  177   26 Apr 2017, 18:06 NEREA JARDONGeneralInformationMotion loop

Dear all,

I will do an update into the Motion loop. Would take only few minutes and the PLC will be running again.

Thank you and sorry

  176   26 Apr 2017, 17:48 Tobias HaasGeneralInformationAccess XTD2 tomorrow

I added the requests that I was made aware of to the list of access requests for tomorrow. While the interlock in XTD2 will be broken and hence the tunnel is accessible without special procedures, please note the followoing

  • Please make sure your request in in the DESY table of access requests 
  • You have valid access permissions and two (!) dosimeters, one from XFEL one from DESY

 

 

  175   26 Apr 2017, 12:58 Adriano ViolanteGeneralInformationXSDU2 access

 The XSDU2  area will be open (as XTD2) tomorrow between 9 ans 12. To register the access, please send also in this case a mail to T.Haas.

  174   26 Apr 2017, 11:55 Adriano ViolanteGeneralInformationStatus and Plans after the 9:30 meeting

 

XTDs Info:

Tunnel XTD2 will be accessible this Thursday (TUNNEL OPEN, NO ZZ), 27.04. between 9 and 12. Dosimeter and General radiation training required. Access requests should go to T.Haas.

XTD10 will be closed starting from this Thursday, 27.04. at 12:00

Provided that the authorities give the "go ahead", DESY plans to put beam in XTD2 on Thursday evening.

Access to XSDU2 being clarified - separate entry will be posted.

Karabo:

  • System running  but performance of the GUI still sluggish - CAS was not able to reproduce the problem, still under investigation
  • Second server has been set up as workaround.
  • In parallel experts are working on a definitive solution
  • Deployment today on a new beckhoff device for the decodification of PLC and interlock error messages. 

Vacuum:

  • Systematic tests of ion pumps ongoing. in XTD 9 two controllers/beckhoff terminal for pumps were wrongly connected (exchanged). To reconnect the controllers in the right orders the loop has to be interrupted. This will be done after the vacuum test on the XGM is done.

PBLM/Motion Loop: 

  • There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.
  • ASilenzi will discuss offilen with Natalia the acceptance test definition for PBLM
  • List of errors and relative solution concerning ELMO absolute encoder implementation being worked out by AE/CAS

SPB Tunnel components

  • Error message fore the Renishaw encoders is coming from wrond specifics of the interpolator between encoder and input terminal. This is due to wrong datasheet provided by the company. This is not a problem for reading of the encoders and their reliability. Error signal is currently ingnored
  • The same problem also affects FXE components
  • The cameras operated at 1Hz deliver delayed images. 1/3 Hz operation (almost live mode) is OK - probably related to GUI memory issues

FXE

  • Encoders of Loop1 have the same error message as SPB - the encoder positions are reliable - local components test can go on (e.g. OGT1)
  • Encoders of loop2 are not powered - AE to investigate today

 

Tasks for today:

  • XGM vacuum test and solution implementation of pump restart in Karabo
  • GUI server resource problem ongoing
  • Deployment of a beckhoff device for the decodification of the error messages.
  • Find a solution for the Renishaw encoder problem SPB Tunnel/ FXE Loop1
  • Investigation of the FXE Loop2 encoders power
  • Continue testing of ion pumps in XTD9
  • Vacuum signal alarms to be checked by AE,Harlad, Janni
  • Implement and test the CRLs in XTD2 in the Beckhof loop for test.

Tasks for tomorrow:

  • Vacuum signal alarms to be checked by AE,Harlad, Janni
  • Implement and test the CRLs in XTD2 in the Beckhof loop for test.
  • Checking of the absober for first lasing (inc. filter chamber). 
  173   26 Apr 2017, 11:44 NEREA JARDONGeneralInformationMotion loop

Dear all,

I will do an update of the motion loop so the PBLM could be tested. I will do it know and the PLC will be again available in few minutes.

Thank you!

  172   26 Apr 2017, 10:51 Jan GrünertXTD2ProblemkaraboGUI issues - during cycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9
Problems described in detail below (this entire procedure takes way too much of our time, effectively still nearly 2 hours!):

Nerea/AE requested yesterday afternoon to shutdown and restart the SASE1 VAC PLC loop once again. We start today morning (wednesday) at 8h30. 
8h30
karabo is not showing status of all devices, see three screenshots (attached). karabo-GUI issue.
These devices have to be shutdown and reinstantiated to show a status and to operate them. 
Several valves and gauges and scroll pumps affected both in XGM of XTD2 and XTD9. 
 
