Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 18 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severitydown Subject Text Attachments
  353   03 Aug 2017, 10:52 Eric BoydXHEXPInformationNo Radiation Measurements in SASE 1 This weekDo to repairs that need to be made with
the cold compressor. We will be unable to
perform Radiation Hutch Commissioning for
  
  354   04 Aug 2017, 13:41 Eric BoydXHEXPInformationRadiation Measurements of FXE Monday 07.08The control room thinks that they will
be able to very easily provide us the desired
parameters for commissioning  the FXE
 Restricted_areas_for_FXE_EXP_measurments.pptx 
  355   04 Aug 2017, 15:24 Eric BoydXHEXPInformationTime Schedule change in Radiation Measurements for MondayDear All,

We have just changed the time that
the Radiation Protection Measurements will
  
  356   07 Aug 2017, 12:45 Monica ArestéGeneralInformationStatus after 9:30 disptach meetingGeneral



The Radiation measurement
test will be postponed until the beam reach
  
  357   07 Aug 2017, 18:30 Eric BoydXHEXPInformationRadiaiton Measurements Complete for SASE 1Radiaiton Measurements are complete for
SASE 1 Normal access is restored.

 
  
  358   08 Aug 2017, 13:10 wajid ehsanGeneralInformationKARABO 2.1.13As previously announced we will deploy
KARABO 2.1.13 in tunnel under topic
SA1. The system will go down in 10 mins.
  
  359   08 Aug 2017, 15:25 wajid ehsanGeneralInformationKARABO 2.1.13The system is up and running.

Regards,

Wajid 
  
  360   09 Aug 2017, 10:23 Tobias HaasGeneralInformationStatus and Plans after 09:30 meetingGeneral



Main focus for Vacuum
Group and AE next week will be to get
  
  361   11 Aug 2017, 10:07 Tobias HaasGeneralInformationStatus and plans after SASE1/3 Readiness MeetingGeneral


The focus of activities
next week for the AE and vacuum groups is
  
  362   17 Aug 2017, 07:59 Krzysztof WronaXTD10InformationOffice network in XTD10Dear All,

In XTD10 there are now office network
ports available in each rack. These can be
  
  363   18 Aug 2017, 11:23 Tobias HaasGeneralInformationStatus and plans after SASE1/3 Readiness MeetingSoftware:


CAS meets with SPB and
FXE on a daily basis to fine tune progression
 Readiness.pdf 
  364   21 Aug 2017, 16:13 Gerd WellenreutherGeneralInformationTunnel access schedule updatedDear all,

I updated the tunnel access schedule
with the most recent information provided
  
  365   21 Aug 2017, 16:26 Tobias HaasGeneralInformationStatus and Schedule after 09:30 meetingGeneral


Access to tunnel XTD10
ends today around midday and beam is expected
  
  368   22 Aug 2017, 10:53 Hugo Silva SantosGeneralInformationKarabo 2.1.15 in Test Dear All,

I would like to report that we
started today to test (internally in CAS)
  
  369   23 Aug 2017, 10:20 Tobias HaasGeneralInformationStatus and Schedule after 09:30 meetingCAS


Finishing tests for KARABO
2.1.15. Deployment should start today during
  
  370   25 Aug 2017, 13:42 Tobias HaasGeneralInformationStatus and plans after SASE1/3 Readiness MeetingGeneral


T. Haas conveys the congratulations
of the management

for the achievements
  
  371   28 Aug 2017, 16:00 Gerd WellenreutherGeneralInformationTAS updatedDear all,

I updated the tunnel access schedule
- as you can see there will be no access
  
  372   30 Aug 2017, 09:53 Monica ArestéGeneralInformationStatus and plans after SASE1/3 Readiness Meeting
 

 
 

 
  Normal
  
  373   01 Sep 2017, 10:34 Tobias HaasGeneralInformationStatus and plans after SASE1/3 Readiness MeetingGeneral:


The length of the shut
down in October is still under discussion.
  
  374   01 Sep 2017, 20:14 Jan GrünertGeneralInformationWP74 - OCD contacts for this weekend02.09. from 08:00 until
03.09. 08:00 - Wolfgang Freund
9-5630  
  
ELOG V3.1.4-7c3fd00