ID |
Date |
Author |
Group |
Subject |
66
|
29 Mar 2024, 22:38 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse, stable delivery
Optical laser delivery
- 487 nm ns laser for pump-probe
- 800 nm PP laser for jet illumination, stable delivery
Achievements/Observations
- AGIPD BG optimized (DiffPump realigned)
- IRDA focus optimized (EHC_CRL arm10 (1mm pinhole) inserted)
- Completed dark state measurement of the main sample (more than 4 hours of measurement time)
- Collected PP (pump-probe) dataset with 5 us time delay (about 3 hours of measurement time; Jet was quite stable during the 3 hrs measurement)
Issues
- AGIPD module Q3M2 was not healthy. After another power cycle, it recovered.
- X-ray pulse energy was relatively low in the beginning of the shift. It was partially recovered after running the launch optimization by BKR. |
69
|
30 Mar 2024, 22:02 |
Chan Kim | SPB | Issue |
Continuous pointing drift in horizontal direction.
It may trigger a vacuum spike at SPB OH (MKB_PSLIT section) at 21:07 pm.
|
Attachment 1: Screenshot_from_2024-03-30_21-59-03.png
|
|
Attachment 2: Screenshot_from_2024-03-30_21-09-11.png
|
|
70
|
30 Mar 2024, 22:50 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 12.72 keV, 10Hz, ~1.4 mJ/pulse, continuous beam drift in the horizontal direction observed
Optical laser delivery
- 487 nm ns laser for pump-probe
- 800 nm PP laser for jet illumination, stable delivery
Achievements/Observations
- Collected PP (pump-probe) dataset with 5 us time delay more than 12 hours
- Collected 3 runs (5 minutes run) of dark state in the end of the shift
- Jet was quite stable most of the time
Issues
- Continuous beam pointing drift in the horizontal direction observed
- Vacuum spike at MKB_PSLIT section trip the beam shortly which might be related to the beam pointing drift |
119
|
07 Jun 2024, 23:12 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 7.0 keV, up to 202 pulses at 564 kHz, 1.0 mJ.
- Average pulse energy was about 1.9 mJ on Tuesday and Wednesday. It has to be discussed with BKR tomorrow morning.
Optical laser delivery
- ns laser for jet illumination
Achievements/Observations
- BG measurement with water, buffer low salt
- Lysozyme measurement for geometry file
- Data collection for six different sample concentrations [2 x 15 minutes runs]
Issues
- Pulse energy is very low as compared with Tuesday and Wednesday in this week.
- Damage found on IRU_SLIT4 Top and Bottom blades.
- NKB focus moved by ~20um at around 15:00 (during the handover period). SideMic X moved +20um to compensate it. |
123
|
09 Jun 2024, 22:45 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 7.0 keV, up to 202 pulses at 564 kHz, 1.0 mJ.
Optical laser delivery
- ns laser for jet illumination
Achievements/Observations
- Data collection for user sample through column
Issues
- Pressure spike while rotating nozzle tripped AGIPD
- Temperature of ASICs of Q2M1 module too low and not easy to turn it on (issue solved after changing the bath temperature to -27 degreeC)
- Julabo chiller issue again (In the end, set temperature changed to -29.5 degreeC and continued the experiment)
- Another 2 ASICs in Q2M2 and Q2M3 seem unhappy
|
153
|
24 Aug 2024, 23:09 |
Chan Kim | SPB | Shift summary |
X-ray delivery
-12.40 - 12.82 keV, XDT9 XGM ~0.81 mJ@ end of shift
Optical laser delivery
-800 nm laser for jet visualization
-487 nm ns laser for pumping
Achievements/Observations
-Focus IRD
-Collected 10 ns SFX data
Issues
-AGIPD chiller was down |
156
|
27 Aug 2024, 12:17 |
Chan Kim | SPB | Shift summary |
X-ray delivery
Optical laser delivery
- 800 nm laser for jet visualization
Achievements/Observations
- Collected SFX data
- Calibration date for HIREX measured (at different X-ray energy)
|
175
|
25 Sep 2024, 16:53 |
Chan Kim | SPB | Issue |
600um thick CVD diamond (XTD2 attenuator) seems damaged
Attachment 1: 600um thick CVD diamond (Arm 4) OUT
Attachment 2: 600um thick CVD diamond (Arm 4) IN |
Attachment 1: Screenshot_from_2024-09-25_16-50-57.png
|
|
Attachment 2: Screenshot_from_2024-09-25_16-51-21.png
|
|
176
|
25 Sep 2024, 23:36 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~2.8 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- NKB focus optimized
- particle injection tested with gold nanoparticles
- ns laser roughly aligned with particle beam
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- XTD2_ATT Arm4 (600um thick CVD) is damaged (most probably last week)
|
178
|
26 Sep 2024, 23:12 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~2.7 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- NKB focus optimized
- ns laser aligned with particle beam
- particle injector position optimized
- measured 3 samples: roughly 2 hours per each sample
- one sample was measured with and without He gas
