Group Selection Page HELP Controls Group ITDM DET Vacuum WP78 FXE SPB HED SQS SXP Sample Environment PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF MigratedByGroup
SCS Photon Commissioning Team XRO DOC WP74 MID XO_mig XO_Operation SQS Migrated2Zulip
Technical integration and coordination
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 450     Entry time: 11 Sep 2023, 09:47
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 11.09.2023 
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of motor position. 
In parallel motors 3 and 4 were exchanged as preventive measure during this downtime. Cryo OK came back on Sunday afternoon and efforts are focusing in bringing machine up for cw37.

CTRL:
- Pulse on demand for FXE (main scene) will be updated today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Change middle layer for the bunch patter at SA1 for fixing today.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Between Synchronization issue and cryo failure only a total of 6-7hs of data were collected.

SCS:
- Beamtime affected by cryo failure.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
ELOG V3.1.4-7c3fd00