Shift summary, posted by Richard Bean on 19 Feb 2023, 23:28
|
X-ray delivery
9.3 keV, 120 pulses
Good Beam Stability -~1mJ
Achievements/Observations
Double Slit and V-Pattern Interference Measurements
Nearfield Ptycho-Scans
Nano-KB (@Richard)
Issues |
Shift summary 2023-02-19, posted by Motoaki Nakatsutsumi, Oliver Humphries, Carsten Baehtz on 19 Feb 2023, 23:25
|
8.2 keV, 750 uJ.
Short summary
- Optimize the downstream nanofocus CRL to image the sample to our detector (optique Peter) - successful) |
late shift summary, posted by bouffetier on 19 Feb 2023, 19:51
|
19 Feb 2023,15:30 Shift handover
Runs will be added in the general Elog for data runs and acqusitions (Elog-4)
|
Day shift summary, posted by Erik Brambrink on 19 Feb 2023, 08:06
|
19 Feb 2023, 08:08 Hand over from night shift
Added polarizer in the PAM beam in the optics hutch, reequilibrated reference arm of PAM
19 Feb 2023, 08:09 Darks taken for JF 1 and 2 |
Shift summary - night shift 2023-02-18, posted by Motoaki Nakatsutsumi, Carsten Baehtz, Olver Humphries on 19 Feb 2023, 05:29
|
18 Feb 2023, 23:37 Together with the last shift members, we continued shooting laser on Cu 25 um thick wire for another 2 hours. We got excellent quality
x-ray imaging with a series of time delay up to several ns (eLog ID 39). X-ray imaging is now commissioned. The magnification was x7.5.
19 Feb 2023, 01:30 We tried to go to x20, but we couldn't find the x-ray beam. We even put the burn paper in front of the Optique Peter to |
Shift summary, posted by Richard Bean on 19 Feb 2023, 00:34
|
X-ray delivery
9.3 keV, 1-120 pulses,
good stabiltiy, lowish flux ~900uJ, but experimental requirements were met
Achievements/Observations
Finished doule slit measurements at micron beam
Alignment to direct beam
Sample position for the sand paper found
Some |
Night Shift summary, posted by Benjamin, Manuel, Ricardo on 18 Feb 2023, 07:06
|
Achievements
Used scanning of liquid jet to improve S/N
Measured x-ray PP XAS as a function of the delay between the two X-ray colors
Scan
energy of probe pulse with fixed pump energy
Problems |
Shift summary - night shift 2023-02-17, posted by Motoaki Nakatsutsumim, Carsten Baehtz, Olly Humphries on 18 Feb 2023, 00:32
|
Ealier shift members managed to get a good quality image on Optique Peter by imaging the sample plane to the Optique Peter with downstream nanofocus
(CRL4b). The quality is far superiour compared to the one with upstream nanofocus, which does just a projection of sample (backlight). The decision is
to stay with the downstream CRL. They had a few full power shots. The problem of reading Zyla data when rotation = 0 is solved by Olly. He put the script |
Late shift activities, posted by bouffetier on 17 Feb 2023, 17:16 7x
|
17 Feb 2023, 17:15 : We centered Pin in the FEL beam and then imaged this pin with ILM and FSI to get common references.
We corected astigmatism with OAP |
late shift summary, posted by Laurent Mercadier, Luigi Adriano on 17 Feb 2023, 02:24
|
2 color mode
Achievements
Fluence scan
delay scan to identify cross talk of two colors
Optimized beam size
|
Shift summary, posted by Chan Kim on 16 Feb 2023, 23:15
|
X-ray delivery
9.3 keV, 1-120 pulses
Optical laser delivery
No Optical Laser
Achievements/Observations |
End of Shift, posted by Trey Guest on 16 Feb 2023, 23:01
|
Staff: KK, RB, TG, AS, CK
X-ray delivery
9.3 keV, 1-120 pulses,
Optical laser delivery |
SA2 status, posted by Frederik Wolff-Fabris on 16 Feb 2023, 14:04
|
Data for the Horizontal jitter at the HED Pop-In was observed during beam delivery on cw05 (03-05.Feb) and cw07 (14-16.Feb) (see attached pictures).
We have a similar base jitter in both periods of beam delivery to HED, ranging from a minimum of 50-60um to around 80-100um in both operational
weeks. |
Shift summary, posted by Chan Kim on 16 Feb 2023, 07:17
|
Shift summary 15.2.2023 (Wednesday)
X-ray delivery
9.3 keV, 1-200 pulses, 1.0 mJ, pulse energy fluctuation due to SA3 tunning & special operation mode (SCS)
Optical |
late shift summary 2nd day, posted by Luigi, Laurent on 15 Feb 2023, 23:05
|
Achievememts:
optimised the beam rep rate to value of 140KHz for a better signal
changed nozzles and refilled the reservoir
Improved
notebook for data analysis
Cammille made an online tool to see correlations between Viking and XGM --> very useful!
Night |
Night Shift Summary, posted by Benjamin van Kuiken on 15 Feb 2023, 06:54
|
Achievements
Located flat jet and attempted measurement of XAS at several incident energies 1300, 1305, 1315 eV
Problems
We have difficulty locating the beam on the sample
We have not found a signal on eith of the diodes in the Chem chamber.
Knife |
late shift shift summary, posted by Laurent Mercadier, Luigi Adriano on 15 Feb 2023, 01:40
|
Achievements
Two color mode established with 11.5 GeV, 1.335 keV col1, 1.27 keV col2
Beam size characterized using Viking + online tool
Jet
found by scanning and looking at transmitted signal on Viking
Problems |
Issue, posted by Frederik Wolff-Fabris on 13 Feb 2023, 19:02
|
SA3 SCS exit slit: the upper blade was detached from the motor and fall into closed position. Maurizio V. and F. Wolff-Fabris tried to move it out
of the beam by placing spacers to hold the blade up.
Bottom blade was moved down with the motors. Currently both motors are disconnected. |
Shift summary, posted by Tokushi Sato on 13 Feb 2023, 07:17
|
X-ray delivery
9.3 keV, 1-85 pulses, 1 mJ, stable delivery
Optical laser delivery
800 nm, 1-226 pulses, stable delivery
ns laser for illumination
Achievements/Observations |
Shift summary, posted by Tokushi Sato on 12 Feb 2023, 06:53
|
X-ray delivery
9.3 keV, 1-85 pulses, 1 mJ, stable delivery
Optical laser delivery
800 nm, 1-226 pulses, stable delivery
ns laser for illumination
Achievements/Observations |