Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 214     Entry time: 12 Apr 2021, 14:40
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 12.04.2021 
General Announcement:
-	 

CTRL:
- Broker pile-up on Friday: Alessandro S. says that was triggered by network configurations; it took time to recover situation. 
Started SA3 topics for deployment and for few tickets related to that, please get in touch with DRC or try re-starting devices.
- Deployments: 1. Fix for data loggers and timing servers. We propose to do next Monday; 2. Karabo 2.10.4 was released with few bug fixes. CTRL is in touch with 
instruments.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Found on Saturday a problem with SA3 gas attenuator. It was solved with the DOC.

XPD:
- Power increase tests ongoing this morning.
- A. Koch says two servers were not running this morning and will make contact to DRC.

DET:
- Couple of OCD calls received and fixed.

ITDM: 
- Network failure: systems are very sensitive to network failures (switch failure). Relates to replacement of devices.

XRO:
- Some SA3 cameras lost configurations (maybe related to the SA3 event during the weekend): fixed by M. Vannoni. 
- SCS/SQS teams: structure for the M6 chamber has to be fixed (motors): XRO will communicate with the instruments, to keep the motors in proper conditions.

LAS:
- PP-lasers are running. Small minor issues: 
1. SA3 problem with displaying number of pulses. Solved by CTRL by installing latest Karabo server;
2. SA2 still shows small problem with regulations/settings, spectrum started drifting. Can be fixed by OCD but ticket was created.

UNSYS:
- Nothing to report.

SPB:
- Preparing for user experiment this week.

FXE:
- Nothing to report:
- Last Friday PP-laser could not config laser pattern. Tomasz J. says the OCD laser is aware and asks to please also inform DOC/DRC in such cases as LAS can't help in 
this time. 
Monica T. confirms that one has to call the DOC and invite instruments that do not get beam to also join the Monday 13:00 DOC meetings.

MID:
- Suffered with SA2 PLC downtime - mono lost positions.
- Scan energies on the undulators will be needed on next week.
- Last week operation was smooth.

HED:
- Starting operation this week.

SCS:
- Nothing to report.

SQS:
- Spectrum of detectors - two spectras were split. This was reported to BKR and DOC.