Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 439     Entry time: 02 Aug 2023, 09:27
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 31.07.2023 

CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
    - not present
EEE:
    - nothing to be reported

VAC
    - nothing major to report
XPD:
    - part of slownwss in SA3 response team with CTRL

DET:
    - nothinbg major, and despite beam qualityu some calibration data could be taken
iTDM:
    - wil investagete BSASLER 2 issues

XRO:
    - nothing major
LAS:
    - SA1 AMPHOS service finsihed
    - NOPAs are being brought up

    SA3:
        - spurious switch off of seeder over the weekend, but could be brought up
        - comment on LASERMET 
UNSYS:
    - last week issue with cel9 SA3, undulator was not moving but isue solved

PRC:
    - beam was not super performing but some instruent tuning tasks could be done
    - SXP wanring light was broken and repaired on Sat
    - pointing difference between SQS and SCS leads to delays in tuning by the machine
        - the beam should be on the crosshair, and if that needed to be changed XPD can do that easily.
    - SA1 FEL imager stalled on Sunday -->

SPB/SFX:
    - beam could be used over the weekend, but only calibration constants could be taken or AGIPD

FXE:
    - nothing to report

MID:
    - beam was used and to a major fraction this was succesful

HED:
    - the planned program could be done

SCS:
    - nothing to report
SQS:
    - 
SXP:
    - PPLASER couldn't be used