ID |
Date |
Author |
Group |
Subject |
401
|
21 Oct 2023, 23:34 |
Sergii, Giacomo | SCS | Late shift summary 21.10.2023 |
Achievements:
-Collecting TR-RIXS data for different fluencies and delay range
Problems
-No major problems |
403
|
22 Oct 2023, 07:34 |
Laurent, Phuong | SCS | night shift summary, 22.10.2023 |
Night shift summary 22.10.2023
Laurent, Phuong
Achievement:
-Collecting static RIXS data at different FEL repitition rates
-Continue collecting TR-RIXS data for different fluences
Problems
-No major problems
|
404
|
22 Oct 2023, 13:21 |
Benjamin van Kuiken | SCS | Shift summary |
Morning shift Summary 22.10.2023
Achievements
|
406
|
23 Oct 2023, 01:38 |
Sergii , Giacomo | SCS | Late shift summary 22.10.2023 |
Achievements
-Check XAS and static RIXS after the beam was back
-Do the warm up cycle to remove ice from the sample surface
-Check coarse timing after the beam drop
Problems
-Could not see the fine timing signal so far |
408
|
23 Oct 2023, 06:46 |
Laurent Mercadier | SCS | Night shift summary, 23.10.2023 |
06:45
Night shift summary, 23.10.2023
Phuong, Laurent
Achievements
- Aligned over doped sample
Problems
|
414
|
25 Oct 2023, 15:10 |
Sergii, Teguh | SCS | Morning Shift Summary, 24.10.2023 |
Morning Shift Summary, 24.10.2023
Achievements:
- Re-aligned the beamline after maintenance
- Found time zero using SiN at 300 K
- Change the He dewar and cooled down back to 20 K
- Adjusted the AFS laser parameters to recover the proper experiment settings
- Started taking tr-RIXS with several time delay points
Problems:
- The AFS laser power is smaller than last week
Next shift plan:
- Continue taking tr-RIXS data
|
415
|
25 Oct 2023, 15:18 |
Sergii, Teguh | SCS | Morning Shift Summary, 25.10.2023 |
Morning Shift Summary, 25.10.2023
Achievements:
- Re-aligned FEL beam pointing and beamline mirrors after XGM intensity drop due to slow beam pointing drift over night.
- Continued taking momentum-dependent tr-REXS data.
Problems:
- There was slow drift of FEL beam pointing over night, causing XGM intensity to slowly drop over time.
- The slow drop of XGM intensity continues even after beamline alignment. Compared to morning, the XGM intensity has dropped by ~10%.
- It is advisable to re-check the beam pointing again some time before the night shift due to correct for this beam drift problem.
|
417
|
26 Oct 2023, 07:13 |
Andreas Scherz / Eugenio Paris | SCS | night shift summary |
Night shift summary
Achievements:
- Recovered time0 on SiN (time0 moved >20ps after FEL beam loss in the evening)
- Collected static RIXS (actually with laser but negative delay) at the CDW at 113 kHz for different temperatures to investigate the effect of heating from the x-rays and from the laser
Problems:
- during late shift and after a beam dump in the evening, trRIXS signal could not be recovered. By checking the rough timing, they found a change in the x-ray arrival time of the order of >20 ps.
- We checked the beamline alignment and found that the pointing from the machine was off, requiring BKR to tune We also found that the photon energy offset between mono and undulators changed. Beam looked horizontally diffracted and the beam pointing moved in horizontal and was hitting the horizontal slits. We translated the open horizontal slits and pitch the beam properly into SCS branch with M5. |
418
|
26 Oct 2023, 15:03 |
Sergii, Teguh | SCS | Morning shift summary, 26.10.2023 |
Morning shift summary, 26.10.2023
Achievements:
- Continued measuring tr-RIXS at different laser fluences
Problems:
- The max-jhub notebook server was very slow this morning around 9-10 h. DOC was informed, but the slowness has improved without any action from either them or our side. The reason for this slowness is still unknown, but the max-jhub server has come back to normal for now.
