SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 582
Entry time: 27 Jan 2025, 09:59
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 27.01.2025 |
|
|
General Announcement:
- Maurizio Vannoni reports on behalf of XRO on the ramp-up activities over the weekend:
SA1 - positions of mirrors were found (post in Zulip) No major problems were found; Attenuators look fine;
SA2 - positions of mirrors were found and placed at commissioning logbook; one Attenuator had a problem and feedback from instruments will be asked;
Piezo in M1 was misbehaving and is repaired, but still to be set by XRO;
SA3 - positions were found and almost the same as before maintenance, small differences are set and shall be used as a guide when beam is taken;
A limit switch in M5 need a ZZ to be moved by 1mm; Horizontal SCS slit has relative encoders and work with 1um in accuracy. Soft-mono auto collimator is also commissioned (XRO can help if needed).
CTRL:
- Proceeding with bring-up days. All fine so far.
DA:
- Bring-up days: 5 out 7 days went well so far.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Taking beam this morning in SA3 for MCP detector.
- Last days: Spectrometers in SA1 and SA2 are up and running also calibrated with Mono; HXRSS setup was also commissioning (all motors working); All good from spectrometers (HIREX and PES).
- All fine for Imagers.
DET:
- Nothing to report.
ITDM:
- Reminder for update/service on Dcache tomorrow.
XRO:
- Couple of things that need access in XTD10 (stuck motor and a switch). Probably to be done on Tuesday morning.
- Motor/temperature issues with SRA SA1: Terminals were replaced and everything is fine.
LAS:
- Nothing to report.
UNSYS:
- Everything is fine;
- On Friday afternoon measurements with K-mono in SA1 and SA3 were done; analysis is ongoing.
SPB:
- Bring up days went fine.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Concluded bring up days. Thanks for the support.
SCS:
- Bring up day today; changed day plan due to a change with Gotthard-II that has to be fixed.
SQS:
- Nothing to report.
SXP:
- Bring up days: all good. |