ID |
Date |
Author |
Location |
Severity |
Subject |
17
|
09 Dec 2016, 15:31 |
Frederike Wittmaack | General | Information | Meeting Minutes 09 Dec 2016 |
http://tinyurl.com/gqykf7z |
16
|
07 Dec 2016, 17:09 |
Frederike Wittmaack | General | Information | Meeting Minutes 02 Dec 2016 |
http://tinyurl.com/hzq7ats |
15
|
02 Dec 2016, 11:47 |
Frederike Wittmaack | General | Information | Remote access to control network form |
http://tinyurl.com/jskzj2h
|
14
|
02 Dec 2016, 11:46 |
Frederike Wittmaack | General | Information | Meeting Minutes 25 Nov 2016 |
http://tinyurl.com/jydty26
|
13
|
02 Dec 2016, 11:43 |
Sabine Cunis | XTD2 | Information | new components list |
please find the new (extended) components list under the old link given in the minutes http://tinyurl.com/zn7otsa ,
and check whether all components are included and charakterized by the correct data.
|
12
|
24 Nov 2016, 11:38 |
Frederike Wittmaack | General | Information | Meeting Minutes 17 Nov 2016 |
http://tinyurl.com/hxaxdm9 |
11
|
14 Nov 2016, 14:10 |
Frederike Wittmaack | General | Information | Meeting Minutes 11 Nov 2016 |
http://tinyurl.com/juhjcbf |
10
|
11 Nov 2016, 15:43 |
Tobias Haas | General | Information | Mandate for the Extension of the Vacuum Controls Commissioning Task Force |
The Vacuum Controls Commissioning Task Force initially helped to get the vacuum components extending from the gate valve at 2678 m to the gate valve at 2730 m in XTD2. This comprised the valves and pumps and the associated vacuum interlock logic. The necessary components were all installed and locally tested. As the next step the PLC firmware for the control of these devices was generated including the interlock logic. Finally the system was connected to version 1.47 of Karabo, which was able to monitor and control all components. A live demonstration is currently still outstanding.
As the next step the vacuum section considered should be extended upstream to include all components up to the gate valve at 2630m. In addition to vacuum components this should include the installed photon beam line components. The goal is to include all these systems into one continuous vacuum, commission all systems locally, generate the PLC firmware, implement the required vacuum interlocks, monitor the state of the system remotely via the PLC command line interface and eventually connect to Karabo and monitor and control the system via Karabo remotely using the consolidated version 2.0. While this commissioning effort is going on, development should occur on three days during the week (Mo-Wed) while the system should be operated continuously during the remaining time, thus also testing long-term stability. This should be achieved by the end of 2016. |
9
|
09 Nov 2016, 15:36 |
Tobias Haas | General | Information | Update of Component list |
I have included the status columns provided by Alessandro and Sandor in the component list. Please find it in the usual location here: http://tinyurl.com/zn7otsa |
Attachment 1: elog.tiff
|
8
|
07 Nov 2016, 19:15 |
Alessandro Silenzi | XTD2 | Information | Karabo Installation back to normal |
Karabo to PLC communication has been tested successfully in the SA1 Vacuum installation.
in attachment:
OK.png -> Initial Status, all OK
interlocked.png -> pump P10300I is turned off -> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false
afteron.png -> pump P10300I is turned on again but-> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false
backToNormal.png -> Like initial status but valves stay closed
|
Attachment 1: OK.png
|
|
Attachment 2: interlocked.png
|
|
Attachment 3: backToNormal.png
|
|
Attachment 4: afteron.png
|
|
7
|
04 Nov 2016, 18:08 |
Alessandro Silenzi | General | Information | BeckhoffDevices back to responsive |
I reproduced the behaviour of the PLC on beckhoffSim. This reproduces the same behaviour seen in the tunnel devices (devices hang).
Implemented the fix and verified the correct behaviour with beckhoffSim.
Fixes will be verified next Monday with the tunnel system.
Have a nice weekend
Alessandro
ps: For future reference:
beckhoffSim tags/1.1.0-1.4 (implements the recent plc behaviour (framework tag N/A Could not find tobias))
beckhoffDevices tags/2.0.1-1.4 hangs
beckhoffDevices tags/2.0.2-1.4 does not
|
6
|
04 Nov 2016, 14:22 |
Frederike Wittmaack | General | Information | Minutes - Meeting November 4, 2016 |
http://tinyurl.com/jbog6tz |
5
|
04 Nov 2016, 08:03 |
Frederike Wittmaack | General | Information | Minutes of last weeks meeting (Oct 28, 2016) |
http://tinyurl.com/jy5rsbx |
4
|
03 Nov 2016, 17:00 |
Sabine Cunis | XTD2 | Information | overview of required racks |
just for reference ... here are pictures and schematics of the racks which are involved in the current commissioning. |
Attachment 1: VCCT_Rack_1p06_b.jpg
|
|
Attachment 2: VCCT_Rack_1p07_b.jpg
|
|
3
|
03 Nov 2016, 12:58 |
Alessandro Silenzi | XTD2 | Information | Current PLC-Karabo Conflict |
Tobias Freyermuth and me worked on the system and as of last night, we found two new issues between Karabo and the PLC interlock:
- one is a Karabo issue from the Interlock PLC interaction, the Karabo device waits for a PLC response that does not come when the PLC is interlocked (i.e. Karabo wants to open a valve but the PLC correctly refuses and ignores the command)
- one is a PLC issue, the interlock is not triggered in all cases after testing (e.g. a ion pump out of set point does not closes a gate valve closure as specified).
The first one was reproduced with the BeckhoffSim simulation. It can therefore be fixed by CAS without dependencies from AE (except for the next integration test). |
2
|
26 Oct 2016, 14:26 |
Tobias Haas | General | Information | Minutes of last week's meeting |
http://tinyurl.com/gvvv392 |
1
|
26 Oct 2016, 13:55 |
Tobias Haas | General | Information | Start of Logbook |
Dear Colleagues,
in the future we would like to use this mechanism to record and exchange information that concerns the work done within the context of this task force. Please use this generously. We shall also put a link to the minutes after each weekly meeting.
regards,
Tobias |