517
|
25 Apr 2018, 13:28 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | SPB
Loops update: 1-4+8 this
week. 5-7 Wed. next week. 11-13 end next |
|
516
|
25 Apr 2018, 11:42 |
Marijan Stupar | XTD10 | Information | SASE3 MOV1 loop update | I will update the SASE3 MOV1 loop in 30
minutes. Please let me know if you would
like me to postpone the update. |
|
515
|
23 Apr 2018, 15:35 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | SPB
Timing tool for optical
laser installed
Sample chamber's |
|
514
|
18 Apr 2018, 15:06 |
Gerd Wellenreuther | General | Information | Tunnel closing after shutdown | Dear all,
below please find the hottest and
most up-to-date times for the closing of |
|
513
|
18 Apr 2018, 13:43 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | SPB
Karabo has been deployed
without major problems!
Now |
|
512
|
17 Apr 2018, 14:23 |
Torsten Schoen | XHEXP | Information | SPB emergency power off tests | Dear all,
the emergency power off test
has been successfully performed in SPB. |
|
511
|
16 Apr 2018, 14:20 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | Summary of Karabo 2.2.3 deployment
dates:
Karabo 2.2.3 deployed in |
|
510
|
16 Apr 2018, 12:38 |
Adriano Violante | XHEXP | Information | Emergency off test in FXE - Update and next steps | Dear all,
I was just informed by Ulf Brueggmann |
|
509
|
13 Apr 2018, 13:50 |
NEREA JARDON | General | Information | Shutdown MicroTCA4 SPB and FXE | This entry is on behalve of Frank Babies,
if you have any doubt about it, contact him:
On 16.Apr.2018 |
|
508
|
13 Apr 2018, 13:01 |
Adriano Violante | XHEXP | Information | Dates TÜV Test SASE3 Intelrocks | Interlock systems SASE3 - TÜV test
The pre test by D3 will be held
on 20.06. |
|
507
|
13 Apr 2018, 09:40 |
Adriano Violante | XHEXP | Information | Emergency off test in SPB/FXE | Emergency power test will be performed
at the following dates:
FXE - Mon. 16.04. |
|
506
|
13 Apr 2018, 09:05 |
Torsten Schoen | XHEXP | Information | SASE3 E.21 and E.22 electrical power distribution | changes according to the racklist on the
electrical power distribution cabinets for
rackrooms E.21 and E.22 are done. Power supply |
|
505
|
13 Apr 2018, 07:50 |
Adriano Violante | General | Information | Karabo 2.2.3 installation | Hi all, for your information below a message
from Chris Youngman concerning Karabo 2.2.3
installations in SASE3. |
|
504
|
12 Apr 2018, 15:34 |
Adriano Violante | General | Information | Water cooling mointenance by MKK done | Die Arbeiten an der Kühlwassersteuerung
konnten innerhalb des genannten
Zeitraums abgeschlossen werden, |
|
503
|
11 Apr 2018, 13:48 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | SPB
Detector z motion would
be needed. AE checks the status of the crate. |
|
502
|
09 Apr 2018, 14:37 |
Adriano Violante | General | Information | Karabo deployment dates | FYI
Below
the E-Mail from Hugo Santos with the Karabo |
|
501
|
09 Apr 2018, 14:25 |
Adriano Violante | General | Information | Status report after dispatch meeting 13:00 | General
Emergency off test in SPB is shifted.
Date to be agreed on Friday. FXE test stays |
|
500
|
09 Apr 2018, 11:50 |
Adriano Violante | XHEXP | Information | Emergency off test in SPB/FXE - Update | Due to some delay in the installation of
some necessary cables, the emergency power
off test foreseen for today 06.04. in the |
|
499
|
04 Apr 2018, 17:46 |
Janusz Szuba | General | Information | maintenance of the online storage system | On Friday, 6.04, there will be a maintenance
of the online storage system. This will tackle
the issues we had just before the last user |
|
498
|
04 Apr 2018, 17:35 |
Janusz Szuba | General | Information | Control network maintenance | Tomorrow, 5.04, between 9:30 and 12:00
there will be urgent maintenance of one of
the two redundant main switches for the control |
|