Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 5 of 31  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subject
  525   26 Jun 2024, 09:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 26.06.2024
General Announcement:
- Water leak in one of the racks (3.13 / XTD10) in the tunnels that needs attendance. The power for this rack will be cut to investigate and exchange the heat exchanger. Possibly happening at 11:00AM 
today. 
Groups affected are VAC, IT and EEE. Repair is necessary as quickly as possible. Please check for components to that rack and switch them down before the power cut at 11:00.
- Andreas G. informs on the Monday's emergency power off task proposed to take place today at SA3: This work is postponed to the winter maintenance period. 
Only two new search buttons will be installed at SCS this week however it does not need emergency power OFF, meaning no effects on electricity and/or interlocks.

CTRL:
- Proceeding with Karabo update.

DA:
- Nothing to report.

EEE:
- Progressing with maintenance tasks.

VAC:
- Not present due to tunnel activities.

XPD:
- Tasks ongoing as planned.
- Message for CTRL and DA: Gotthard-II was installed in SA2 and water connections made. It is ready to be deployed as soon as SA2 Karabo is back. Please CTRL inform XPD/Naresh K. when Karabo is back.

DET:
- Nothing to report.

ITDM: 
- Ongoing with maintenance.
- No news for Maxwell yet; needs a follow up.
- Needs to restore components when power is back in rack 313.

XRO:
- Not present.

LAS:
- Tasks ongoing as planned.
- Lasermet installations are done.

UNSYS:
- Try to understand the level of hardware that needs to be replaced in the long maintenance. The power cycling of the cabinets brings problems for the terminals. 
One needs to replace all linear encoders in the undulators or at least the ones that does not work.
- Currently all ready for starting next Run 2024_02.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Incident with Jungfrau detector: together with DET checking of repair can be done in modules.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
  524   24 Jun 2024, 10:11 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.06.2024
General Announcement:
- Eric Boyd and Torsten Schoen: work by MPS / Wille company in SA3 radiation protection hutches will trigger emergency OFF button on Wednesday. Rack rooms connected to these hutches are also affected.
Decision if task takes place to be done after internal discussions between parts. XO will coordinate together with Eric Boyd.

CTRL:
- Start with summer maintenance: today with SA1 area.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- Not present.

DET:
- Nothing to be reported.

ITDM: 
- Continuing with maintenance activities: today Maxwell cluster is updated; all activities are going accordingly to the plan.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  523   19 Jun 2024, 09:48 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.06.2024
General Announcement:
-	 

CTRL:
- Perform tests on watchdogs with XPD after this meeting.

DA:
- Nothing to report.

EEE:
- Today start with cable installations at SQS - be careful with cables when walking.
- Many tasks are ongoing.

VAC:
- Nothing to report.

XPD:
- Ramp down day yesterday by XRO and XPD; issues were identified and solved. Time was useful and successful.
- Tests with Imagers without X-ray beam are being done today.

DET:
- Start with maintenance tasks.

ITDM: 
- First day with activities on servers and clusters at balcony room.
- Maxwell update on 24.06 will be advertised by e-mail today.

XRO:
- Not present.

LAS:
- Start with shutting down lasers today.
- Safety interlock work in SA3 laser areas takes up to end of next week that requires Electrical expert present (see e-mail from Torsten S.). 
Emergency OFF button is only valid for the laser rooms/hutches in SA3.

UNSYS:
- Replace SA1 cell22 PS motor from today.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- All fine at MID; going accordingly to the schedule.

HED:
- Nothing to report.

SCS:
- Moving experimental chamber today through the Hall.

SQS:
- Not present.

SXP:
- Not present.
  522   17 Jun 2024, 09:38 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.06.2024
General Announcement:
- Summer maintenance is about to start on Wednesday; tomorrow the XRO and XPD ramp down activities are planned. 
- The XO Integration meeting continues to happen during the summer maintenance period.

CTRL:
- Nothing to report; preparing for the summer maintenance.

DA:
- Nothing to report and quiet on the OCD side.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.
- Maxwell maintenance: Likely to be done Monday/Tuesday of last week of June is the deployment. E-Mail will be sent.

XRO:
- Nothing to report.

LAS:
- Nothing to report.
- SA1 issue of last weeks with drifting: sync system maintenance was not announced and found to be the reason for it. Right now it is fixed. Also master time was reset by EEE.

