ID Date Author Locationdown Severity Subject Text Attachments
  314   04 Jul 2017, 11:47 NEREA JARDONXTD2InformationMotion loopIt will be replaced today around 1pm.Therefore
Motion loop will be broken from this rack
position.
  
  315   04 Jul 2017, 14:07 NEREA JARDONXTD2InformationMotion loopThe encoder terminal in rack 1.5 has been
replaced.

  
  324   10 Jul 2017, 14:35 Wolfgang FreundXTD2InformationK-Mono controlDuring the first K-Mono test with Karabo
on Friday the first goniometer THETA1 (Elmo
controller) moved beyond the CW limit switch
  
  435   14 Dec 2017, 09:12 Lewis BatchelorXTD2InformationFXE Collimating CRLThe LENS_3X limit switch (switched when
driving towards the chamber center) is broken
and must be replaced, hence further work
  
  452   17 Jan 2018, 15:55 Bruno FernandesXTD2InformationRack 1.2 Timing UpdateDear all, 

following up from the message #449, the
MicroTCA Crate in rack 1.2 has been rebooted.
  
  223   11 May 2017, 18:26 Harald SinnXTD10InformationXTD10 not open on Monday Dear all, 
contrary to the rumor that I spread
last Tuesday in the PBS meeting, the magnet
  
  362   17 Aug 2017, 07:59 Krzysztof WronaXTD10InformationOffice network in XTD10Dear All,

In XTD10 there are now office network
ports available in each rack. These can be
  
  408   26 Oct 2017, 17:34 Tobias HaasXTD10InformationXTD10 closed and interlockedThe SASE3 tunnel XTD10 was searched by
Janni and her team and interlocked about
one hour ago.
  
  445   10 Jan 2018, 17:35 Bruno FernandesXTD10InformationMicroTCA in rack 3.4/XTD10The MicroTCA crate used in rack 3.4 (XTD10)
has been replaced. The system is up and running.
Timing information is properly distributed
  
  462   29 Jan 2018, 10:32 Martin DommachXTD10Informationclosing of XTD10 shifted to WednesdayDear all,

the closing of the XTD10 tunnel
is shifted to Wednesday (January 31st.) at
  
  516   25 Apr 2018, 11:42 Marijan StuparXTD10InformationSASE3 MOV1 loop updateI will update the SASE3 MOV1 loop in 30
minutes. Please let me know if you would
like me to postpone the update.
  
  554   28 Aug 2018, 11:19 Alessandro SilenziXTD10InformationSASE3 loops will restarted at 11:30This announcement is to notify you that
the intervention planned to configure the
interlocks as read-only will be carried
  
  555   28 Aug 2018, 11:36 Alessandro SilenziXTD10InformationRe: SASE3 loops will restarted at 11:30 




  
  68   10 Mar 2017, 11:18 Tobias HaasXHEXPInformationInstrument Component Priority List update after SASE1 Readiness Meeting   170310_Instrument_Components-Priority-list.xlsx 
  186   28 Apr 2017, 08:25 Adriano ViolanteXHEXPInformationFertigmeldung phase II cables SPB Optics Hutch D.02 and SPB laser hutch D.13 ACTEMIUM has delivered the handover
document for the phase II cables installed
in D,02 and D.13. The beckhoff crates can
  
  344   26 Jul 2017, 10:35 Adriano ViolanteXHEXPInformationStatus after 9.30 MeetingGeneral


Today the machine is being
prepared to lase with 30 bunches in order
  
  345   26 Jul 2017, 14:10 Bernard BaranasicXHEXPInformationSPB - Loop 5 is back onlineSPB Loop 5 is back online:

- but without crate BKF00095-SPB_IRU_CHL
(there is missmatch of hardware and documentation
  
  347   27 Jul 2017, 15:42 Eric BoydXHEXPInformationRestricted areas Durring Radiation Measurements of SASE 1, Friday 28.07No radiation measurements have taken place
today (27.07) due to insufficent energy of
the machine. We think we can achive the desired
 Restricted_areas_for_measurments.pptx 
  348   28 Jul 2017, 11:10 Eric BoydXHEXPInformationNo Restricted Areas for Radiation CommissioningDesired parameters where reached for radiation
measurments of the SPB OPT and SPB EXP hutches.
Radiaiton could not be detected inside the
  
  353   03 Aug 2017, 10:52 Eric BoydXHEXPInformationNo Radiation Measurements in SASE 1 This weekDo to repairs that need to be made with
the cold compressor. We will be unable to
perform Radiation Hutch Commissioning for
  