9h00 finally I can close all four vatterfly valves 
 
9h15 Nerea shuts down and restarts the SASE1 VAC PLC loop 
 
9h25 still waiting for karabo to reconnect to Beckhoff PLC (I cannot do anything in karabo, and 
 no current status updates of anything) 
 
9h40 SPB_XTD9_XGM scene has loaded (seems like at least). I start the reactivation procedure (switch 
 on scroll, open valves etc.). Need to reinstantiate several devices. 
 
10h00 SPB_XTD9_XGM: reinstantiate both turbo pumps, CRemotePriority ON, COn, CPump (if CRemotePriority 
 not visible, again reinstantiate) 
      READ ADriveCurrent, ARPMIn several times, both should change from time to time, don't 
 worry about "0" every second read time 
10h05 SA1_XTD2_XGM: reinstantiate both turbo pumps, StartPumpingStation 
      READ ADriveCurrent, ARPMIn several times, both should change from time to time, don't 
 worry about "0" every second read time 
10h10 READ the actual value of the gauges in configurator (not to trust value shown in scene) 
10h15 observe DOOCS RVC300 UHV pressures, open vatterfly valves 
 
10h20 end of intervention 
Attachment 1: 45.png
45.png
Attachment 2: 49.png
49.png
Attachment 3: 10.png
10.png
  171   26 Apr 2017, 09:14 NEREA JARDONGeneralInformationMotion and Vacuum

Vacuum is running again and Motion also, yesterday I forgot to update you about the Motion PLC.

Sorry and best regards,

  170   26 Apr 2017, 09:10 NEREA JARDONGeneralInformationVacuum Loop

Dear all,

We need to update the Vacuum loop in order to correct and add some configuration to the interlock conditions.

It would be running in few minutes again.

Thank you!

  169   25 Apr 2017, 14:20 NEREA JARDONGeneralInformationMotion loop

Dear all,

We have to make some changes again into the Motion loop. Therefore I will do an update at 14.45h.

I will keep you inform when it is running again.

Thanks!

  168   25 Apr 2017, 13:49 Raúl Villanueva-GuerreroXTD9InformationXTD9 Complete Gas Section (DPS-XGM-DPS) Isolation Interlock tested - Not Working (yet)

 After some minor issues, the first test has been done today and the interlock wasn´t triggered despite the conditions were met (also visible in Karabo).

 

This requires intervention and revision from AE

 

The next try-out should be done as soon as possible during this week.

 

Regards.

 

Raúl, Benoit and Valerii

 

 

 

  167   25 Apr 2017, 10:51 NEREA JARDONGeneralInformationMotion loop

Dear all.

Motion loop is running again.

Thank you

  166   25 Apr 2017, 10:49 Adriano ViolanteGeneralInformationStatus and Plans after the 9:30 meeting

XTDs Info:

Tunnel XTD2 will be accessible this Thursday, 27.04. between 9 and 12. Dosimeter and General radiation training required. Access requests should go to T.Haas.

XTD10 will be closed starting from this Thursday, 27.04. at 12:00

Provided that the authorities give the "go ahead", DESY plans to put beam in XTD2 on Thursday's evening.

 

Karabo:

  • System running  but performance of the GUI still sluggish
  • There appears to be a resource leak. Second server will be set up tomorrow as workaround. Experts are working on it.
  • In parallel experts are working on a definitive solution
  • Deployment today on a new beckhoff device for the decodification of PLC error messages.

Vacuum:

  • Systematic tests of ion pumps started again

PBLM/Motion Loop: 

  • There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.
  • ASilenzi will ask Natalia for acceptance test definition for PBLM
  • Motion loop will be down until 10:30 for update. An entry will be written when the loop is again up. 

