Together with Nerea and Wajid and Alessandro
- 10:00 closed vatterflies at XTD9 and XTD2 from Karabo
- Florian is at XTD9 next to the XGM
XTD9:
- LOOP re-cycle
- All valve closed and scroll off (turbos in unknown state; Florian in tunnel sees 990 Hz)
- Scroll and turbos switched ON
- Angle valve opened over Karabo
- Problem to open gate-valve
- Set Karabo offline
- Nerea switched turbos at XTD2 ON (XTD9 were on) by PLC
- Karabo is reconnected to PLC (brought online again)
XTD2: (with Alessandro)
- Scene optimized: Turbo speed, new prevac display, and preliminary scroll icon
- Open KF angle and gate valve (follow "XGM vacuum incident procedure")
XTD9: (with Alssandro)
- Scene optimized: Turbo speed, new prevac display, and scroll icon
- Open angle and gate valve (follow "XGM vacuum incident procedure")
New project created "SASE1-XGM" which contains both XTD2 and XTD9 XGM vacuum projects, thus scenes from both can be opened from one GUI simultaneously.
11:55 XTD9 vatterflies OPEN
12:00 XTD2 vatterflies OPEN
(V10120V could only be opened after shutdown of device and re initialization)
Maybe upper pressure probes need new calibration -> Check formula
Prevacuum pressures:
- XTD9: 6.4E-4 mbar (G11081P)
- XTD2: 2.5E-2 mbar (G10100P) and 1.2E-3 mbar (G10101P)
Summary : both XGMs in XTD2 and XTD9 are now back in normal pumping operation, and they were never exposed to more than a few 10E-6mbar. Good. But it took 2 hours and 4 experts. |