Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and Plans after 09:30 meeting |
|
|
Tunnels XTD2 and XTD4 are closed, XTD9/10 remain open
Vacuum:
- Running stably
- Work continues on M3 in XTD9 and on the vacuum in XTD10
EPS Loop:
- Input from undulator still missing. This requires fixing a cable in balcony rooms and then testing
PBLM/Motion Loop:
- Work on the PBLM motors (ELMO controller) continues.
- It appears that the uneven movement is due to improper setting of motor parameters
Imagers
- Trigger problem reported yesterday was due to a cabling issue. Apparently during work on the relevant rack cables were unplugged and then wrongly put back
- Network issue with pop-in (245) in XTD9 solved
SPB Tunnel components
- Crate with "problem on signal pins" was brought to the lab and checked. Everything was ok. Problem was due to spurious measurement.
Karabo:
- PSLIT was tested successfully yesterday
- Behaviour of Karabo when a loop goes down needs to be made more graceful.
- Cleanup continues
Tasks for today:
Note: All loops should be left running and no changes to Karabo.
- Prepare mirror M3 installation
- Continue testing of PBLMs in XTD9
- Continue testing of SPB tunnel loop
Other topics
|