Message ID: 455     Entry time: 27 Sep 2023, 10:30
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 27.09.2023 
General Announcement:
- The Winter Maintenance Task list will be sent to all groups in the course of today. Next Wednesday 04.10 Martin Doering will make a quick presentation on the list itself and take questions. 
Two minor upgrades are done on it: 1. Location places are not divided in up to 3 sub-sections/levels; 2. Services needed and blocked are now condensed in two columns with color code related to the chosen 
service.  
The deadline for submission is October 20th.

CTRL:
- Nothing to report.

DA:
- No relevant updates.

EEE:
- Continued with work recovering systems after power cut.
- Patrick G. points that a clear information on the infrastructure of e.g. power, water, has to be made available to groups. 

VAC:
- Not present.

XPD:
- Nothing to report.
- As last PRC, J. Gruenert adds that to protect CRLs in SA1 a watchdog is being tested. F. Wolff-Fabris adds that XO will discuss it with instruments.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. says that the test of the SA1 CRL watchdog was done yesterday night; some bugs were found and a fix needed to be done. Watchdog is in principle ready but should be still tested. However, it is 
not yet a fail proof device.
- Steffen H. points that safety relevant devices that are not fail proof shall not be deployed. In addition, for longer use: one may be worthwhile to implement a dedicated device.
- XO states that the tested watchdog is not going to be placed in operation now.

LAS:
- Not present.

UNSYS:
- All fine.

SPB:
- Issue with PP-laser affected preparations.

FXE:
- Issues with AMPHOS shutter were fixed yesterday and now it runs properly.
- Progress was done with night work.

MID:
- AGIPD detector issue is in DET hands.

HED:
- Nothing to report.

SCS:
- Pointing had issues (drift) being root cause for instabilities last night. Right now beam performance looks better than the last night, after BKR intervention.

SQS:
- All good.

SXP:
- Not present.