| ID | Date | Author | Group | Subject | Text |  | 
| 144 | 11 Aug 2024, 02:15 | Wonhyuk Jo | MID | Shift summary | Found the spatial overlap on the Suna microscope with Zyla.
 Found the SDL motor position giving
 |  | 
| 143 | 11 Aug 2024, 00:13 | Andreas Galler | PRC | Attention | EPS Interlock change for Mode30: the 3 HIREX Interlock conditions had
 been disabled
 |   | 
| 142 | 10 Aug 2024, 07:19 | Romain Letrun | SPB | Issue | The SASE1 HIREX interlock is not working as expected.
 
 At the position 'OUT' (step
 |   | 
| 141 | 10 Aug 2024, 01:17 | Jörg Hallmann | MID | Shift summary | Found the delay time from upper and lower branches of SDL with a frosted-YAG.
 The upper branch is -512.8 and the
 |  | 
| 140 | 09 Aug 2024, 01:59 | Jörg Hallmann | MID | Shift summary | optimized the SDL alignment 
 found timing of the upper (-520
 ps) and lower branch (-514.5 ps) of the SDL
 |  | 
| 139 | 08 Aug 2024, 00:18 | Jörg Hallmann | MID | Shift summary | optimization of seeding (still not as good as needed)
 
 set position for the two color
 |  | 
| 138 | 29 Jul 2024, 23:22 | Romain Letrun | SPB | Shift summary | X-ray delivery
 
 
 11.0 keV, 1-351 pulses
 |  | 
| 137 | 29 Jul 2024, 06:45 | Giuseppe Mercurio | SCS | Shift summary | ## Shift summary night July 28th-29th 
 Achievements:
 - we saw signal on both MCPs (with
 |  | 
| 136 | 28 Jul 2024, 23:34 | Romain Letrun | SPB | Shift summary | X-ray delivery
 
 
 11.0 keV, 1-352 pulses
 |  | 
| 135 | 27 Jul 2024, 23:42 | Romain Letrun | SPB | Shift summary | X-ray delivery - 9.22 and 11.0 keV, 1-352 pulses
 @ 1.1 MHz, 600-1400 uJ.
 |  | 
| 134 | 27 Jul 2024, 09:10 | Harald Sinn | PRC | Issue | SASE1: Solid attenuator att5 is in error. When it is tried to move it out, the arm
 lifts, but does not reach the final position
 |  | 
| 133 | 24 Jul 2024, 15:22 | Giuseppe Mercurio | SCS | Shift summary | Shift
 summary (Natalia, Giuseppe)
 
 Achievements:
 
 
 M1, M2 pitches adjusted
 Grating
 |  | 
| 132 | 24 Jul 2024, 11:35 | Harald Sinn | PRC | Issue | The control rack of the soft mono at SASE3 has some failure. Leandro from EEE will enter
 the XTD10 at 12:00.
 |  | 
| 131 | 24 Jul 2024, 10:26 | Harald Sinn | PRC | Issue | In SASE2 undualtor cell 10 has issues. Suren K. will do a ZZ at 11:30 to fix it
 (if possible). Estimated duration: 1-3 hours.
 |  | 
| 130 | 23 Jul 2024, 17:17 | Idoia | XRO | Shift summary | 
 ZZ
 access at XTD10
 
 
 The
 LE PM X and HE PM X motors were checked and
 |  | 
| 128 | 22 Jul 2024, 15:27 | Antje Trapp | XRO | SASE3 end of shift summary | this morning, ZZ was done together with Sylvia Huynh (EEE) to solve softmono pre-mirror
 motor issue https://redmine.xfel.eu/issues/177392
 |  | 
| 129 | 22 Jul 2024, 15:20 | Antje Trapp | XRO | SASE2 end of shift summary | Beam is now aligned back to HED for hand-over to Naresh (see picture)
 
 points achieved:
 |   | 
| 127 | 18 Jun 2024, 13:03 | Kelin Tasca | XRO | Compensation of M2 RY motor for the case of Piezo off | We plan to put the piezos of M2 off, in the (unprobable) case that this is the reason
 of the "jumps" in SASE3 trajectory.
 |     | 
| 126 | 14 Jun 2024, 01:53 | Jörg Hallmann | MID | Shift summary | continue with Tempus tests continue with PAM commissioning (first
 results of the working device at MID)
 |  | 
| 125 | 13 Jun 2024, 01:46 | Jörg Hallmann | MID | Shift summary | alignment of the instrument including collimation and beam shaping
 test of the tempus detector using
 |  |