Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 21 of 31  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  547   11 Sep 2024, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.09.2024General Announcement:
-  Todays the machine setup is ongoing and
from tomorrow it starts the beam delivery,
  
  450   11 Sep 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.09.2023General Announcement:
- A Cryo issue taking place in the night
Fri-SAT lead to beam not being delivered
  
  250   11 Aug 2021, 10:45 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.08.2021General Announcement:
- There was another power glitch last night.
It seems that accelerator was not affected.
  
  340   11 Jul 2022, 09:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.07.2022General Announcement:
-  User Operation Meeting will re-start on
cw30 (Friday 29.07).
  
  324   11 May 2022, 10:02 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.05.2022General Announcement:
- The accelerator is currently down. An electrical
power issue lead to a cryo failure at 08:45AM
  
  119   11 May 2020, 14:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.05.2020General Announcement:
- The proposed works on the Control network
are fully organized for this week;
  
  497   11 Mar 2024, 10:04 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.03.2024General Announcement:
- A cryo failure happened today at 09:15AM.
Machine is down and shifts for today are
  
  385   11 Jan 2023, 11:16 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.01.2023General Announcement:
- If you have a forwarded invitation for
the XO Int. meeting in your calendar, it
  
  189   11 Jan 2021, 10:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.01.2021General Announcement:
- The Interlock test light in the hutches
take place on January 13th. From tomorrow
  
  276   10 Nov 2021, 10:16 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.11.2021General Announcement:
-  
  
  364   10 Oct 2022, 10:09 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.10.2022General Announcement:
- Wajid E. reminds DOC is not working this
week but the DRC will take the calls over
  
  348   10 Aug 2022, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.08.2022General Announcement:
- Machine has restarted after the cryo failure:
SA3 is receiving photons and tuning in SA1
  
  150   11 Aug 2020, 11:01 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.08.2020General Announcement:
- Beam delivery starts this week. XO reminds
the reason to send the Beam Delivery table
  
  529   10 Jul 2024, 09:48 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.07.2024General Announcement:
- Frank Poppe asks for an available time
for a tour in experimental Hall and tunnels.
  
  520   10 Jun 2024, 10:03 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.06.2024General Announcement:
- Martin Doering presents the summer maintenance
plan: 
  
  130   10 Jun 2020, 11:12 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.06.2020General Announcement:
- Maintenance in the Tunnel Air Conditioning
is completed. No more work restrictions are
  
  417   10 May 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.05.2023General Announcement:
-  
  
  223   10 May 2021, 10:05 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.05.2021General Announcement:
- Two smoke sensors affected in SA3 triggering
fire alarm: The first one could be reset
  
  505   10 Apr 2024, 09:26 Andreas GallerGeneralInformationNotes XO Integration Meeting 10.04.2024General Announcement:


 


CTRL:


nothing to report


DA:
  
  594   10 Mar 2025, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.03.2025General Announcement:
- From the DRC side, there is nothing particular
to report.
  
ELOG V3.1.4-7c3fd00