Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 22 of 24  Not logged in ELOG logo
Entry   Shift summary, posted by Richard Bean on 19 Feb 2023, 23:28 
X-ray delivery


9.3 keV, 120 pulses
Good Beam Stability -~1mJ


Achievements/Observations


Double Slit and V-Pattern Interference Measurements
Nearfield Ptycho-Scans
Nano-KB (@Richard)


Issues
Entry   Shift summary 2023-02-19, posted by Motoaki Nakatsutsumi, Oliver Humphries, Carsten Baehtz on 19 Feb 2023, 23:25 P_20230220_045813b.jpgP_20230220_054233b.jpg
8.2 keV, 750 uJ. 

Short summary

- Optimize the downstream nanofocus CRL to image the sample to our detector (optique Peter) - successful)
Entry   late shift summary, posted by bouffetier on 19 Feb 2023, 19:51 
19 Feb 2023,15:30 Shift handover

Runs will be added in the general Elog for data runs and acqusitions (Elog-4)
Entry   Day shift summary, posted by Erik Brambrink on 19 Feb 2023, 08:06 
19 Feb 2023, 08:08 Hand over from night shift

Added polarizer in the PAM beam in the optics hutch, reequilibrated reference arm of PAM

19 Feb 2023, 08:09 Darks taken for JF 1 and 2
Entry   Shift summary - night shift 2023-02-18, posted by Motoaki Nakatsutsumi, Carsten Baehtz, Olver Humphries on 19 Feb 2023, 05:29 Foc_scan_2000l_mm.PNG
18 Feb 2023, 23:37 Together with the last shift members, we continued shooting laser on Cu 25 um thick wire for another 2 hours. We got excellent quality
x-ray imaging with a series of time delay up to several ns (eLog ID 39).  X-ray imaging is now commissioned. The magnification was x7.5.

19 Feb 2023, 01:30 We tried to go to x20, but we couldn't find the x-ray beam. We even put the burn paper in front of the Optique Peter to
Entry   Shift summary, posted by Richard Bean on 19 Feb 2023, 00:34 
X-ray delivery


 9.3 keV, 1-120 pulses,
good stabiltiy, lowish flux ~900uJ, but experimental requirements were met


Achievements/Observations


Finished doule slit measurements at micron beam
Alignment to direct beam
Sample position for the sand paper found
Some
Entry   Night Shift summary, posted by Benjamin, Manuel, Ricardo on 18 Feb 2023, 07:06 
Achievements


Used scanning of liquid jet to improve S/N
Measured x-ray PP XAS as a function of the delay between the two X-ray colors
Scan
energy of probe pulse with fixed pump energy


Problems
Entry   Shift summary - night shift 2023-02-17, posted by Motoaki Nakatsutsumim, Carsten Baehtz, Olly Humphries on 18 Feb 2023, 00:32 Aligned_A2_E5_2023-02-18_00-35-18.pngWire_OPeter_2023-02-18_00-52-19.pngScreenshot_from_2023-02-18_00-54-25.pngScreenshot_from_2023-02-18_00-59-37.pngScreenshot_from_2023-02-18_01-02-21.png
Ealier shift members managed to get a good quality image on Optique Peter by imaging the sample plane to the Optique Peter with downstream nanofocus
(CRL4b). The quality is far superiour compared to the one with upstream nanofocus, which does just a projection of sample (backlight). The decision is
to stay with the downstream CRL. They had a few full power shots. The problem of reading Zyla data when rotation = 0 is solved by Olly. He put the script
Entry   Late shift activities, posted by bouffetier on 17 Feb 2023, 17:16 7x
17 Feb 2023, 17:15 : We centered Pin in the FEL beam and then imaged this pin with ILM and FSI to get common references.
                                
We corected astigmatism with OAP
Entry   late shift summary, posted by Laurent Mercadier, Luigi Adriano on 17 Feb 2023, 02:24 
2 color mode

Achievements


Fluence scan
delay scan to identify cross talk of two colors
Optimized beam size


 
Entry   Shift summary, posted by Chan Kim on 16 Feb 2023, 23:15 
X-ray delivery


9.3 keV, 1-120 pulses


Optical laser delivery


No Optical Laser


Achievements/Observations
Entry   End of Shift, posted by Trey Guest on 16 Feb 2023, 23:01 
Staff: KK, RB, TG, AS, CK

X-ray delivery


9.3 keV, 1-120 pulses,


Optical laser delivery
Entry   SA2 status, posted by Frederik Wolff-Fabris on 16 Feb 2023, 14:04 HED_PopinX_cw05_23.pngHED_PopinX_cw07_23.png
Data for the Horizontal jitter at the HED Pop-In was observed during beam delivery on cw05 (03-05.Feb) and cw07 (14-16.Feb) (see attached pictures). 

We have a similar base jitter in both periods of beam delivery to HED, ranging from a minimum of 50-60um to around 80-100um in both operational
weeks.
Entry   Shift summary, posted by Chan Kim on 16 Feb 2023, 07:17 
Shift summary 15.2.2023 (Wednesday)

X-ray delivery


9.3 keV, 1-200 pulses, 1.0 mJ, pulse energy fluctuation due to SA3 tunning & special operation mode (SCS)


Optical
Entry   late shift summary 2nd day, posted by Luigi, Laurent on 15 Feb 2023, 23:05 
Achievememts:


optimised the beam rep rate to value of 140KHz for a better signal 
changed nozzles and refilled the reservoir
Improved
notebook for data analysis
Cammille made an online tool to see correlations between Viking and XGM --> very useful!


Night
Entry   Night Shift Summary, posted by Benjamin van Kuiken on 15 Feb 2023, 06:54 
Achievements


Located flat jet and attempted measurement of XAS at several incident energies 1300, 1305, 1315 eV


Problems


 We have difficulty locating the beam on the sample

We have not found a signal on eith of the diodes in the Chem chamber.
Knife
Entry   late shift shift summary, posted by Laurent Mercadier, Luigi Adriano on 15 Feb 2023, 01:40 
Achievements


Two color mode established with 11.5 GeV, 1.335 keV col1, 1.27 keV col2
Beam size characterized using Viking + online tool
Jet
found by scanning and looking at transmitted signal on Viking


Problems
Entry   Issue, posted by Frederik Wolff-Fabris on 13 Feb 2023, 19:02 
SA3 SCS exit slit: the upper blade was detached from the motor and fall into closed position. Maurizio V. and F. Wolff-Fabris tried to move it out
of the beam by placing spacers to hold the blade up.

Bottom blade was moved down with the motors. Currently both motors are disconnected.
Entry   Shift summary, posted by Tokushi Sato on 13 Feb 2023, 07:17 
X-ray delivery


9.3 keV, 1-85 pulses, 1 mJ, stable delivery


Optical laser delivery


800 nm, 1-226 pulses, stable delivery
ns laser for illumination


Achievements/Observations
Entry   Shift summary, posted by Tokushi Sato on 12 Feb 2023, 06:53 
X-ray delivery


9.3 keV, 1-85 pulses, 1 mJ, stable delivery


Optical laser delivery


800 nm, 1-226 pulses, stable delivery
ns laser for illumination


Achievements/Observations
ELOG V3.1.4-7c3fd00