UNSYS:
- Everything fine apart of the SA1/cell22 PS motor to be replaced when tunnels are open.

SPB:
- Not present due to the ongoing retreat.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Start with maintenance tasks.

SQS:
- Nothing to report.

SXP:
- Not present.
  521   12 Jun 2024, 10:01 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.06.2024
General Announcement:
- This is the last operation week with beam delivery for users for this Run.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Yesterday afternoon an issue with V0 closing was solved.

XPD:
- A. Galler informs that on SPB/SFX branch the XGM was switched OFF by Theo M. as part of preparation for the summer maintenance that triggered the V0 valve.

DET:
- Nothing to report.

ITDM: 
- Announcement: upgrades of some systems will happen in last week of June after agreement with Desy-IT.
- Dcache system will also be updated in the same days, for about 2 days.
- General announcements will be sent around in due time.

XRO:
- Nothing major to report.

LAS:
- Unexplained issue in SA1 by oscillator shifted against the triggers. Under investigation.

UNSYS:
- Nothing to report.

SPB:
- Issue with AGIPD with intervention on chiller + modules exchanges and will not take beam this Run.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present due to Fusion workshop.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  520   10 Jun 2024, 10:03 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.06.2024
General Announcement:
- Martin Doering presents the summer maintenance plan: 
1. Complete task lists was released last Friday; 
2. ITDM and CTRL dates: a. Karabo down from 24.06 to 02.07 depending on the topic; b. DAQ unavailable from Jun 18th to Jul. 2nd; c. replacement of exflgateway on Jun 28; d. upgrade of operations elog on 
Ju. 2nd. 
3. No major intervention cooling water apart of fluctuations on flow and temperature; 
4. No interruptions of electricity; 
5. Safety tests: a. interlock tests in experimental hutches on July 9-10.; b. SEPS and AIBS tests on July 22.  
- As PRC, Martin Dommach says everything went quiet last week.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Yesterday at SPB/SFX operation was interrupted due to Julabo chiller in AGIPD 1-M. Managed to put system back online after few hours.

ITDM: 
- Nothing to report.

XRO:
- Everything fine.

LAS:
- Not present.

UNSYS:
- Issue with phase shifter SA1/ cell22: needs a ZZ to replace parts today due to availability of people. To be discussed later.

SPB:
- Chiller issue; in discussion with DET.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  519   05 Jun 2024, 09:55 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.06.2024
General Announcement:
- On Monday 10.06 a few slides on the Summer maintenance will be presented by Martin Doering in this meeting series. The task list will be released next Friday 07.June.

CTRL:
- Working on the all watchdog: hotfix was released last Monday and follow up is being done. Will get in touch with instruments for deployments if needed.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Everything is running fine.

XPD:
- In a retreat.

DET:
- Nothing to report; as info: DAC meeting is taking place this week at XFEL.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Sync issues seen at SCS last weekend were fixed and did not happen again.

UNSYS:
- On SA1 cell#21, two ZZs were needed on Monday: first power distribution was replaced; 
after switching on cabinet the linear encoders were not communicated and after placing controller to the rotary encoders the motor of the PS was found broken and was replaced.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Problem with on a spectrometer camera: ticket was sent to CTRL and needs further help. 
Wajid E. says DOC was also contacted and seems to be an issue with the hardware/camera as controls side it seems fine. A test with a spare camera is needed.

SCS:
- 400nm laser issue: follow up on the info regarding this failure is appreciated to be shared to other instruments that perform pump-probe experiments.

SQS:
- Not present.

SXP:
- Not present.
  518   03 Jun 2024, 09:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 03.06.2024
General Announcement:
- As PRC, Maurizio V. informs on: 1. Fire alarm in tunnels / SA2 cost beamtime on Saturday as beam permission was removed; 2. PP-laser synchronization seems solved; 3. HED setting point was slightly 
changed but assumed to be fine. 


CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- It was observed at SA2 XGM too large a background synchrotron radiation signal. It was removed when Graphite filter was inserted in SA2 and it may relate to the attempt to delivery 9keV at 11.5GeV.

DET:
- Nothing to report.

ITDM: 
- Network update: move of the rack in room 27 is finished and network is running again. Please users check the system and report back to IT-support ticket system in case something is found to be wrong.

XRO:
- Nothing to report.

LAS:
- Sync issue in SCS: PP-laser went out of LOCK and Desy Sync group adjusted the internal clock and is currently optic synchronized.