SPB Tunnel components

  • The Renishaw encoders can be read and positions are reliable. An error message is coming from the encoder and is probably due to a wrong voltage level delivered to the encoder. The encoders can be operated in this condition.
  • T. Freyermuth is in contact with the encoder company tu understand the problem and work on a fix
  • The same problem also affects FXE components
  • The cameras operated at 1Hz deliver delayed images. 1/3 Hz operation (almost live mode) is OK - probably related to GUI memory issues

FXE

  • Encoders of Loop1 have the same error message as SPB - the encoder positions are reliable - local components test can go on (e.g. OGT1)
  • Encoders of loop2 are not powered - AE to investigate

 

Tasks for today:

  • Identify a fix/workaround for the GUI server resource problem
  • Deployment of a beckhoff device for the decodification of the error messages.
  • Find a solution for the Renishaw encoder problem SPB Tunnel/ FXE Loop1
  • Investigation of the FXE Loop2 encoders power
  • Continue testing of ion pumps in XTD9
  • Test of gas section interlock in XTD9

Tasks for tomorrow:

  • Setup of the second server for karabo GUI
  165   24 Apr 2017, 11:08 Tobias HaasGeneralInformationStatus and Plans after 09:30 meeting

 

Tunnels XTD2 and XTD4 are closed, XTD9/10 remain open

Karabo:

  • Bad crash of GUI server occured on Friday.
  • System running over the weekend but performance of the GUI was sluggish
  • There appears to be a resource leak. Experts are working on it.
  • Fix is urgently needed for continued testing

Vacuum:

  • Systematic tests of ion pumps start again since V. Bondar is back
  • Fix for the interlock of the gas section in XTD9 to be deployed today.
  • Gas system tests to be done starting tomorrow

PBLM/Motion Loop: 

  • There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.

SPB Tunnel components

  • The Renishaw encoders can not be read out via the PLC
  • The problem appears to be that the signal level is not TTL. 
  • T. Freyermuth is working on a fix
  • Work can continue once the encoder problem is solved
  • The same problem also affects FXE components
FXE
  • FXE team not represented

 

Tasks for today:

  • Re-deploy vacuum loop for the tests of the gas section tomorrow
  • Identify a fix/workaround for the GUI server resource problem
  • Find a solution for the Renishaw encoder problem
  • Restart testing of ion pumps in XTD9

Tasks for tomorrow:

  • Test of gas section interlock

Other topics

  • J. Grünert requests to put the XGM in XTD10 under PLC/Karabo control
  • This would require extensive work by several groups (ITDM, AE, CAS) and cannot be done at the moment in view of established priorities

 

  164   21 Apr 2017, 17:22 Sandor BrockhauserGeneralInformationCAS OCD April 22-23

In case of any problems, please, call the CAS personnel on 9-6443, 9-5630, or 9-6840.

Have a nice week-end, Sandor

  163   21 Apr 2017, 15:30 Tobias FreyermuthXTD9FeedbackSASE EPS RACK 1.14 connected

The EPS-loop is now complete again.

The interface from EPS to MPS is working now. One broken wire in the cable between EPS and MPS was found. We are using now other pairs for the signals "SA1_SYS_EPS2MPS/DCTRL/MODE1", "SA1_SYS_EPS2MPS/DCTRL/MODES" and "SA1_SYS_EPS2MPS/DCTRL/MODEM".

Cheers,

    Tobias

  162   21 Apr 2017, 15:26 Jan GrünertXTD2InformationCycling of PLC loop (shutdown and restart) - effects on XGM XTD2 and XTD9
Together with Nerea and Wajid and Alessandro

  • 10:00 closed vatterflies at XTD9 and XTD2 from Karabo
  • Florian is at XTD9 next to the XGM
XTD9: 
  • LOOP re-cycle
  • All valve closed and scroll off (turbos in unknown state; Florian in tunnel sees 990 Hz)
  • Scroll and turbos switched ON
  • Angle valve opened over Karabo
  • Problem to open gate-valve
  • Set Karabo offline
  • Nerea switched turbos at XTD2 ON (XTD9 were on) by PLC
  • Karabo is reconnected to PLC (brought online again)
XTD2: (with Alessandro) 
  • Scene optimized: Turbo speed, new prevac display, and preliminary scroll icon
  • Open KF angle and gate valve (follow "XGM vacuum incident procedure")
XTD9: (with Alssandro) 
  • Scene optimized: Turbo speed, new prevac display, and scroll icon
  • Open angle and gate valve (follow "XGM vacuum incident procedure")
New project created "SASE1-XGM" which contains both XTD2 and XTD9 XGM vacuum projects, thus scenes from both can be opened from one GUI simultaneously.