|
420
|
26 Oct 2023, 23:25 |
Robert Carley | SCS | Late shift summary, 26.10.2023 |
Achievements:
- Continued with tr-RIXS
No problems
|
444
|
12 Nov 2023, 07:24 |
Benjamin van Kuiken | SCS | Night shift summary |
# Shift Summary
Achievements
- Found RIXS signal from CuO as well as off-resonant elastic line signals from NiO and CoO
- Found a potentially optimal exit arm setting and checked theta angle of sample
- Determined energy calibration
Problems
- Overall signal levels were quite low of CoO and NiO samples. This meant we had to work with open exit slits. Long scans would be required for optimization at HR conditions
- Interpolation procedure was giving lower signal as compared to direct integration. Algorithm needs to be checked. Analysis with no interpolation and curve correction is available in Software folder LLG/elastic_line_analysis.ipynb
Plan for next shift
- continue with optimization of hRIXS resolution
|
Attachment 1: p6696-r59.png
|
|
445
|
13 Nov 2023, 07:16 |
Loic Le Guyader | SCS | shift summary |
# Shift Summary
Achievements
- Measured elastic line with 3000 l/mm and 1000 l/mm grating on NiO sample
Problems
- only 50% of trains with jungfrau data in burst mode are saved in the DAQ. Likely an issue with DAQ configuration.
- we couldn't achieve a good focus on the sample and in the spectrometer. Reason unclear. |
3
|
16 Jan 2023, 19:50 |
Jan Gruenert | PRC | Issue |
Problem: Beam operation in SASE2 is prohibited by SEPS / MPS
Origin of problem: HED-CRL3
(this was already an issue during the past weekend)
HED (Karen) today realigned CRL3 and brought the lenses into the safe OUT state, see entry https://in.xfel.eu/elog/OPERATION-2023/2
In karabo then everything seemed find, SEPS switches all green / OUT, see ATT#1.
Nevertheless, in DOOCS the signal safety_HED_CRL_OPT was still red, see ATT#2.
The MPS safety_HED_CRL_OPT signal from the Beckhoff HED PLC was missing.
Onsite investigation by EEE (Leandro and Bernard) revealed that the Beckhoff crate BKF000476 was offline (switched off).
Switching the crate ON fixed the missing signal problem.
Presumably crate BKF00476 was not powered back on since after the planned power-cut in December 2022,
and because it is not part of PLC EtherCAT loop, the Nagios system didn't inform EEE about the crate status.
Result: Problem solved, beam operation in SASE2 can resume normally. |
Attachment 1: JG_2023-01-16_um_16.30.12.png
|
|
Attachment 2: JG_2023-01-16_um_16.30.50.png
|
|
4
|
17 Jan 2023, 10:25 |
Jan Gruenert | PRC | Issue |
SASE3 peration issue - SOLVED
Controls issue, the machine cannot make beam in SASE3.
From BKR / DOOCS the problem description is: Big Brother is blocking SASE3 beam due to an EPS power limit of 0 Watt.
Looking into the SASE3 karabo topic, many devices are not instantiated, ATT #1.
The state of the PREABS preabsorber is not known and it is not found in the device topology either.
SA3_XTD10_PREABS/DCTRL/OPEN.off
SA3_XTD10_PREABS/SWITCH/OUT_BEAM_1.state
SA3_XTD10_PREABS/DCTRL/LED_POWER
SA3_XTD10_PREABS/DCTRL/OPEN.state
Info to DRC and PRCs.
Two actions resolved the issue for now:
- XO changed in karabo the EPS power limits to the values used before the WMP (40 W).
- PRC and VAC instantiated the EPS-loop PLC devices
If this fully resolves the problem will be known when the machine will try to make beam again (now switching to hybrid 10 Hz / 5 Hz mode).
Another small problem at BKR is that the 3 big wall monitors are now working (ticket to ITDM issued).
|
Attachment 1: JG_SASE3_no_beam_permission_2023-01-17_09-13-31.png
|
|
6
|
22 Jan 2023, 18:40 |
Jan Gruenert | PRC | Issue |
SASE1 blocked to 1 bunch/train by EPS interlock (sic, not 2 but 1) --- PARTIALLY RESOLVED
Several issues:
1) MODEM device is broken, in state UNKNOWN, see ATT#1 and ATT#2. Fixed with deinstatiating and then using BECKHOFF_ASSISTANT to re-instantiate. --> ATT#3
2) Several devices in XTD9 are causing that MODES is interlocked: I restart broken devices of the FXE-PBLM and SPB-PBLM.