UNSYS:
- Limit switch of cell3 in SA2 was activated while attempting to reach minimum gaps; fixed by UNSYS-OCD.
- Fire alarm was related to a fire extinguisher system in an undulator rack as the fan was broken.
- Wrong phase shifter gaps related to middle layer server; people working on it.

SPB:
- Preparing for Tuesday starting with beam.

FXE:
- Not present.

MID:
- Broken nano-second laser system at MID: chiller pump of the laser broke two days before user beamtime and a new order is ordered but arrives this week. 

HED:
- Nothing to report.

SCS:
- The 400nm laser use was cancelled due to damage optics.

SQS:
- Nothing to report.

SXP:
- Not present.
  517   29 May 2024, 09:45 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.05.2024
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.
- Silicon oil leak in DET lab: team was investigating and seems to be fixed by now. It is particular to this lab installation and is not similar to the ones in the instruments.

ITDM: 
- Rack move in E.0: rack has been moved to final position. Related components also moved; at the moment coordinating with room managers to make inside installations. All going smoothly and accordingly to 
the plan.

XRO:
- Not present.

LAS:
- Issue with timing jumps by SQS: debug has been done with EEE and Sync groups. Front end was changed yesterday but did not solved. 
The uTCA slave card (in the PP-laser rack) was drifting and this card was also changed last evening. There is less jitter and issue seems to be solved now.

UNSYS:
- Nothing to report.

SPB:
- Preparing beamline for next user.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Issues from the weekend: 1. interlock hutch door contact broken; 2. Misunderstanding on tuning for SA1 without notifying SQS members. 
- A. Galler comments that the tuning was discussed with instruments and likely another shift crew in the instruments were knowing the tuning operation and this information was not passed to all member of 
SQS.

SXP:
- Not present.
  516   27 May 2024, 09:41 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 27.05.2024
General Announcement:
- Thanks to all groups who have submitted the Summer/24 maintenance task list. In case you haven't done yet, please inform at xo-planning@xo.eu when you are planning to do so.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Issue with AGIPD-1M yesterday evening. DOC was called because of a misbehavior: hardware problem since several exits show high current and causes channels to trip for M1 module. 
Detector is back online but with 4 channels OFF (30% of this module). More investigation will follow.

ITDM: 
- Nothing to report: progressing with IT rack change and hopefully will meet deadline by Tuesday next week.

XRO:
- Nothing to report.

LAS:
- Just got a message from SPB/SFX with problem in wavelength in SPB/SFX laser. Will be looked at after the meeting.

UNSYS:
- Everything fine.

SPB:
- AGIPD and PP-LAS issues already reported.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Fine at HED.

SCS:
- Not present.

SQS:
- Not present.

SXP:
- Not present.
  515   22 May 2024, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 22.05.2024
General Announcement:
- Next Friday 24.05 is the deadline to submit maintenance task lists. Please contact XO in case you are not prepared to submit by the deadline.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Issue with Hexapod in HED: under investigation by EEE and Bernard B. Not having the Hexapod will affect the experiment this week. A back plan exists but no guarantee it works if a fix can't be done. 

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Julabo chiller at SPB/SFX does not maintain the low temperature - under work.
- Two weeks ago (user experiment) some AGIPD modules at SPB/SFX were exchanged and damage has been found at the new modules. 
A report by SPB/SFX will be written for that it does not happen again as if damages are frequently happening one will run out of spare modules.

ITDM: 
- Works started in the network at lab areas and are ongoing.

XRO:
- Nothing to report.

LAS:
- Flatness of SPB PP-laser under investigation;
- SA3 PP-laser stain issue did not go away: manufacture of front-end amplifier is contacted; further tests to be done today.

UNSYS:
- Not present.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Hexapod issue already mentioned.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
  514   15 May 2024, 09:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2024
General Announcement:
-	 

CTRL:
- Nothing to report.

DA:
- All fine from DA.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- All fine with diagnostics;
- First shift yesterday for studies with beam steering in SA1 and today the continuation.

DET:
- Nothing to report.

ITDM: 
- Reminder for the announcement on the network works on next Tuesday in the lab areas (see also sent e-mail). No strong objections were presented so far. Please contact urgently ITDM in case of questions.
- Room managers have to grant access to the workers during the Network maintenance.

XRO:
- Everything fine.
- Working today with Euler MDL.

