Entry   Issue, posted by Jan Gruenert on 22 Jan 2023, 18:40 JG_2023-01-22_um_17.43.36.pngJG_2023-01-22_um_18.17.31.pngJG_2023-01-22_um_18.23.20.pngJG_2023-01-22_um_18_1.37.21.png
SASE1 blocked to 1 bunch/train by EPS interlock (sic, not 2 but 1) --- PARTIALLY RESOLVED

Several issues:

1) MODEM device is broken, in state UNKNOWN, see ATT#1 and ATT#2. Fixed with deinstatiating and then using BECKHOFF_ASSISTANT to re-instantiate.
Entry   Analyze and quantify the mispositioning of the new 4mm-aperture behind the undulator, posted by Jan Gruenert on 21 Jan 2023, 16:38 JG_2023-01-21_16-06-48.pngJG_IMGFEL_2023-01-21_16-21-01.pngIMGFEL_no_cross_2023-01-21_16-27-22.pngIMGFEL_with_cross_2023-01-21_16-30-16.png
Goal: Analyze and quantify the mispositioning of the new 4mm-aperture behind the undulator

Positions in tunnel:


ABSP4.2422.SA2 = ABSP4.CELL37.SA2 L_z position 2422.558m
Last closed undulator for this test is cell16 at 2294m (at end of
Entry   Issue, posted by Jan Gruenert on 17 Jan 2023, 10:25 JG_SASE3_no_beam_permission_2023-01-17_09-13-31.png
SASE3 peration issue - SOLVED

 

Controls issue, the machine cannot make beam in SASE3.

From
BKR / DOOCS the problem description is: Big Brother is blocking SASE3 beam due to an EPS power limit of 0 Watt.


Looking into the SASE3 karabo topic, many devices are not instantiated, ATT #1.

The state of the PREABS  preabsorber is not known
Entry   Issue, posted by Jan Gruenert on 16 Jan 2023, 19:50 JG_2023-01-16_um_16.30.12.pngJG_2023-01-16_um_16.30.50.png
Problem: Beam operation in SASE2 is prohibited by SEPS / MPS
Origin of problem: HED-CRL3
(this was already an issue during the past weekend)
Entry   CRL3: recalibration of y axis, test of x range and move to SEPS interlock trigger position, posted by karen appel on 16 Jan 2023, 16:01 
CRL3 arm 2, 5 and 9 were mecanically religned to the V groove and retracted to some y position.

The y motor position was recalibrated by moving the motor to the lower limit switch, moving it up by 0.5 mm and then recalibrating the motor
and encoder position to the former software limit position.
Entry   Status, posted by Theophilos Maltezopoulos on 16 Jan 2023, 11:33 
I started the upstream XGMs in XTD2, XTD1, and XTD10.
Entry   Diamond detector / DDM commissioning, posted by Wolfgang Freund on 26 Nov 2022, 10:40 DDM_inserted_Screenshot_from_2022-11-26_13-10-03.pngDD_2_pulses_IMGFEL_Screenshot_from_2022-11-26_13-32-47.png2022-11-26T17_20_00-01.pngDD_27keV_Screenshot_from_2022-11-26_18-12-30.png2022-11-26T17_11_18-00_orbit_kick_for_run_40.png
beam: 30 keV / 30 uJ
reduce to single bunch for insertion
put FEL imager in
Entry   Jet alignment test- obeserver, posted by Jaydeep Patel on 29 Oct 2022, 11:03 




Nozzle type


Nozzle Aperture(µm)


Sample