Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 10 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Locationdown Severity Subject Text Attachments
  93   03 Apr 2017, 10:03 Tobias HaasGeneralInformationSchedule for PLC and Karabo 3 April after 09:30 MeetingTunnels closed today and tomorrow
- AE updates Vacuum and motion loop
in the morning
  
  94   04 Apr 2017, 11:21 Tobias HaasGeneralInformationSchedule after 09:30 Meeting Tunnel
closed today. Might re-open around 14:00
Note that that we re-convene briefly
  
  95   04 Apr 2017, 12:28 Alessandro SilenziGeneralInformationTemperatures from EPS loopThis is the list of data coming directly
from the PLC via its TCP client connected
to the EPS PLC.
  
  96   04 Apr 2017, 12:43 Alessandro SilenziGeneralInformationTemperatures from EPS loop


   
        
            
  
  97   04 Apr 2017, 15:11 Tobias HaasGeneralInformationAccess to XTD2MPS informed me that they hit some problems
and that they still need 30 mins to 1 h until
we can go to XTD.  
  
  98   04 Apr 2017, 16:29 Tobias HaasGeneralInformationAccess to XTD2 and XTD9 is now possible Interlocks in the northern fan are broken!    
  99   04 Apr 2017, 16:31 Tobias HaasGeneralInformationMeeting at 17:00 should take place at 17:45since tunnel access is now possible    
  100   04 Apr 2017, 18:16 Tobias HaasGeneralInformationProgress on Vacuum LoopJ. Eidam, V. Bondor, T. Freyermuth checked
Ion pump controller settings in XTD2 and
XTD9.
  
  101   04 Apr 2017, 18:49 Alessandro SilenziGeneralInformationUPDATE on Temperature sensors for EPS loopHere are the updated values for the temperature
sensors inn the EPS loop.
Now Thermocouples work!
  
  102   04 Apr 2017, 19:25 NEREA JARDONGeneralInformationVacuum LoopDear all,
Tomorrow at first hour, some hardware
modules would added in Rack 1.1 and 1.9 in
  
  103   05 Apr 2017, 10:15 Tobias HaasGeneralInformationSchedule after 0930 MeetingTunnel
Open.
  
  105   05 Apr 2017, 14:27 NEREA JARDONGeneralInformationVacuum LoopDear all, 
The XGM XTD2 is already into the
Vacuum loop and the loop is running. We would
  
  107   05 Apr 2017, 16:40 Tobias HaasGeneralInformationDESY wants to close XTD2 & XTD4 over the weekend...I expect that some of us may need the weekend
as a reserve (e. g. mirror installation).
So we should probably say no. Let's discuss
  
  109   06 Apr 2017, 11:27 Tobias HaasGeneralInformationStatus and Schedule after 09:30 meeting Tunnel
Open.
  
  113   07 Apr 2017, 10:31 NEREA JARDONGeneralInformationMotion loopI have made an update for the Motion loop
requested to test correctly the Attenuators.
Now the loop is running again.
  
  114   07 Apr 2017, 11:12 NEREA JARDONGeneralInformationEPS loopDear all, I will update EPS loop in order
to integrate new hardware changes. I will
post a new entry when the work is done.
  
  115   07 Apr 2017, 11:57 NEREA JARDONGeneralInformationEPS loopDear all, EPS loop is again up and running.
Thank you!
  
  116   07 Apr 2017, 16:02 Alessandro SilenziGeneralInformationTest on Karabo trunk show promising resultsI have deployed the Karabo master (the
HEAD of our development) in the control network
for the Vacuum loop device server.
 02.png12.png 
  117   07 Apr 2017, 16:41 Tobias FreyermuthGeneralInformationHotfix for all loops (VAC, MOV, EPS)






Normal
0
  
  118   07 Apr 2017, 17:43 Tobias FreyermuthGeneralFeedbackHotfix for all loops (VAC, MOV, EPS) deployed






Normal
0
  
ELOG V3.1.4-7c3fd00