LAS:
- On timing jumps and spectrum shifts for SA1 PP-laser reported last Monday: timing jumps under investigations by EEE (not happened since Monday); changes during the shifts under investigation.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  513   13 May 2024, 09:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 13.05.2024
General Announcement:
- A. Galler reminds that entries from the instruments taking beam at the Operation-2024 e-log is highly appreciated.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue Friday night at 02:28AM: the SA2/XTD1 XGM stopped delivering single shot data. There was an interlock of high voltage HAMP (over current happened). 
It was repaired earlier in the morning around 08:30AM but further investigation is ongoing. 
MID did not take beam during that time due to another issue happening in parallel, so no data needed from XGM were lost.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- Everything is fine.

SPB:
- Piezo motors for the PP-laser had issue but now it's solved.

FXE:
- Problem with PP-laser (fundamental spectrum) was fixed by OCD.
- PP-laser timing jump after shift changes from SPB/SFX.
- Problems with dark taking for the Jungfrau which was reported to DOC - as DRC, Phillip Schmidt reports that refreshing the myMDC page permits to make data visible.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Users are taking beam.

SXP:
- Not present.
  512   08 May 2024, 09:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.05.2024
General Announcement:
- A. Galler inform that if a hutch radiation alarm is triggered please familiarize yourself with the procedures. It can be helped by Hall Crew and/or D3. Operation is stopped when this alarm is triggered.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Problems with AGIPD-1M at MID: one module does not send proper data. Under work;
- Last week issue with AGIPD at SPB: modules were flickering and major intervention is needed to further investigate. Issues with calibration and data quality: work is ongoing.

ITDM: 
- Everything is fine.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine and yesterday the ZZ was not needed.

SPB:
- Issue with AGIPD-1M data quality is been worked on.

FXE:
- Not present.

MID:
- AGIPD module issue already mentioned by DET.
- 2.4mm CVD foil attenuator seems to be damaged; it will be discussed with XRO.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report, starting to take the beam.

SXP:
- Not present.
  511   06 May 2024, 09:21 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.05.2024
General Announcement:
- Summer maintenance task list was sent to the groups. Please contact XO in case of questions or if your group did not receive the list.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Discussion ongoing for the summer maintenance tasks.

VAC:
- No OCD calls for VAC and systems seemed to be not affected by this morning's power glitch at 05:47AM.

XPD:
- Everything fine with diagnostics.

DET:
- Nothing major to be reported.
- 500k AGIPD over the weekend was helped by DOC and DATA OCDs solved.

ITDM: 
- Nothing to report.

XRO:
- Event of misalignment of M6 on Friday for SA3/SXP under investigation. It will be discussed with SXP.

LAS:
- Not present.

UNSYS:
- All fine with undulators.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to be reported.

HED:
- Running and thanks to DOC and OCDs for AGIPD help.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  510   29 Apr 2024, 11:35 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.04.2024
General Announcement:
- Martin Doering announces the 2024 summer maintenance period: 
1. Release MTL on May 3rd; 
2. deadline to submit back tasks on May 24th to xo-maintenance@xfel.eu ;
3. Maintenance starts on Jun19th. 
4. Interlock tests on July 1st-11th; 
5. There are 119 recurring tasks that happen often during maintenances which are showed in XO Alfresco page under Maintenance Planning (start and ending dates will be determined during scheduling period); 
6. For further questions please contact XO at xo-planning@xfel.eu

- Janusz S. and Kimon F. announce an eminent downtime on network for Lab and T0 areas to perform the exchange of the battery UPS location. It will take place on May 21st. 
Please affected groups to give a feedback. Safety group will also be involved as it affects the wireless network. Network shutdown takes place during two weeks. 
A. Galler asks all groups that have rooms in lab areas to contact Kimon F. and/or Janusz S..

- Next Wednesday due to the public holiday there is no XO Integration Meeting.

CTRL:
- Tomorrow the SA2 broker update takes place in coordination with XO.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Trouble with Ion pump controller at HED branch on Thursday evening. Clarified by VAC-OCD and PRC and an access tomorrow morning is needed to exchange the controller.

XPD:
- Nothing to report.

DET:
- Nothing to be reported.

ITDM: 
- Janusz S. informs on tomorrow gateway reboot taking place tomorrow between 10Am and 11AM.

XRO:
- Not present.

LAS:
- Not present.

UNSYS:
- SA3 cell 21 phase shifter needs ZZ in tunnel.

