left some
people uncertain over how to define stable
  
  261   24 May 2017, 09:06 Tobias HaasGeneralInformationReminder: SASE1 Readiness Dispatch @ 0930 todaysee you there    
  240   17 May 2017, 08:52 Tobias HaasGeneralInformationReminder S1R Dispatch at 09:30 today in front of MCR (Mockup Control Room)    
  437   08 Jan 2018, 09:50 Monica ArestéGeneralInformationReminder Readiness meeting today at 13:00Dear all,

This is a reminder to inform you
that Readiness meeting will resume today
  
  466   31 Jan 2018, 22:34 ITDM AdminGeneralInformationRe: exflgateway migrationThe migration has finished, to avoid temporary
problem with ssh you can use

ssh exflgateway -o StrictHostKeyChecking=no
  
  457   22 Jan 2018, 15:12 Bruno FernandesGeneralInformationRe: Status report after dispatch meeting 13:00Hi everyone,

there was some miscommunication
between us and DESY: only the Timing firmware
  