Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 27 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subjectdown Text Attachments
  334   14 Jul 2017, 12:44 Martin DommachXTD9ProblemFast Valves in XTD9Dear all,

the fast valves in XTD9 were causing
some trouble. From time to time they collect
  
  136   11 Apr 2017, 18:29 Raśl Villanueva-GuerreroXTD2FeedbackFast Valve Test - SUCCESFUL The Fast Valve test has been positively
tested. 
It has been consider that the signal
  
  447   11 Jan 2018, 15:17 Bruno FernandesGeneralInformationFXE/SPB/PPL Timing UpdateHi everyone,

after talking with the responsabile
people, here's the timetable for the
  
  492   25 Mar 2018, 10:57 Gerd WellenreutherXHEXPProblemFXE emergency power-off has been triggeredDear all,
apparently the Emergency Power-Off
at FXE was triggered at around 10:00 - 10:30
  
  443   10 Jan 2018, 14:54 Dennis GoeriesGeneralInformationFXE MonoHi,


the FXE Mono's won't
be available via Karabo from 15.30 onwards
  
  435   14 Dec 2017, 09:12 Lewis BatchelorXTD2InformationFXE Collimating CRLThe LENS_3X limit switch (switched when
driving towards the chamber center) is broken
and must be replaced, hence further work
  
  476   20 Feb 2018, 12:29 Eric BoydGeneralInformationFXE Beam Shutter KeyThe FXE beamshutter key has been installed
into the interlock system after satisfactory
completion of the FXE Chicane and Radiation
  
  156   21 Apr 2017, 12:28 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL Due to problems and lack of support
of CAS for accessing the devices in XTD9
tunnel through KARABO we couldn´t run
  
  157   21 Apr 2017, 13:23 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL

    

       
            
  
  158   21 Apr 2017, 13:35 Raśl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL


   
        
            
  
  453   17 Jan 2018, 16:53 Bruno FernandesGeneralInformationEvent #16 back to 1Hz Dear all,

I communicated today on the 13h
meeting that the Trigger #16 was back to
  
  454   19 Jan 2018, 16:06 Bruno FernandesGeneralInformationEvent #16 back (for good) to 10Hz Event trigger #16 is now back to 10Hz and
it will still that way.
  
  141   13 Apr 2017, 10:15 Alessandro SilenziGeneralProblemEtherCAT loop broken for Vacuum loopThe EtherCAT loop for the vacuum PLC is
interrupted at crate 1.6 (XTD2).
This triggered all Beckhoff Terminals 
  
  500   09 Apr 2018, 11:50 Adriano ViolanteXHEXPInformationEmergency off test in SPB/FXE - UpdateDue to some delay in the installation of
some necessary cables, the emergency power
off test foreseen for today 06.04. in the
  
  507   13 Apr 2018, 09:40 Adriano ViolanteXHEXPInformationEmergency off test in SPB/FXEEmergency power test will be performed
at the following dates:

FXE - Mon. 16.04.
  
  510   16 Apr 2018, 12:38 Adriano ViolanteXHEXPInformationEmergency off test in FXE - Update and next stepsDear all,

 

I was just informed by Ulf Brueggmann
  
  193   29 Apr 2017, 10:04 Hugo Silva SantosGeneralInformationERRATA: CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid  Dear All,
Still in time, I would like to correct
out schedule.
  
  114   07 Apr 2017, 11:12 NEREA JARDONGeneralInformationEPS loopDear all, I will update EPS loop in order
to integrate new hardware changes. I will
post a new entry when the work is done.
  
  115   07 Apr 2017, 11:57 NEREA JARDONGeneralInformationEPS loopDear all, EPS loop is again up and running.
Thank you!
  
  134   11 Apr 2017, 15:38 NEREA JARDONGeneralInformationEPS loopDear all,
The EPS loop would be stopped, in
order to correct some issues with the hardware
  