Motion loop, posted by NEREA JARDON on 04 Jul 2017, 11:47
|
It will be replaced today around 1pm.Therefore Motion loop will be broken from this rack position.
NEREA
JARDON wrote:
We are finished. One encoder terminal has failed and needs replacing: |
Motion loop, posted by NEREA JARDON on 04 Jul 2017, 14:07
|
The encoder terminal in rack 1.5 has been replaced.
NEREA
JARDON wrote:
It will be replaced today around 1pm.Therefore Motion loop will be |
K-Mono control, posted by Wolfgang Freund on 10 Jul 2017, 14:35
|
During the first K-Mono test with Karabo on Friday the first goniometer THETA1 (Elmo controller) moved beyond the CW limit switch and stopped at
the CCW switch. So the goniometer was trapped between both switches with a movement range of a few degrees. Movement of encoder and motor were opposite.
This behaviour is not understood and under investigation. |
FXE Collimating CRL, posted by Lewis Batchelor on 14 Dec 2017, 09:12
|
The LENS_3X limit switch (switched when driving towards the chamber center) is broken and must be replaced, hence further work is required on the next
JJ visit 9/10 Jan (TBC)
The in vacuum components also need further work during the above visit. The lens that lost alignment during commissioning was also found to be |
Rack 1.2 Timing Update, posted by Bruno Fernandes on 17 Jan 2018, 15:55
|
Dear all,
following up from the message #449, the MicroTCA Crate in rack 1.2 has been rebooted. Timing system hardware is now running firmware v1.24.0. |
XTD10 not open on Monday, posted by Harald Sinn on 11 May 2017, 18:26
|
Dear all,
contrary to the rumor that I spread last Tuesday in the PBS meeting, the magnet tests in XTD2/4 will be NOT done coming Monday and therefore the
XTD10 will be be NOT open. It is still the plan to have one access day in XTD10 per week in the future (Monday or Wednesday to be clarified with the magnet |
Office network in XTD10, posted by Krzysztof Wrona on 17 Aug 2017, 07:59
|
Dear All,
In XTD10 there are now office network ports available in each rack. These can be used to connect your regular laptops with a network cable without
special configuration and registration of your laptop. |
XTD10 closed and interlocked, posted by Tobias Haas on 26 Oct 2017, 17:34
|
The SASE3 tunnel XTD10 was searched by Janni and her team and interlocked about one hour ago.
It is now almost ready for first lasing in SASE3:
The vacuum is completely connected and closed from V0 all the way to the end
All valves, pumps and gauges are included in |
MicroTCA in rack 3.4/XTD10, posted by Bruno Fernandes on 10 Jan 2018, 17:35
|
The MicroTCA crate used in rack 3.4 (XTD10) has been replaced. The system is up and running. Timing information is properly distributed from this system
to the MicroTCA system in rack 3.2 and XGMXTD10. |
closing of XTD10 shifted to Wednesday, posted by Martin Dommach on 29 Jan 2018, 10:32
|
Dear all,
the closing of the XTD10 tunnel is shifted to Wednesday (January 31st.) at 2 p.m.
Best regards, |
SASE3 MOV1 loop update, posted by Marijan Stupar on 25 Apr 2018, 11:42
|
I will update the SASE3 MOV1 loop in 30 minutes. Please let me know if you would like me to postpone the update.
Best regards,
Marijan |
SASE3 loops will restarted at 11:30, posted by Alessandro Silenzi on 28 Aug 2018, 11:19
|
This announcement is to notify you that the intervention planned to configure the interlocks as read-only will be carried out at 11:30.
A following message will notify of the end of the intervention
Alessandro |
Re: SASE3 loops will restarted at 11:30, posted by Alessandro Silenzi on 28 Aug 2018, 11:36
|
Alessandro
Silenzi wrote:
This announcement is to notify you that the intervention planned |
Instrument Component Priority List update after SASE1 Readiness Meeting, posted by Tobias Haas on 10 Mar 2017, 11:18
|
|
Fertigmeldung phase II cables SPB Optics Hutch D.02 and SPB laser hutch D.13, posted by Adriano Violante on 28 Apr 2017, 08:25
|
ACTEMIUM has delivered the handover document for the phase II cables installed in D,02 and D.13. The beckhoff crates can be connected to the cables
in these areas of SASE1.
|
Status after 9.30 Meeting, posted by Adriano Violante on 26 Jul 2017, 10:35
|
General
Today the machine is being prepared to lase with 30 bunches in order to allow the radiation measurements in SASE1 Exp. Hall on Thursday
and Friday.
Today GUI will be down for a couple of minutes at 11.30 to allow modifications of the servers for bugs fixing.
Specific |
SPB - Loop 5 is back online, posted by Bernard Baranasic on 26 Jul 2017, 14:10
|
SPB Loop 5 is back online:
- but without crate BKF00095-SPB_IRU_CHL (there is missmatch of hardware and documentation (investigation is ongoin)),
- pumps: PUMP_TURBO4, PUMP_TURBO5, PUMP_TURBO8, PUMP_ROOT_1, PUMP_ROOT_2 ,PUMP_ROOT_3 and IRU_VAC/PUMP_ROOT_1 are without serial connection |
Restricted areas Durring Radiation Measurements of SASE 1, Friday 28.07, posted by Eric Boyd on 27 Jul 2017, 15:42
|
No radiation measurements have taken place today (27.07) due to insufficent energy of the machine. We think we can achive the desired energy by tomorrow
morning at which time the SRP group will attemtp to commission both the SPB OPT and SPB EXP hutch. The attached presentation shows the new expected time
schedule. |
No Restricted Areas for Radiation Commissioning, posted by Eric Boyd on 28 Jul 2017, 11:10
|
Desired parameters where reached for radiation measurments of the SPB OPT and SPB EXP hutches. Radiaiton could not be detected inside the hutch with
the beam shutters open and beam verified hitting the target, therefore it was not deemed necessary to take radiation measurments outside the hutches. As
a result there are no additional access restrictions in SASE 1. |
No Radiation Measurements in SASE 1 This week, posted by Eric Boyd on 03 Aug 2017, 10:52
|
Do to repairs that need to be made with the cold compressor. We will be unable to perform Radiation Hutch Commissioning for SASE 1 this week. We will
attempt to reschedule the Measurments for Thursday or Friday (10.08 or 11.08) of next week, depending on if it can be coordinated with all involved parties.
There is no restricted access to SASE 1 until then. |