11:55 XTD9 vatterflies OPEN 
12:00 XTD2 vatterflies OPEN  
      (V10120V could only be opened after shutdown of device and re initialization) 
 
Maybe upper pressure probes need new calibration -> Check formula 
Prevacuum pressures: 
  • XTD9: 6.4E-4 mbar (G11081P)
  • XTD2: 2.5E-2 mbar (G10100P) and 1.2E-3 mbar (G10101P)

Summary : both XGMs in XTD2 and XTD9 are now back in normal pumping operation, and they were never exposed to more than a few 10E-6mbar. Good. But it took 2 hours and 4 experts.

  161   21 Apr 2017, 15:22 NEREA JARDONGeneralInformationOCD

Dear all,

The service of On-call Duty will be available from AE group during weekend in this number: 6442

Please make a post with the OCD numbers from CAS, WP74 and WP73.

Thank you and bests.

  160   21 Apr 2017, 14:36 Tobias FreyermuthXTD9InformationSASE EPS RACK 1.14 disconnect

We have to disconnect the EPS crate in RACK 1.14 in order to check the interface to the MPS.

I will keep you updated

  159   21 Apr 2017, 13:54 Jan TolkiehnGeneralProblemAccess to control PC

exflplcgwSA1 seems not reachable. This inhibits support for the PLC systems.

  158   21 Apr 2017, 13:35 Raúl Villanueva-GuerreroXTD9ProblemFAILED - Interlock test of the whole gas section in XTD9 - NOT SUCCESSFUL

Raúl Villanueva-Guerrero wrote:

Raúl Villanueva-Guerrero wrote:

 Due to problems and lack of support of CAS for accessing the devices in XTD9 tunnel through KARABO we couldn´t run the test. The system has been returned to manual operation and will remain like that until next notice.

 

 

As soon we received the request we worked on that one.  After analysing the issue proper response was sent.

​​​----- Forwarded Message -----

​​​​From: "Wajid Ehsan" <wajid.ehsan@xfel.eu>

To: "Raul Villanueva" <raul.villanueva@xfel.eu>

Cc: "Alessandro Silenzi" <alessandro.silenzi@xfel.eu>, "Nerea Jardon" <nerea.jardon@xfel.eu>

Sent: Friday, 21 April, 2017 12:56:14

Subject: Re: Karabo problems in XTD9 - Urgent!


​​​​​Hi Rahul,

we checked all the devices that are in error. The issue is realted with hardware.

Error description is mentioned below:

0x1001 FlagCtrl Error flag from controller

Regards,


Wajid Ehsan 

 

 

Here is the list of devices that are in error:
 

SA1_XTD9_VAC/VALVE/V11090A  Error 3 -> valve stayed between open and closed for too long time (3s set on the valve) (the reset command is sent to the PLC and it cannot clear the error)
SA1_XTD9_VAC/VALVE/V11100A  Error 3 -> valve stayed between open and closed for too long time (3s set on the valve)
SA1_XTD9_VAC/VALVE/V11110A  Error 3 -> valve stayed between open and closed for too long time (3s set on the valve)
SA1_XTD9_VAC/TPUMP/P11220T Error 0x1001 -> err_FlagCtrl -> Error flag from controller (need manual reset on the controller) after reset error is now cleared.
SA1_XTD9_VAC/TPUMP/P11280T Error 0x1001 -> err_FlagCtrl -> Error flag from controller (need manual reset on the controller) after reset error is now cleared.
SA1_XTD9_VAC/VALVE/V11210G Error 0x10001 ->  _err_InterlockDevNotFound  -> Interlock device not found. (the valves depends from a SA1_XTD9_VAC/SWITCH/DP_XGM_DP_ERROR which does not exist. a SA1_XTD9_VAC/SWITCH/DP_XGM_DP_OK is present in the list though, likely a PLC configuration error).
SA1_XTD9_VAC/VALVE/V11220G Error 0x10001 -> _err_InterlockDevNotFound -> Interlock device not found.
 

For the last 2 errors, which are the only one that have a clear PLC problem, I created a bug report in the redmine project of AE.
https://in.xfel.eu/redmine/issues/16510

Cheers

Alessandro Silenzi