Entry   OCD AE Group, posted by NEREA JARDON on 15 May 2017, 11:32 
Dear all,

The OCD AE numbers for the following days will be:
Entry   Status and plans after 09:00 meeting in BKR, posted by Tobias Haas on 15 May 2017, 11:02 
 Issues observed by PCT over the weekend (from H. Sinn entry in the PCT log)
- The interlock of the vacuum valves worked as expected. However, we had two times the gas section
around the XGM tripping the beam, because the gate valves around the XGM were closing. The reason for these trips will be investigated (probably noise
Entry   CAS OCD from today to Monday, posted by Valerii Bondar on 12 May 2017, 15:58 
Dear all,
CAS phone numbers for OCD:
Friday: Alessandro (98054),
Entry   OCD AE Group, posted by NEREA JARDON on 12 May 2017, 15:37 
Dear all,
The OCD numbers for this weekend and today will be:
PLC Support: 9-8040 / 0151-68822383
Entry   V0 open!, posted by Harald Sinn on 12 May 2017, 13:59 IMG_4609.jpg
V0 is open now!
Janni opened this morning at 11:00 the V0 valve towards the accelerator vacuum.
We removed the B4C absorber in front of the valve and now the spontaneous radiation can enter the Schenefeld vacuum. 
Entry   Status and plans after SASE1 Readiness Meeting, posted by Tobias Haas on 12 May 2017, 13:33 AttendanceS1R120517.pdf
Focus of meeting is on SASE1 Instruments, Laser and Detectors
SPB (B. Weinhausen)

    All motors in the SPB tunnel loop have been commissioned except for one TECHNOSOFT motor where the updated driver was not yet available
Entry   New Deployment of Karabo for the SASE1 control machines., posted by Alessandro Silenzi on 11 May 2017, 12:43 download.sh
I will ramp down the system and bring it back up during the lunch break after installing the 
tag 2.1.10.
To install a new version of Karabo use the script attached on your terminal
    Reply   New Deployment of Karabo for the SASE1 control machines., posted by Alessandro Silenzi on 11 May 2017, 15:08 


    
        
            Alessandro Silenzi wrote:
        
        
            
            I will ramp down the system and bring it back up during the lunch break after installing the 
       Reply   New Deployment of Karabo for the SASE1 control machines., posted by Alessandro Silenzi on 12 May 2017, 13:19 


    
        
            Alessandro Silenzi wrote:
        
        
            
            
            
Entry   Update of Instrument component priority list , posted by Monica Aresté on 12 May 2017, 12:26 170512_Instrument_Components-Priority-list.xlsx
Find attached the Instrument Component priority list discussed this morning.
Regards,
Monica
Entry   Motion loop, posted by NEREA JARDON on 12 May 2017, 09:23 
Dear all,
Due to local test needed in Rack 1.18 for the Motion loop, the loop will be interrupted only in Rack 1.18 XTD9 from now till the people in the
Tunnel finish the tests. It will not affect any other part of the Motion loop.
Entry   Restart vacuum loop now, posted by Harald Sinn on 12 May 2017, 08:21 
 We are in the BRK and corrected the vacuum interlock condition.
We will restart the SA1 vacuum loop in a few minutes
 
Entry   WP74 OCD contacts, posted by Jan Grünert on 11 May 2017, 19:12 WP74-OCD-5-2017.xlsx
Plan of WP74 OCD contacts for May.
Assignments are subject to change.
Initially availability is 10h-18h on the given days.
Entry   XTD10 not open on Monday, posted by Harald Sinn on 11 May 2017, 18:26 
 Dear all, 
contrary to the rumor that I spread last Tuesday in the PBS meeting, the magnet tests in XTD2/4 will be NOT done coming Monday and therefore the
XTD10 will be be NOT open. It is still the plan to have one access day in XTD10 per week in the future (Monday or Wednesday to be clarified with the magnet
Entry   Motion loop, posted by NEREA JARDON on 11 May 2017, 16:41 
Dear all,
I will update the Motion loop to include the mc2 motors, it will be running again in few minutes.
Thank you!
Entry   CAS OCD, posted by Gero Flucke on 10 May 2017, 18:52 
CAS on call service for the night:
Gero Flucke: 9-8053
 
Entry   karabo Beckhoff link not reestablished for SASE1 tunnel VAC loop, posted by Jan Grünert on 10 May 2017, 13:03 
Could somebody please re-establish the karabo controls of the SASE1 tunnel VAC loop (connection with Beckhoff server) ?
The karabo devices for XGM vacuum XTD2 and XTD9 are still all in UNKNOWN STATE.
We urgently would like to check the XGM vacuum status and restart the pumps before they are vented.
    Reply   karabo Beckhoff link not reestablished for SASE1 tunnel VAC loop, posted by Jan Grünert on 10 May 2017, 13:07 


    
        
            Jan Grünert wrote:
        
        
            
            Could somebody please re-establish the karabo controls of the SASE1 tunnel VAC loop (connection with
Entry   Vacuum Loop, posted by NEREA JARDON on 10 May 2017, 12:34 
Vacuum is up and running again.
Thank you
Entry   Vacuum Loop, posted by NEREA JARDON on 10 May 2017, 11:06 
Sorry for disturbing you, but I will have to wait till WP74 group finish a training in order to be able to put the XGM up again .
Entry   Vacuum loop, posted by NEREA JARDON on 10 May 2017, 10:59 
Dear all,
The update of the Vacuum loop will take place in the next few minutes, later on, you would have access again to it.
Thank you.
Entry   EPS loop, posted by NEREA JARDON on 09 May 2017, 17:04 
EPS loop in SASE1 is running again
Entry   EPS loop, posted by NEREA JARDON on 09 May 2017, 16:43 
Dear all,
I will make an update on the EPS loop, it will take only a moment.
Thank you