Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 440     Entry time: 02 Aug 2023, 10:12
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 02.08.2023 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be handled to the instruments on Thursday morning, as 
planned.
- MID HED asked on use of HXRSS this week/next week. To be discussed at the daily Ops meeting today.

CTRL:
- Investigating the MOV loop in SA3 watchdog. 

DA:
- Nothing to report.

EEE:
- Routine checks in rack for instruments (currents for ground lines). One rack presented an issue and today there is a plan to disconnect the wrong wiring line and a second power will be installed. 
No impact shall be seen on motors using 40V at SQS.

VAC:
- Nothing to report.

XPD:
- If HED or MID goes to use seeding then N. Kujala has to setup the Hirex.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Progress in SA1 PP-L going well.

UNSYS:
- Error in gap of SA1 cell 10 undulator. It seems to be fine now.

SPB:
- Preparing for the shifts from tomorrow.

FXE:
- Nothing to report.

MID:
- Will discuss with HED on the using of beam for next 2-3 weeks.

HED:
- Nothing to add.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.