  132   11 Apr 2017, 13:48 Alessandro SilenziGeneralInformationScript to install the latest karaboPlease find in attachment the dowload bash
script for the latest Karabo.
if your system has a "karabo"
 download.sh 
  298   22 Jun 2017, 15:15 Tobias HaasXTD2InformationSchedule for first beam SASE1 hutchesIt was just decided to put a very low intensity
beam into the SASE1 hutches starting tomorrow
morning at 8 AM. Both instruments declared
  
  87   24 Mar 2017, 13:21 Tobias HaasGeneralInformationSchedule for PLC and Karabo Week 13 

  
  93   03 Apr 2017, 10:03 Tobias HaasGeneralInformationSchedule for PLC and Karabo 3 April after 09:30 MeetingTunnels closed today and tomorrow
- AE updates Vacuum and motion loop
in the morning
  
  94   04 Apr 2017, 11:21 Tobias HaasGeneralInformationSchedule after 09:30 Meeting Tunnel
closed today. Might re-open around 14:00
Note that that we re-convene briefly
  
  123   10 Apr 2017, 10:47 Tobias HaasGeneralInformationSchedule after 09:30 MeetingTunnel
Open.
  
  103   05 Apr 2017, 10:15 Tobias HaasGeneralInformationSchedule after 0930 MeetingTunnel
Open.
  
  22   24 Jan 2017, 08:17 Tobias HaasXTD2InformationSTATUS UPDATE: XTD2 Differential Pumping Modules running under interlock control Post on behalf of Raul
Villanueva:
  
  32   02 Feb 2017, 14:29 Richard BeanXTD9InformationSPB/SFX updates to component tableTable updated with status of SPB/SFX devices
at end of XTD9 in preparation for SASE1 readiness
meeting on 03.02.17
 Components-XTD2-9.xlsx 
  512   17 Apr 2018, 14:23 Torsten SchoenXHEXPInformationSPB emergency power off testsDear all,

 the emergency power off test
has been successfully performed in SPB.
  
  345   26 Jul 2017, 14:10 Bernard BaranasicXHEXPInformationSPB - Loop 5 is back onlineSPB Loop 5 is back online:

- but without crate BKF00095-SPB_IRU_CHL
(there is missmatch of hardware and documentation
  
  276   03 Jun 2017, 22:39 Alessandro SilenziGeneralProblemSOLVED BROKER Problem A
pile up in the BrokerQueue was detected by
  
  554   28 Aug 2018, 11:19 Alessandro SilenziXTD10InformationSASE3 loops will restarted at 11:30This announcement is to notify you that
the intervention planned to configure the
interlocks as read-only will be carried
  
  516   25 Apr 2018, 11:42 Marijan StuparXTD10InformationSASE3 MOV1 loop updateI will update the SASE3 MOV1 loop in 30
minutes. Please let me know if you would
like me to postpone the update.
  
  506   13 Apr 2018, 09:05 Torsten SchoenXHEXPInformationSASE3 E.21 and E.22 electrical power distributionchanges according to the racklist on the
electrical power distribution cabinets for
rackrooms E.21 and E.22 are done. Power supply
  
  393   29 Sep 2017, 11:03 Monica ArestéGeneralInformationSASE1/SASE3 Readiness meeting on Monday cancelled The SASE1/SASE3 Readiness meeting next
Monday is cancelled we will meet again on
Wednesday the 3rd of October.
  
  394   29 Sep 2017, 11:09 Monica ArestéGeneralInformationSASE1/SASE3 Readiness meeting on Monday cancelled Correction: We will meet again on Wednesday
the 4th of October.

  
  459   24 Jan 2018, 16:15 Bruno FernandesGeneralInformationSASE1 Timing System UpdateDear all,

the update to the SASE1 Timing
system has been perform with no problems.
  
  430   06 Dec 2017, 17:17 NEREA JARDONGeneralInformationSASE1 MOVThe Motion loop in SASE1 is totally operated
again.
  
  258   21 May 2017, 17:10 Dennis GoeriesXTD2ProblemSASE1 Imager FRDear all,
we are experiencing constantly crashes
with the photonic science camera in the SA1
  