Notes XO Integration Meeting 21.10.2024, posted by Andreas Galler on 21 Oct 2024, 09:28
|
General Announcement:
nothing
CTRL:
Nothing major
DA: |
Notes XO Integration Meeting 16.10.2024, posted by Frederik Wolff-Fabris on 16 Oct 2024, 09:57
|
General Announcement:
- Reminder that Nov. 1st is the deadline for submitting the Winter Maintenance task list to XO.
- As PRC, Maurizio Vannoni says no issues are currently happening.
|
Notes XO Integration Meeting 14.10.2024, posted by Frederik Wolff-Fabris on 14 Oct 2024, 09:41
|
General Announcement:
- Currently machine is now operating at 16.3GeV.
- The Winter maintenance task list was published last week. In case of questions please reach XO and/or Martin Doering.
|
Notes XO Integration Meeting 09.10.2024, posted by Frederik Wolff-Fabris on 09 Oct 2024, 09:49
|
General Announcement:
- Martin Doering informs on the next Winter Maintenance period:
1. Release of maintenance task list to the groups up to the end of this week;
|
Notes XO Integration Meeting 07.10.2024, posted by Frederik Wolff-Fabris on 07 Oct 2024, 09:54
|
General Announcement:
- A. Galler informs a power glitch happened today at around 07:40AM, however machine was unaffected. Please check your systems.
|
Notes XO Integration Meeting 02.10.2024, posted by Frederik Wolff-Fabris on 02 Oct 2024, 09:41
|
General Announcement:
-
|
Notes XO Integration Meeting 30.09.2024, posted by Frederik Wolff-Fabris on 30 Sep 2024, 09:46
|
General Announcement:
-
|
Notes XO Integration Meeting 25.09.2024, posted by Frederik Wolff-Fabris on 25 Sep 2024, 09:57
|
General Announcement:
- Machine had a rough day yesterday and last night with downtimes due to problems with L-IBFB, dump communication, vacuum in A14.
Files for beam delivery were prepared and small pointing corrections had to be done this early morning. Beam is currently in delivery mode.
|
Notes XO Integration Meeting 23.09.2024, posted by Frederik Wolff-Fabris on 23 Sep 2024, 10:01
|
General Announcement:
- As DRC, Krzysztof Wrona and Monica Turcato report all is fine at DOC, no major issues and no DRC calls overnight.
|
Notes XO Integration Meeting 18.09.2024, posted by Frederik Wolff-Fabris on 18 Sep 2024, 09:51
|
General Announcement:
-
|
Notes XO Integration Meeting 16.09.2024, posted by Frederik Wolff-Fabris on 16 Sep 2024, 10:03
|
General Announcement:
- As PRC, Maurizio V. reports some calls over the weekend mostly for exchange of info on minor issues that were addressed
|
Notes XO Integration Meeting 11.09.2024, posted by Frederik Wolff-Fabris on 11 Sep 2024, 09:50
|
General Announcement:
- Todays the machine setup is ongoing and from tomorrow it starts the beam delivery, as planned.
|
Notes XO Integration Meeting 09.09.2024, posted by Frederik Wolff-Fabris on 09 Sep 2024, 09:38
|
General Announcement:
- A. Galler informs a downtime of about 30min happened this morning in the North Branch due to a faulty vacuum controller.
- H. Sinn mentions on the beam drift in SA1: it was seen in both instruments over the weekend and is likely the comes from M1 but can be corrected by feedbacks |
Notes XO Integration Meeting 04.09.2024, posted by Frederik Wolff-Fabris on 04 Sep 2024, 09:40
|
General Announcement:
- Machine tuning last two days was hindered as a power supply for a camera in injector laser had to be exchanged. As consequence, the camera moved and
had to be re-aligned costing time.
|
Notes XO Integration Meeting 02.09.2024, posted by Frederik Wolff-Fabris on 02 Sep 2024, 09:53
|
General Announcement:
-
|
Notes XO Integration Meeting 28.08.2024, posted by Frederik Wolff-Fabris on 28 Aug 2024, 09:52
|
General Announcement:
- Communications Group thanks all people involved on the SRI visit. The extension of the beam delivery also worked nicely to instruments.
- As PRC, A. Galler says so far there is nothing to report or discuss for the current week.
|
Notes XO Integration Meeting 26.08.2024, posted by Andreas Galler on 26 Aug 2024, 09:28
|
General Announcement:
- Today Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending
the beam delivery on Tuesday from 7:00AM up to 12:00. |
Notes XO Integration Meeting 21.08.2024, posted by Frederik Wolff-Fabris on 21 Aug 2024, 09:46
|
General Announcement:
- Next Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending
the beam delivery on Tuesday from 7:00AM up to 12:00.
|
Notes XO Integration Meeting 19.08.2024, posted by Frederik Wolff-Fabris on 19 Aug 2024, 09:41
|
General Announcement:
- As DRC, Steffen Hauf reminds that if support from DA groups is needed, please request as soon as it is needed; Second: please instruments check if the
Zoom is installed and running in the control rooms.
|
Notes XO Integration Meeting 14.08.2024, posted by Frederik Wolff-Fabris on 14 Aug 2024, 09:44
|
General Announcement:
- This morning difficulties to switch to SA2 9keV SASE happen but right now it is working for delivery to HED.
- Eric Boyd informs D3 would like to access an optical hutch to test insert for BTM on next Tuesday. An e-mail will be sent to xo-info mailing list asking |