Entry   Notes XO Integration Meeting 22.03.2023, posted by Frederik Wolff-Fabris on 22 Mar 2023, 11:00 
General Announcement:
- A. Galler reminds on the conservation parameters action from accelerator which takes place every day at 7AM to recover conditions from day before or
prevent possible degradation of conditions. 
Entry   Notes XO Integration Meeting 20.03.2023, posted by Frederik Wolff-Fabris on 20 Mar 2023, 09:43 
General Announcement:
- An e-mail was sent to xo-info list about the pressurized air that is being serviced at XHEXP1. Some vacuum valves may close and please check for components
connected to pressurized air. 
Entry   Notes XO Integration Meeting 15.03.2023, posted by Frederik Wolff-Fabris on 15 Mar 2023, 10:49 
General Announcement:
- Tobias Clever informs on electrical works needed to connect XHO to electrical grid:
1. A new transformer will be connected to the new building on 03.April (a small chance of error can produce a minor power glitch as the ones frequently
Entry   Notes XO Integration Meeting 13.03.2023, posted by Frederik Wolff-Fabris on 13 Mar 2023, 09:49 
General Announcement:
-  
Entry   Notes XO Integration Meeting 08.03.2023, posted by Frederik Wolff-Fabris on 08 Mar 2023, 09:48 
General Announcement:
-
Entry   Notes XO Integration Meeting 06.03.2023, posted by Frederik Wolff-Fabris on 06 Mar 2023, 10:06 
General Announcement:
- Operation this week consists in a Facility Development week. Many FDs are scheduled and if you plan any activity that may interfere in tunnels please
contact either XO or the PRC. 
Entry   Notes XO Integration Meeting 01.03.2023, posted by Frederik Wolff-Fabris on 01 Mar 2023, 09:41 
General Announcement:
-  
Entry   Notes XO Integration Meeting 27.02.2023, posted by Frederik Wolff-Fabris on 27 Feb 2023, 09:48 
General Announcement:

- Tobias Clever announces work in safety light installations at XHEXP1 taking place today: no disturbances shall happen and therefore no need to be alarmed.
Entry   Notes XO Integration Meeting 22.02.2023, posted by Frederik Wolff-Fabris on 22 Feb 2023, 09:44 
General Announcement:
- Situation of He gas: currently it is a bit more relaxed than last year but it is still hard to make predictions of He availability in a month or so.
Please contact XO in case you have plans to use He 
Entry   Notes XO Integration Meeting 20.02.2023, posted by Frederik Wolff-Fabris on 20 Feb 2023, 11:05 
General Announcement:
- Accesses to XTD10 and XTD4 are happening this morning. The South branch sees continuation with beam activities and preparation for this week of operation.
Entry   Notes XO Integration Meeting 15.02.2023, posted by Frederik Wolff-Fabris on 15 Feb 2023, 10:14 
General Announcement:
-  
Entry   Notes XO Integration Meeting 13.02.2023, posted by Frederik Wolff-Fabris on 13 Feb 2023, 10:05 
General Announcement:
- Accelerator downtime on Saturday of 5-6 hours due to a matching capacitor located at the GUN. Work to find the problem and exchange cause this delay
and it was the first of this kind since 2016.
Entry   Notes XO Integration Meeting 08.02.2023, posted by Frederik Wolff-Fabris on 08 Feb 2023, 10:25 
General Announcement:
- When questions or issues with operations or beam parameters appears, please contact the PRC. The Karabo main scenes are changed and the PRC phone can
be directly found at them.
Entry   Notes XO Integration Meeting 06.02.2022, posted by Frederik Wolff-Fabris on 06 Feb 2023, 12:48 
General Announcement:
- A. Galler shows at the TTFinfo schedule where to find information for operation calendars. 
- A. Silenzi inform that the Jour-Fixe takes place and instruments shall be present to inform on needed requests to DRC/DOC.
Entry   Notes XO Integration Meeting 01.02.2023, posted by Frederik Wolff-Fabris on 01 Feb 2023, 10:56 
General Announcement:
- A. Galler reminds instruments to use the Operation-2023 e-log for daily reports.
Entry   Notes XO Integration Meeting 30.01.2023, posted by Frederik Wolff-Fabris on 30 Jan 2023, 09:49 
General Announcement:
-  
Entry   Notes XO Integration Meeting 25.01.2022, posted by Frederik Wolff-Fabris on 25 Jan 2023, 11:01 
General Announcement:
-  As PRC, Raul V. thanks to CTRL and EEE for the work with the SEPS yesterday.
Entry   Notes XO Integration Meeting 23.01.2023, posted by Frederik Wolff-Fabris on 23 Jan 2023, 10:01 
General Announcement:
- As PRC Jan G. says machine was tuned at 7keV for SA1 and SA2 and 700eV for SA3 with good performance. SASE tuning proceeded as planned with few issues
blocking EPS. 
Entry   Notes XO Integration Meeting 18.01.2023, posted by Frederik Wolff-Fabris on 18 Jan 2023, 11:37 
General Announcement:
- The 5Hz tests were successfully completed. Contrary to the original schedule all tests (pure and hybrid) were finished yesterday already. 
From now on the rep rate is set back to 10Hz. If you were affected during the tests please contact XO. 
Entry   Notes XO Integration Meeting 16.01.2023, posted by Frederik Wolff-Fabris on 16 Jan 2023, 09:54 
General Announcement:
- Tomorrow and Wednesday the 5Hz test take place; Wednesday as the pure 5Hz operation and on Wednesday there is the hybrid test. Every second pulse will
not see any train.