Group Selection Page
HELP
Controls Group
ITDM
Vacuum
WP78
SPB
SQS
XO
ToBeMigrated2XWiki
ToBeMigrated2GitlabPages
ToBeMigratedByGroup
Migrated2Zulip
Archived2PDF
not2MigrateOrArchive
|
|
SCS
SXP Migrated2Zulip
Photon Commissioning Team
XRO
DOC
HED Migrated2Zulip
WP74
MID
PSPO_XO
XO_Operation
SQS Migrated2Zulip
FXE Migrated2Zulip
DET
Sample Environment
SPB Migrated2Zulip
|
|
SASE1 Status and SASE3 Readiness
Technical integration and coordination
|
| Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
|
Message ID: 153
Entry time: 20 Apr 2017, 10:25
|
| Author: |
Tobias Haas |
| Location: |
General |
| Severity: |
Information |
| Subject: |
Status and Plans after 09:30 meeting |
|
|
Tunnels XTD2 and XTD4 are closed, XTD9/10 remain open
Vacuum:
- PLC/Karabo Running stably
- Local tests of ion pumps in XTD9 being done by J. Eidam
- Work continues on M3 in XTD9 and on the vacuum in XTD10
- DPS in XTD9 should be integrated into the vacuum loop. This requires a cycling of the loop. Timing should be coordinated with WP74 because of XGM in XTD2. Unfortunately nobody from WP74 attended the meeting. Hence it was decided to perform the work tomorrow morning.
EPS Loop:
- Checks for the signal from the undulators and for the fast valve will be done with DESY MPS today
PBLM/Motion Loop:
- Work on the PBLM motors (ELMO controller) continues.
- Yesterday it was possible to align the screens
- There is a resource problem when trying to read out the cameras. For this reason an additional server needs to be set up dedicated to acquiring the images from the cameras.
SPB Tunnel components
- Crate that was checked in the lab yesterday was moved back into the tunnel
- The unstable support of the imager was fixed
- B. Weinhausen and M. Messerschmidt are testing
- All modules necessary for loops 1 & 2 were received from Poland
- Waiting for the "Freigabe" of the cables for SPB Optics
FXE
- Loops 1,2 and 4 are waiting for input from EETF
- Loops 3&5 are running
- No visible testing activity from FXE team
Karabo:
Tasks for today:
Note: All loops should be left running and no changes to Karabo.
- Prepare mirror M3 installation
- Continue testing of PBLMs in XTD9
- Continue local tests of ion pumps in XTD9
- Continue testing of SPB tunnel loop
Tasks for tomorrow:
- Cycle vacuum loop for inclusion of DPS in XTD9
Other topics
- Weekly SASE1 Readiness meeting tomorrow at 09:00 in XHQ 1.173
- L. Samoylova requests access to XTD2 to install another webcam
- Magnet current tests will likely continue through Wednesday in XTD2. Maintenance day to be shifted accordingly probably to Thursday/Friday. More information later
|