Then there is a broken MDL of SPB_XTD9_SCR called SPB_XTD9_SCR/MDL/BIU. This MDL is not in the SA1-topic system topology but shown with (X) on the SA1_MAIN scene, and this screen is blocking the interlock (see ATT#4)
SPB_XTD9_SCR/VSWITCH/HOLSTER_X_LIMITL is triggering the interlock SA1_SYS_EPS2MPS/DCTRL/MODES and causing that the machine cannot go to more than 2 bunches per train.
Even when going to SPB-topic this issue cannot be solved - all devices in SPB-topic related to this SCR seem fine.
3) To allow SASE1 tuning by the machine, BKR is closing shutter XS3. This avoids any beam into XTD9, resolved the interlock problem and allows the machine to continue SASE tuning.
4) We don't know what had blocked the beam not only to 2 but actually to 1 bunch / train (no traces of problems in Big Brother).
|
Attachment 1: JG_2023-01-22_um_17.43.36.png
|
|
Attachment 2: JG_2023-01-22_um_18.17.31.png
|
|
Attachment 3: JG_2023-01-22_um_18.23.20.png
|
|
Attachment 4: JG_2023-01-22_um_18_1.37.21.png
|
|
7
|
23 Jan 2023, 10:43 |
Jan Gruenert | PRC | Status |
Status of machine SASE tuning (just before switching off for monday maintenance):
11.5 GeV operation |
SASE1 |
SASE2 |
SASE3 |
Photon energy |
7 keV |
7 keV |
700 eV |
Max. obtained average pulse energy |
3.25 mJ |
1.35 mJ |
5.8 mJ |
FEL pointing confirmed on IMGFEL handover cross ? |
|
YES |
|
|
Attachment 1: JG_2023-01-23_um_10.04.56.png
|
|
8
|
25 Jan 2023, 08:40 |
Raśl Villanueva-Guerrero | PRC | All SASE's - SEPS Interlock Test - Results, Status & Upcoming Schedule |
Dear all,
please find here a summary of the status on this critical topic provided yesterday evening (around 19:15) by Zunaira Ansari (extract from her e-mail).
"Dear colleagues,
Thank you very much for your cooperation. SEPS interlock tests are completed in all SASEs except SASE3. AIBS interlock tests are complete in all hutches.
SASE3 SEPS interlock will be tested on Monday the 30th of January strating from 9a.m.
I kindly request the use of the SQS control hutch for the testing.
All SASE3 hutches will be interlocked on Monday morning.
@Maurizio and Bernard/ Nerea: Could you please be present during the testing? IIt will be much appreciated.
I would very much like to thank Eric, Nerea and especially Bernard for helping with the interlock tests today.
Best regards,
Zunaira
|
9
|
25 Jan 2023, 08:44 |
Raśl Villanueva-Guerrero | PRC | ZZ Access on 24th January (19:30h) - Replacement of Motor on SASE2 Undulator - Cell 17 Phase Shifter |
Dear all,
last evening Suren Karabekyan and myself did a short notice ZZ access to XTD1. The reason is that machine operators detected the lack of response on the Cell 17 Phase Shifter. The intervention was successful and around 20:30 we left the tunnel.
Regards,
R. |
17
|
05 Feb 2023, 15:18 |
Harald Sinn | PRC | Issue |
15:15 SCS called and reported an issue with one of the motors of the SCS exit slit. DOC already looked at the problem and could not make the motor move. XRO (Maurizio) is now informed and looks at the problem
17:10 ZZ access to XTD by Maurzio and Mikako
18:00 ZZ finished. Unfortunatly the motor is completely blocked, even with cables disconnected one cannot move it. |
26
|
11 Feb 2023, 13:55 |
Andreas Galler | PRC | Status |
Gun Modulator Problems
Gun Trip at 11:23 and since then the Modulator trips after each restart.
Accelerator Shift Crews and On Call personnel working on fixing the issue. |