Morning Shift Summary on 16.08.2023, posted by Teguh Citra Asmara, Eugenio Paris on 17 Aug 2023, 11:07
|
Achievements:
Performed tr-RIXS on peak A, B, and C at 2.4 mJ/cm^2
Performed tr-XAS on peak A at 3 fluences
Performed tr-RIXS
on peak A at 4 mJ/cm^2
Problems: |
Afternoon shift summary on 16.08.2023, posted by Teguh Citra Asmara on 17 Aug 2023, 11:08
|
Achievements:
tr-RIXS at 4 mJ/cm2 for energies A, B, C, and D (pre-edge)
Checked and optimized FEL alignment, t0 and overlap with PP laser
after reset of machine synchronization
Long delay scans for Peak A and C, up to 100 ps |
Shift summary, posted by Silja Schmidtchen on 16 Apr 2023, 15:35
|
shift summary from Saturday 15.04.2023:
Tasks:
- Calibration of Euler MDL |
Shift Summary SA2, posted by Silja Schmidtchen on 21 Jul 2023, 20:31
|
Alignment to HED: https://in.xfel.eu/elog/XRO+Beam+Commissioning/205
SA2 - divergence with various M2 bender positions HED - https://in.xfel.eu/elog/XRO+Beam+Commissioning/200
SA2 - divergence with various M2 bender positions MID - https://in.xfel.eu/elog/XRO+Beam+Commissioning/196 |
Morning Shift Summary, 24.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:10
|
Morning Shift Summary, 24.10.2023
Achievements:
Re-aligned the beamline after maintenance
Found time zero using SiN at 300 K
Change the He dewar and cooled down
back to 20 K
Adjusted the AFS laser parameters to recover the proper experiment settings
Started taking tr-RIXS with several time |
Morning Shift Summary, 25.10.2023, posted by Sergii, Teguh on 25 Oct 2023, 15:18
|
Morning Shift Summary, 25.10.2023
Achievements:
Re-aligned FEL beam pointing and beamline mirrors after XGM intensity drop due to slow beam pointing drift over night.
Continued
taking momentum-dependent tr-REXS data.
Problems: |
Morning shift summary, 26.10.2023, posted by Sergii, Teguh on 26 Oct 2023, 15:03
|
Morning shift summary, 26.10.2023
Achievements:
Continued measuring tr-RIXS at different laser fluences
Problems:
The max-jhub notebook server was very slow this morning around 9-10 h. DOC was informed, but the slowness has improved without any action |
Late shift summary 04.05.2023, posted by Sergii, Phuong on 04 May 2023, 22:58
|
Achivements:
-Cooling down the sample. Sample is at 14K
-Taking time resolved data at 70% 800 nm, -5 ps - 65 ps |
Late shift summary 05.05.2023, posted by Sergii, Phuong on 05 May 2023, 23:00
|
Achivments:
-Measure time scans with magnetic field in opposite directions
Problems |
Late shift summary 06.05.2023, posted by Sergii, Phuong on 06 May 2023, 23:15
|
Achivments:
-Measure delay scans at two PPL fluencies on smaller grain size.
-Moved DSSC back to 1.45 m sample - detector distance |
Late shift summary 07.05.2023, posted by Sergii, Phuong on 07 May 2023, 23:11
|
Achivments:
-Move DSSC closer to the sample.
-Measure delay scans for opposite magnetic field. |
Late shift summary 01.03.2023, posted by Sergii, Martin on 01 Mar 2023, 23:31
|
Achievments:
- Align DPS to remove clipping of X-rays
- Get better focusing of PPL in the chamber |
Night shift summary 30.07.2023, posted by Sergii, Martin on 31 Jul 2023, 01:42
|
Achivements:
-We measured vertical spot size for several VFM settings
Problems: |
Shift Summary 27_07_23 night, posted by Sergii, Manuel on 28 Jul 2023, 06:38
|
Achievements:
1. Beam in sample chamber, almost overlapping with ALAS
2. We saw signal on MCP and diode2 |
Noght shift sammary 18.08.2023, posted by Sergii, Manuel on 19 Aug 2023, 07:16
|
Night shift summary on 18.03.2023
Finished XAS series at 1.5 mJ/mm² for different delays
Performed XAS at 6 mJ/mm²
Tested tr-RIXS signal
at 1mj/mm² with 29 different delays, signal too weak to continue
Took 5 hours of tr-RIXS signal at 1.2 mj/mm² with 29 different delays
Problems: |
Late Shift Summary on 20.10.2023, posted by Sergii, Giacomo on 20 Oct 2023, 23:22
|
Late shift summary 20.10.2023
Achievements
-Switched AFS to burst mode
-Characterized PPL beam size |
Late shift summary 21.10.2023, posted by Sergii, Giacomo on 21 Oct 2023, 23:34
|
Achievements:
-Collecting TR-RIXS data for different fluencies and delay range
Problems |
late shift summary, posted by Sergii, Andreas on 04 Mar 2023, 23:04
|
Achievements:
- we replaced broken SMA cable, and added an angle-connector at sample holder to aid the sample rotation when moving diagnostics to the flat
jet |
Late shift summary 05.03.2023, posted by Sergii, Andreas on 05 Mar 2023, 23:04
|
Achievments
-RIXS scans at different delay times and x-ray energies
-Cross check fine timing |
Late shift summary 05.08.2023, posted by Sergii, Andreas on 05 Aug 2023, 23:06
|
Achievements:
- Find course timing with antenna
-Find find timing signla with TR_XAS on the sample |