Entry   Notes XO Integration Meeting 03.06.2024, posted by Frederik Wolff-Fabris on 03 Jun 2024, 09:54 
General Announcement:
- As PRC, Maurizio V. informs on: 1. Fire alarm in tunnels / SA2 cost beamtime on Saturday as beam permission was removed; 2. PP-laser synchronization
seems solved; 3. HED setting point was slightly 
Entry   Notes XO Integration Meeting 03.06.2020, posted by Frederik Wolff-Fabris on 04 Jun 2020, 13:31 
General Announcement:
- Summer shutdown is nearing. Few dates on crane maintenance at XHEXP1 were sent to the readiness mailing list. Please be aware on the dates when planning
activities. 
Entry   Notes XO Integration Meeting 03.05.2023, posted by Frederik Wolff-Fabris on 03 May 2023, 09:49 
General Announcement:
- The current week is the first 16.3GeV week of this run in 2023.
- On the summer maintenance period: one list is still missing but is being mitigated. XO thanks for submitting lists on time.
Entry   Notes XO Integration Meeting 03.05.2021, posted by Frederik Wolff-Fabris on 03 May 2021, 10:06 
General Announcement:
- The deadline for submitting the summer maintenance tasks is ended. In case you have not done so, please submit it as soon as possible.
- Monica T. as DRC invites people to attend the DRC jour-fixe meeting.
Entry   Notes XO Integration Meeting 03.04.2024, posted by Andreas Galler on 03 Apr 2024, 09:28 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 03.04.2023, posted by Frederik Wolff-Fabris on 03 Apr 2023, 09:42 
General Announcement:
-  
Entry   Notes XO Integration Meeting 03.03.2025, posted by Frederik Wolff-Fabris on 03 Mar 2025, 09:48 
General Announcement:
- For next Friday 07.03 UOM a jitter report from instruments is expected together with presentations from groups using beam during this FD week.
Entry   Notes XO Integration Meeting 03.02.2025, posted by Frederik Wolff-Fabris on 03 Feb 2025, 09:39 
General Announcement:
- Experiment tuning week is ongoing; Two downtimes happened over the weekend due to 1. an electronic component part of quench circuit of a cold magnet
in A20 (11hs) and 2. interlock issues at the injector 
Entry   Notes XO Integration Meeting 03.02.2021, posted by Arvid Gebhardt on 03 Feb 2021, 09:26 
General Announcement:

- Automatic Power Switch Testing was done yesterday. The switches are working as expected and a protocol has been produced. Torsten Schoen
informs this test is done every 4 years; from now on equipment can be connected again to the orange and green power outlets.
Entry   Notes XO Integration Meeting 02.12.2024, posted by Frederik Wolff-Fabris on 02 Dec 2024, 09:56 
General Announcement:
- A. Galler informs on the changed schedule for Operation due to the difficulties with the cry plant last week: the current beamtimes are extended until
Wed 07:00 and then tuning for cw49 will take place. 
Entry   Notes XO Integration Meeting 02.12.2020, posted by Frederik Wolff-Fabris on 02 Dec 2020, 10:21 
General Announcement:
- Laser interlocks activities in SA2 are delayed by two days. Therefore, activity in SA1 will start later.
- Gerd W. reports the cooling water in SA3 was refilled; air conditionings are running and maintenance on them are ongoing; 
Entry   Notes XO Integration Meeting 02.11.2022, posted by Frederik Wolff-Fabris on 02 Nov 2022, 10:20 
General Announcement:
- A. Galler informs groups are very welcome to contact XO for questions and discussions on the electrical maintenance task taking place on 3rd of December.
- A. Galler reminds on the beam quality Karabo device that was announced in an e-mail to xo-info@xfel.eu. 
Entry   Notes XO Integration Meeting 02.11.2020, posted by Frederik Wolff-Fabris on 03 Nov 2020, 08:39 
General Announcement:
- A. Galler reminds the attendance that this meeting is also an opportunity for making comments/questions on the new Covid-19 rules that start to take
place.
Entry   Notes XO Integration Meeting 02.10.2024, posted by Frederik Wolff-Fabris on 02 Oct 2024, 09:41 
General Announcement:
-  
Entry   Notes XO Integration Meeting 02.10.2023, posted by Frederik Wolff-Fabris on 02 Oct 2023, 09:59 
General Announcement:
-  
Entry   Notes XO Integration Meeting 02.09.2024, posted by Frederik Wolff-Fabris on 02 Sep 2024, 09:53 
General Announcement:
-  
Entry   Notes XO Integration Meeting 02.09.2020, posted by Frederik Wolff-Fabris on 02 Sep 2020, 13:33 
General Announcement:
- If instruments find the machine is not performing as you expect when comparing to previous weeks, please contact PRC that he may help you to address
it. 
Entry   Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be
Entry   Notes XO Integration Meeting 02.08.2021, posted by Frederik Wolff-Fabris on 02 Aug 2021, 12:06 
General Announcement:
-  
Entry   Notes XO Integration Meeting 02.06.2021, posted by Frederik Wolff-Fabris on 02 Jun 2021, 10:24 
General Announcement:
- XO reminds staff to check the safety trainings and the DACHS access rights/permissions for the tunnels when planning tunnel accesses during the maintenance
period. 