Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 21 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Vacuum Loop, posted by NEREA JARDON on 26 Apr 2017, 09:10 
Entry   Motion loop, posted by NEREA JARDON on 25 Apr 2017, 14:20 
Entry   XTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - Not Working (yet), posted by Raśl Villanueva-Guerrero on 25 Apr 2017, 13:49 
Entry   Motion loop, posted by NEREA JARDON on 25 Apr 2017, 10:51 
Entry   Status and Plans after the 9:30 meeting, posted by Adriano Violante on 25 Apr 2017, 10:49 
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 24 Apr 2017, 11:08 
Entry   CAS OCD April 22-23, posted by Sandor Brockhauser on 21 Apr 2017, 17:22 
Entry   SASE EPS RACK 1.14 connected, posted by Tobias Freyermuth on 21 Apr 2017, 15:30 
Entry   Cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9, posted by Jan Grünert on 21 Apr 2017, 15:26 
Entry   OCD, posted by NEREA JARDON on 21 Apr 2017, 15:22 
Entry   SASE EPS RACK 1.14 disconnect, posted by Tobias Freyermuth on 21 Apr 2017, 14:36 
Entry   Access to control PC, posted by Jan Tolkiehn on 21 Apr 2017, 13:54 
Entry   FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL, posted by Raśl Villanueva-Guerrero on 21 Apr 2017, 12:28 
    Reply   FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL, posted by Raśl Villanueva-Guerrero on 21 Apr 2017, 13:23 
       Reply   FAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL, posted by Raśl Villanueva-Guerrero on 21 Apr 2017, 13:35 
Entry   XGM status, posted by Jan Grünert on 21 Apr 2017, 09:59 
Entry   Maintenance/Access in KW17, posted by Tobias Haas on 20 Apr 2017, 17:18 
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 20 Apr 2017, 10:25 
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 19 Apr 2017, 11:49 
Entry   Motion loop, posted by NEREA JARDON on 19 Apr 2017, 11:47 
Entry   Trigger and IP address, posted by Andreas Koch on 18 Apr 2017, 16:36 
Entry   KW16 Accelerator Plans, posted by Tobias Haas on 18 Apr 2017, 13:21 
ELOG V3.1.4-7c3fd00