ID |
Date |
Author |
Group |
Subject |
Text |
 |
123
|
09 Jun 2024, 22:45 |
Chan Kim | SPB | Shift summary | X-ray delivery
7.0 keV, up to 202 pulses
at 564 kHz, 1.0 mJ.
Optical |
|
124
|
11 Jun 2024, 00:43 |
Abhisakh Sarma | SPB | Shift summary | **X-ray delivery**
7.0 keV, up to 202 pulses
at 564 kHz, 1.0 mJ.
**Optical |
|
125
|
13 Jun 2024, 01:46 |
Jörg Hallmann | MID | Shift summary | alignment of the instrument including collimation
and beam shaping
test of the tempus detector using |
|
126
|
14 Jun 2024, 01:53 |
Jörg Hallmann | MID | Shift summary | continue with Tempus tests
continue with PAM commissioning (first
results of the working device at MID) |
|
130
|
23 Jul 2024, 17:17 |
Idoia | XRO | Shift summary |
ZZ
access at XTD10
The
LE PM X and HE PM X motors were checked and |
|
133
|
24 Jul 2024, 15:22 |
Giuseppe Mercurio | SCS | Shift summary |
Shift
summary (Natalia, Giuseppe)
Achievements:
M1, M2 pitches adjusted
Grating |
|
135
|
27 Jul 2024, 23:42 |
Romain Letrun | SPB | Shift summary | X-ray delivery
- 9.22 and 11.0 keV, 1-352 pulses
@ 1.1 MHz, 600-1400 uJ. |
|
136
|
28 Jul 2024, 23:34 |
Romain Letrun | SPB | Shift summary | X-ray
delivery
11.0 keV, 1-352 pulses |
|
137
|
29 Jul 2024, 06:45 |
Giuseppe Mercurio | SCS | Shift summary | ## Shift summary night July 28th-29th
Achievements:
- we saw signal on both MCPs (with |
|
138
|
29 Jul 2024, 23:22 |
Romain Letrun | SPB | Shift summary | X-ray
delivery
11.0 keV, 1-351 pulses |
|
139
|
08 Aug 2024, 00:18 |
Jörg Hallmann | MID | Shift summary | optimization of seeding (still not as good
as needed)
set position for the two color |
|
140
|
09 Aug 2024, 01:59 |
Jörg Hallmann | MID | Shift summary | optimized the SDL alignment
found timing of the upper (-520
ps) and lower branch (-514.5 ps) of the SDL |
|
141
|
10 Aug 2024, 01:17 |
Jörg Hallmann | MID | Shift summary | Found the delay time from upper and lower
branches of SDL with a frosted-YAG.
The upper branch is -512.8 and the |
|
144
|
11 Aug 2024, 02:15 |
Wonhyuk Jo | MID | Shift summary | Found the spatial overlap on the Suna microscope
with Zyla.
Found the SDL motor position giving |
|
145
|
11 Aug 2024, 14:33 |
Romain Letrun | SPB | Shift summary | Summary 06.08
- 10.08
X-ray |
|
146
|
11 Aug 2024, 23:07 |
Raphael de Wijn | SPB | Shift summary | X-ray delivery
11.56 keV 202 pulses @0.5 MHz,
~1.0 mJ |
|
147
|
12 Aug 2024, 02:07 |
Wonhyuk Jo | MID | Shift summary | Found spatial overlap at Suna microscope
with Zyla cam.
The splitting ratio was obtained about |
|
148
|
12 Aug 2024, 23:47 |
Raphael de Wijn | SPB | Shift summary |
X-ray
delivery
11.56 keV, 202 pulses @0.5 MHz, |
|
149
|
13 Aug 2024, 02:04 |
Wonhyuk Jo | MID | Shift summary | Found the interference fringe at Suna microscope
with Zyla cam from MID split-and-delay line.
The fringe patterns were recorded |
|
150
|
21 Aug 2024, 23:34 |
Raphael de Wijn | SPB | Shift summary | X-ray delivery
12.40 - 12.82 keV, ~1.1 mJ
Optical laser delivery |
|
|