SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 103
Entry time: 05 Apr 2017, 10:15
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Schedule after 0930 Meeting |
|
|
Tunnel Open.
Vacuum Loop:
Status:
- Communication problem with Ion pump controllers is fixed after adjusting controller settings
- Loop is now down to allow inclusion of XGM
EPS Loop:
Status:
- Temperature sensors return reasonable values after EPS loop fix
- EPS to MPS interface is working but fiber to central desy interface still lacking
Motion Loop:
Status:
- Should be up for testing PBLMs and Imagers
Imagers
Status:
- Test of FEL imager ok, but hampered by occasional slow response of the system
- SR Imager needs work on the driver
Tasks for today:
- Include XGM in Vacuum loop (N. Jardon, M. Planas, T. Matsopoulos, V. Bondar)
- Test updated MC2 lib with PBLM in the tunnels (N. Gerasimova, M. Jidda)
- Work on camera driver for SR imager (A. Koch and W. Ehsan)
- Test motion system of the imagers in the tunnels (A. Koch and W. Ehsan)
- Monitor stability and responsiveness of GUI Server and Log Servers
- Set up monitoring of temperatures and pressures overnight
- Push DESY to get fiber connection to MPS (P. Gessler)
Tasks for tomorrow:
- Terminals need to be added and firmware adjustments made in motion loop (take loop down as early as possible for one hour)
- Test EPS inputs to MPS system with DESY people
- Power down crate 1.15 for grounding. Could take longer than one day
Other topics
- N. Jardon needs complete info of motor names in rack 1.18
|