Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 582     Entry time: 27 Jan 2025, 09:59
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 27.01.2025 
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend: 
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine; 
SA2 - positions of mirrors were found and placed at commissioning logbook; one Attenuator had a problem and feedback from instruments will be asked; 
Piezo in M1 was misbehaving and is repaired, but still to be set by XRO; 
SA3 - positions were found and almost the same as before maintenance, small differences are set and shall be used as a guide when beam is taken; 
A limit switch in M5 need a ZZ to be moved by 1mm; Horizontal SCS slit has relative encoders and work with 1um in accuracy. Soft-mono auto collimator is also commissioned (XRO can help if needed). 

CTRL:
- Proceeding with bring-up days. All fine so far.

DA:
- Bring-up days: 5 out 7 days went well so far.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Taking beam this morning in SA3 for MCP detector.
- Last days: Spectrometers in SA1 and SA2 are up and running also calibrated with Mono; HXRSS setup was also commissioning (all motors working); All good from spectrometers (HIREX and PES).
- All fine for Imagers.

DET:
- Nothing to report.

ITDM: 
- Reminder for update/service on Dcache tomorrow.

XRO:
- Couple of things that need access in XTD10 (stuck motor and a switch). Probably to be done on Tuesday morning.
- Motor/temperature issues with SRA SA1: Terminals were replaced and everything is fine.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine;
- On Friday afternoon measurements with K-mono in SA1 and SA3 were done; analysis is ongoing.

SPB:
- Bring up days went fine.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Concluded bring up days. Thanks for the support.

SCS:
- Bring up day today; changed day plan due to a change with Gotthard-II that has to be fixed.

SQS:
- Nothing to report.

SXP:
- Bring up days: all good.
ELOG V3.1.4-7c3fd00