Entry   Status after the 9.30 Meeting, posted by Adriano Violante on 08 May 2017, 15:18 
 Vacuum (M. Dommach):

    Systematic tests of ion pumps in XTD9 almost
finished - ongoing
    Interface with MPS has to be tested
    Problem with the fast valve in XTD2 and 9 - it is possible to close
Entry   WP74 OCD contacts for this weekend, posted by Jan Grünert on 06 May 2017, 14:50 
WP74   OCD  for the  weekend 6.5.-7.5.2017:
Saturday: Jan, jan.gruenert@xfel.eu, 9-5777
Sunday: Theo, theophilos.maltezopoulos@xfel.eu, 9-6792
Entry   AE OCD Mai 5 -- Mai 8, posted by Nicola Coppola on 05 May 2017, 14:35 
AE on call service:
    Contact person:
        Nicola Coppola
Entry   VAC loop up and running again, posted by Tobias Freyermuth on 05 May 2017, 09:44 
The vacuum loop is up and running again, with the version 1.11.4.
Denis Finze will connect the shutter signals of the XS3 shutter to the vacuum loop in rack 1.7.
 
Entry   Slow loading in karabo GUI, posted by Jan Grünert on 04 May 2017, 19:40 
The current slow response times in the karabo GUI are the following (some measured times for reference):

- opening a project from the project manager : 45sec (just loading, not yet touching any device or scene)
Entry   CAS support during the afternoon: 9-6776, posted by Sandor Brockhauser on 04 May 2017, 12:14 
Dear All,
 
During the afternoon CAS has a group activity. Any support can be requested via my phone number: 9-6776.
Entry   Info from H. Sinn, posted by Tobias Haas on 04 May 2017, 11:36 
 Hallo allerseits
Entry   Gas Section Interlock on XTD9 - Shut off valve also operative, posted by Raúl Villanueva-Guerrero on 03 May 2017, 14:38 45.png
 Dear all,
during the test run today by our colleagues of WP74, the interlock condition inside the XGM module was met (small volume pressure burst up to 10-2
mbar range). Now we can see also the expected cut-off event of the gas injection (see attached pictured). It seems that the reason why there was any feedback
Entry   Accelerator Schedule for the next days, posted by Tobias Haas on 03 May 2017, 13:38 
 Author: Decking
Entry   *IMPORTANT* Change of plans re Access tomorrow, posted by Tobias Haas on 03 May 2017, 13:29 

Due the recent results from XFEL, the urgent maintenance is shiftet from Thursday 4th to Friday  5th. On Thursday,
there will be operation till 14:00, after 14:00 the machine will be  switched to standby. All the work planned will
shift accordingly by one day. No ZZ before  Thursday 14:00.  
Entry   GUI Server redeployment, posted by Alessandro Silenzi on 03 May 2017, 12:32 
The GUI server has been redeployed and a second one has been added.
In order to access those:
please log out of the gateway and log in again using the usual command
Entry   Correction to plans for Vacuum (e-log message n3. 199) in XTD9, posted by Raúl Villanueva-Guerrero on 03 May 2017, 11:15 
 Dear all,
it seems that this morning was somehow a misunderstanding. The XTD9 Gas Section Interlock test was succesfully finished the last 26th of April
(see e-log message nr. 179).
Entry   Status after 0930 meeting, posted by Tobias Haas on 03 May 2017, 11:04 
Tunnel Status: XTD2/4/10 closed. XTD9 open. Controlled
Access to 2/4/10 possible upon request
 
Entry   XTD9 vacuum now ok, but not in XTD2: turbos on XGM@XTD2 still in ERROR, posted by Jan Grünert on 02 May 2017, 22:27 
Wajid and Leonce from CAS have managed to get us the karabo controls back.
We have now put the XGM@XTD9 back into normal vacuum operation, and opened finally the vatterfly valves, this one is ok, and we checked also the
entire XTD9 gas section to be ok.
Entry   XGM scenes/devices offline - UHV pressures increasing - Please respond now !!, posted by Jan Grünert on 02 May 2017, 20:11 
All devices went into unknown state in the karabo XGM scenes in XTD2 and XTD9 at 19h52.
Pressures INCREASE since then (as measured/shown in DOOCS): 
XTD2:  2,5E-7mbar and rising
Entry   Access to XTDs on Thursday, posted by Adriano Violante on 02 May 2017, 15:30 
 This Thursday the XTDs will be accessible with ZZ procedure. Access can be requested via T. Haas. 
Entry   Status of Vacuum System , posted by Harald Sinn on 02 May 2017, 10:56 
XTD2: All gate valves are now OK (not interlocked) after re-instantiating and re-setting the XGM_DP_OK. 
The interlock errors of some valves in XTD9 are shown in the screen shots below (Janni and Valerii starting now in XTD9 to debug some more controllers)
 
Entry   PBLM Motor drivers in PreOP, posted by Tobias Freyermuth on 02 May 2017, 10:05 
Hi all,
 
due to ongoing tests with the PBLM motor drivers I have to set the Elmo drivers in PreOp mode. 
Entry   ERRATA: CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid , posted by Hugo Silva Santos on 29 Apr 2017, 10:04 
 Dear All,
Still in time, I would like to correct out schedule.
The scheduled previous agreed for this weekend/holiday was from 10:00 to 17:00. Therefore,
Entry   Vacuum group call service, posted by Janni Eidam on 28 Apr 2017, 16:29 
Not really official, but in emergency case you can call 96993 for vacuum group. Next week Martin is back and I think we will have official on call service.

Have a nice weekend with hopefully no problems :-)