SPB:
- Problems with uTCA for some controllers contacted with DOC.

FXE:
- Issue with data aggregator giving fault when too many were acquired and some data were lost. Steffen H. said is was addressed and shall be stable now - a test by FXE will be done.

MID:
- Small problem scanning photon energy with the seeding crystal.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Change on experimental plan but parameters are kept the same for cw19.
  509   24 Apr 2024, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.04.2024
General Announcement:
-	 

CTRL:
- Broker incident on SA2 and LAS topics last Saturday: update to be done in a split mode; 
SA2 topic could not be done yesterday so is planned for Tuesday 30.04 morning and LAS topic to be done still this week as none uses PP-laser.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Everything fine;
- SA2 FEL IMG issue: linked mainly to a bridge connection to DOOCS (left over from broker issue on Saturday). Restart it only yesterday and not during the weekend. 

DET:
- Nothing major;
- Feedback from Jungfrau test at SPB last week: unfortunately, did not fully run as expected as user Bragg magnifier scene was optimized at 10keV and not 21keV. 
Nevertheless, data could be seen and it was useful to have beamtime.

ITDM: 
- On EXFEL Gateway: need to apply a fix and update security; an e-mail will be sent for scheduling on next Tuesday.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Everything fine.

SPB:
- Nothing o report.

FXE:
- Problem with middle layer server reported to DOC this morning. It seems solved after server restarted.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Issue with detector/data found last week and on the way to be fixed for next week. 
  508   22 Apr 2024, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 22.04.2024

General Announcement:

  •  

CTRL:

  • Broker Issue in SA2 on Saturday evening
    • LA2 and SA2 topic restarted

DA:

  •  

EEE:

  • nothing to be reported

VAC:

  •  

XPD:

  • everything fine

DET:

  • nothing major

ITDM: 

  • nothing major

XRO:

  •  

LAS:

  •  

UNSYS: 

  • Everything fine

SPB/SFX:

  • everything worked fine

FXE:

  • nothing to report

MID:

  • all fine

HED:

  •  

SCS:

  • nothing

SQS:

  • nothing

SXP:

  • nothing

DRC

  •  

PRC

  • HED was not taking beam during the SA2 broker issue, as a hardware change was being done
    • by 2 am Sunday the systems were recovered and working

AOB:

  •  
  507   17 Apr 2024, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.04.2024
General Announcement:
- A. Galler inform on the transponder/access issues at XHEXP1 last two days: when turnstiles are not working, people shall not get though and enter experimental Hall. 
This is a safety break that will be taken by SRP. Please do not enter Hall if turnstiles are not working. 
- As DRC, A. Silenzi informs there is nothing to report so far.

CTRL:
- Together with XPD and XRO a new version of DAQ in tunnels was installed and tested. All went fine.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Nothing to report. Repair on Monday went successful.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- DAQ Switch in SA3 was exchanged and work fine.
- GPFS update is postponed to a later date (tbd).

XRO:
- SA2 ATT #5 (1.2mm CVD) is replaced and working.
- SA1 mirror is calibrated to work with Euler motions.
- SPB/SFX is aligned with 22keV beam.

LAS:
- Nothing to report.

UNSYS:
- PS motor in SA1/cell23 was replaced yesterday by a ZZ.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  506   15 Apr 2024, 09:31 Andreas GallerGeneralInformationNotes XO Integration Meeting 15.04.2024

General Announcement:

  •  

CTRL:

  • SA1 DAQ upgrade

DA:

  • nothing to report

EEE:

  • nothing major

VAC:

  • involved in XTD1 solid attenuator repair
    • inform control once its done for MDL

XPD:

  • nothing major

DET:

  • nothing major

ITDM: 

  • FES switch for SA3 DAQ update will be replaced today --> DAQ won't be available
    tomorrow gpfs pclayer update

XRO:

  •  SA1 Solid Attenuator repair & SA1 21-22 keV beam transport alignment had been done

LAS:

  • not present

UNSYS: 

  • nothign major

SPB/SFX:

  • beam is prealigned for 21- 22 keV this week, lots user prepartion

FXE:

  • mothing major

MID:

  • allfine

HED:

  • not present

SCS:

  • nothing

SQS:

  • not present

SXP:

  • not present

DRC

  •  

PRC

 

AOB:

  •  

 

 

ELOG V3.1.4-7c3fd00