ID Date Author Group Subject Text Attachments
  153   24 Aug 2024, 23:09 Chan KimSPBShift summaryX-ray delivery

-12.40
- 12.82 keV, XDT9 XGM ~0.81 mJ@ end of shift
  
  152   23 Aug 2024, 08:48 Peter ZaldenFXEShift summaryUsed 9.4 keV with 94 kHz wed and thu nights.
Received approx. 0.9 mJ with large fluctuations
in pulse energy, however acceptable for the
  
  151   22 Aug 2024, 23:15 Raphael de WijnSPBShift summaryX-ray delivery

12.40 - 12.82 keV, ~1.1 mJ

Optical laser delivery
  
  150   21 Aug 2024, 23:34 Raphael de WijnSPBShift summaryX-ray delivery

12.40 - 12.82 keV, ~1.1 mJ

Optical laser delivery
  
  149   13 Aug 2024, 02:04 Wonhyuk JoMIDShift summaryFound the interference fringe at Suna microscope
with Zyla cam from MID split-and-delay line. 
The fringe patterns were recorded
  
  148   12 Aug 2024, 23:47 Raphael de WijnSPBShift summary
X-ray
delivery

11.56 keV, 202 pulses @0.5 MHz,
  
  147   12 Aug 2024, 02:07 Wonhyuk JoMIDShift summaryFound spatial overlap at Suna microscope
with Zyla cam.
The splitting ratio was obtained about
  
  146   11 Aug 2024, 23:07 Raphael de WijnSPBShift summaryX-ray delivery

11.56 keV 202 pulses @0.5 MHz,
~1.0 mJ
  
  145   11 Aug 2024, 14:33 Romain LetrunSPBShift summarySummary 06.08
- 10.08

X-ray
  
  144   11 Aug 2024, 02:15 Wonhyuk JoMIDShift summaryFound the spatial overlap on the Suna microscope
with Zyla.
Found the SDL motor position giving
  
  143   11 Aug 2024, 00:13 Andreas GallerPRCAttentionEPS Interlock change for Mode30:
the 3 HIREX Interlock conditions had
been disabled
 Screenshot_2024-08-11_at_00.12.04.png 
  142   10 Aug 2024, 07:19 Romain LetrunSPBIssueThe SASE1 HIREX interlock is not working
as expected.

At the position 'OUT' (step
 Screenshot_from_2024-08-10_07-17-38.png 
  141   10 Aug 2024, 01:17 Jörg HallmannMIDShift summaryFound the delay time from upper and lower
branches of SDL with a frosted-YAG.
The upper branch is -512.8 and the
  
  140   09 Aug 2024, 01:59 Jörg HallmannMIDShift summaryoptimized the SDL alignment

found timing of the upper (-520
ps) and lower branch (-514.5 ps) of the SDL
  
  139   08 Aug 2024, 00:18 Jörg HallmannMIDShift summaryoptimization of seeding (still not as good
as needed)

set position for the two color
  
  138   29 Jul 2024, 23:22 Romain LetrunSPBShift summaryX-ray
delivery


11.0 keV, 1-351 pulses
  
  137   29 Jul 2024, 06:45 Giuseppe MercurioSCSShift summary## Shift summary night July 28th-29th

Achievements:
- we saw signal on both MCPs (with
  
  136   28 Jul 2024, 23:34 Romain LetrunSPBShift summaryX-ray
delivery


11.0 keV, 1-352 pulses
  
  135   27 Jul 2024, 23:42 Romain LetrunSPBShift summaryX-ray delivery
- 9.22 and 11.0 keV, 1-352 pulses
@ 1.1 MHz, 600-1400 uJ.
  
  134   27 Jul 2024, 09:10 Harald SinnPRCIssueSASE1: Solid attenuator att5 is in error.
When it is tried to move it out, the arm
lifts, but does not reach the final position
  