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- Beam drift in vertical direction: Rz has to be corrected during the measurement and moved by 0.2 mm in total in whole day (~18 hours)
|
181
|
27 Sep 2024, 23:13 |
Chan Kim | SPB | Shift summary |
X-ray delivery
- 6 keV, ~3.0 mJ, stable delivery
Optical laser delivery
- ns laser for particle visualization
Achievements/Observations
- measured 1 sample roughly for 9 hours (hit rate went down in the afternoon)
- Julabo chiller (AGIPD) is still on target (-32 degree)
Issues
- NKB mirror drifted in vertical direction: it was optimized again at around 9pm
- extremely low hit rate even with sucrose (extremely few particles were observed in sidemic, 1 particle within a few seconds): maybe the aerodynamic lens should be cleaned
|
184
|
29 Sep 2024, 00:07 |
Chan Kim | SPB | Shift summary |
**X-ray delivery**
- 6 keV, ~2.8 mJ, stable delivery
**Optical laser delivery**
- ns laser for particle visualization
**Achievements/Observations**
- measured user sample for almost whole day (about 100 runs x 5 minutes)
- Julabo chiller (AGIPD) is still on target (-32 degree)
**Issues**
- MKB Ion pump error (issue fixed after resetting the device)
- NKB focus loosed. Focus reoptimized twice during the d2 shift |
187
|
29 Sep 2024, 22:29 |
Chan Kim | SPB | Stability Issue |
X-ray beam is continuously drifting in the vertical direction (XTD9_XGM)
It affects our NKB focus and focused beam is also drifting continuously. |
Attachment 1: Screenshot_from_2024-09-29_22-24-09_1.png
|
|
Attachment 2: Screenshot_from_2024-09-29_22-24-00.png
|
|
188
|
30 Sep 2024, 01:13 |
Chan Kim | SPB | Shift summary |
**X-ray delivery**
- 6 keV, ~2.8 mJ, continuous beam drift in vertical direction (both XTD2 & XTD9 XGMs)
**Optical laser delivery**
- ns laser for particle visualization
**Achievements/Observations**
- measured sample for almost whole day (about 100 runs x 5 minutes)
- Julabo chiller (AGIPD) is still on target (-32 degree)
**Issues**
- Continuous beam drift in the vertical direction: NKB focus was optimized almost every 2 hours
- Sudden intensity drop in SA1 when SA2 or SA3 changes the number of pulses. |
193
|
24 Oct 2024, 06:51 |
Chan Kim | SPB | Shift summary |
X-ray delivery
12.4 keV, ~1.4 mJ
Achievements/Observations
- Beam is through the inline mic
- Flight tube vacuum optimized
- Beam trajectory up to JF4M manually optimized
- EHC CRLs aligned
|
194
|
25 Oct 2024, 05:51 |
Chan Kim | SPB | Shift summary |
X-ray delivery
12.4 keV, ~1.4 mJ
Achievements/Observations
Beam was focused on a YaG, alignment finished up to JF4M |
68
|
30 Mar 2024, 00:17 |
Björn Senfftleben | | (Resolved) Issues with DAQ |
We had some trouble with the DAQ. It was not able to start runs properly.
We got the following error messages:
initially:
[00:01:27]: Problem of communication with data manager
[00:01:30]: Start new run ...
[00:01:38]: Failed starting data recording
DM: error at registerRun (Request to MDC timeouted)
after trying to start the run again:
[00:05:35]: Start new run ...
[00:05:35]: Failed starting data recording
DM: error at registerRun (Problem of communication with MDC
#Info: MDC-1100: MDC web server error: Error creating run
#Details: {'run_number': ['must be unique per proposal', 'has already been taken'], 'experiment_id': ['has already been taken']})
Cycling the DAQ resolved the issue. |
79
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status |
Starting shift with mirror motor calibration:
- beam is centered on FEL imager
- pblm in XTD9 is inserted
We removed both silicon solid attenuator and pblm |
Attachment 1: Init_2024-04-10_16-34-30.png
|
|
Attachment 2: status_2024-04-10_16-46-01.png
|
|
Attachment 3: FEL_imag_2024-04-10_16-40-29.png
|
|
Attachment 4: pblm_2024-04-10_16-52-34.png
|
|
78
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status |
Starting shift with mirror motor calibration:
- found solid attenuator 0.5mm silicon inserted
- beam is centered on FEL imager
- pblm in XTD9 is inserted
We removed both silicon solid attenuator and pblm |
Attachment 1: Init_2024-04-10_16-34-30.png
|
|
Attachment 2: status_2024-04-10_16-46-01.png
|
|
Attachment 3: FEL_imag_2024-04-10_16-40-29.png
|
|
Attachment 4: pblm_2024-04-10_16-52-34.png
|
|
81
|
11 Apr 2024, 21:54 |
Antje Trapp | XRO | SASE1 MIRROR MOTORS CALIBRATED |
Dear all,
we calibrated the mirror vertical motors to their geometrically neutral.
Please be aware that saved values for beamline settings may no longer be valid. This mainly applies to the vertical motor positions, but will have an impact on Tx and Ry values as well.
As starting point, use XRO Optics Setpoints 'C' - this setting was last used to bring beam to SPB |
Attachment 1: XRO_optics-setpoints_2024-04-11_22-05-08.png
|
|