| Technical integration and coordination | 
| 
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther | Not logged in |  |  | 
|
| 
| Message ID: 452
    Entry time: 18 Sep 2023, 10:01 |  | | Author: | Frederik Wolff-Fabris |  | Location: | General |  | Severity: | Information |  | Subject: | Notes XO Integration Meeting 18.09.2023 | 
 |  | 
| General Announcement:
- Differently from standard Mondays, today is a beam delivery day. The machine tuning day for cw38 takes place on Wednesday.
CTRL:
- Nothing to report.
DA:
- Quiet OCD weekend with two calls.
EEE:
- Nothing to report.
VAC:
- Friday afternoon SPB found pressure increase at SA1 solid attenuator which triggered vacuum signal. Investigation showed a bellow of one attenuator arm (arm 5; 1.2mm diamond) leaking and organized tunnel 
access;
- VAC will discuss with XRO how to monitor possible damage and possibly modify middle-layer device.  
XPD:
- Involved on Friday with XGM triggering alarm due to vacuum issue in XTD2.
DET:
- Nothing to report.
ITDM: 
- Nothing to report.
XRO:
- Nothing to add to the solid attenuator issue.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Not present.
FXE:
- Preparing for beamtime.
MID:
- Nothing to report.
HED:
- Troubles with sample stages being addressed with EEE.
SCS:
- Not present.
SQS:
- Not present.
SXP:
- Not present. |