Subject: Progress on Vacuum Loop 

J. Eidam, V. Bondor, T. Freyermuth checked Ion pump controller settings in XTD2 and XTD9.

Many controllers were found to have incorrect settings. All pumps in XTD2 now respond and give pressure readings. There remains the problem that the PLC is looking for the wrong channel in the case where 2 pumps are connected to one controller (Is 1 & 3 and PLC looks for 1 & 2). J. Eidam now checks channel numbers on all controller. T. Freyermuth then regenerates the firmware. A. Silenzi set up pressure recording for pumps P10050I, P10060I and P10200I to run overnight. 