Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 575     Entry time: 18 Dec 2024, 09:55
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 18.12.2024 
General Announcement:
- This is the last XO Integration meeting this year.
- Wajid E. reminds attendance to write a ticket to CTRL when needed 

CTRL:
- Done with SA1 and SA2 Karabo update; today proceeds the SA3 update, to be done by mid-late afternoon.

DA:
- Nothing to report.

EEE:
- uTCA updates have been performed in all SASEs; All system up and running.
- One small CPU needs manual intervention in tunnel.
- GATT loop update is up and running now.
- Wolfgang F. says the XFELO crate in SA1 has a crate not working; EEE is looking into it and CTRL is working on the new device. A ticket is created.

VAC:
- Ending most of tunnel activities (XTD2, XTD6 and XTD10) which progressed well. Seems to be all done by end of this week.

XPD:
- PES has been put back in tunnel: was connected and pumped; looks all fine so far and can be brought in operation.
- XFELO worked were done, just missing the ADC (see EEE report);
- Imagers work were done with good progress.

DET:
- Systems are put in Christmas break.
- Tests after Karabo and uTCA updates looked good.

ITDM: 
- E-mail to xo-info was sent about office switches.
- Friday afternoon the XFEL gateway will be updated.

XRO:
- Finishing the last activities.
- Cameras in SA2 had problems (not know if hardware or software issues). In January new tests will be done. Maybe access could be required to check or fix at later 
date.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00