Message ID: 369     Entry time: 23 Aug 2017, 10:20
Author: Tobias Haas 
Location: General 
Severity: Information 
Subject: Status and Schedule after 09:30 meeting 

CAS

  • Finishing tests for KARABO 2.1.15. Deployment should start today during the middle of the day for SPB
  • SPB asks for additional slow data to be included in the DAQ. This requires tests after 2.1.15 is deployed
  • For the moment 2.1.15 will only be deployed for SPB. Once it is installed on all control servers, switch from 2.1.13 can take place
  • The switch can be reversed in case of problems
  • AGIPD control server will remain on current software version for the moment

FXE

  • FXE was unfortunately not represented
  • AE needs to perform updates on loops 9 and 7 

Tunnels

  • Beam should be coming back today
  • XTD9 will be searched today at 1400
  • In XTD10 7/10 imagers were succefully tested and integrated. The rest will have to be done in October

AE

  • Need to test one motor for SPB/CSS
  • Yesterday 4 encoders in SPB were fixed but one additional problem was identified with the microscope stage in the sample chamber`
  • N. Jardon needs to do further updates of PLC loops for SPB. This will be done after KARABO has been upgraded, probably tomorrow

CAS

  • KARABO 2.1.15 should contain crucial fixes to associate data from tunnel devices with detector images
  • Initially this will be possible train-by-train
  • Pulse-by-pulse association, e. g. as needed for XGM, will require further work