132
|
11 Apr 2017, 13:48 |
Alessandro Silenzi | General | Information | Script to install the latest karabo |
Please find in attachment the dowload bash script for the latest Karabo.
if your system has a "karabo" directory, this script will not overwrite it, but the update will fail.
In this case, remove or rename the karabo directory.
To use it:
1. download the script in a directory of your choice.
2. open a terminal and execute it with
$ bash PATH_TO/download.sh
Where PATH_TO is the path where the download script was saved. |
Attachment 1: download.sh
|
#!/bin/bash
if [ -z ${outfilename} ]
then
outfilename=.karabo.sh
fi
echo $outfilename
git clone https://xfel.redmine:K9Sss5CmWtQ_nbx3gyt2@git.xfel.eu/gitlab/Karabo/commissioning-guidelines .temp-commissioning --depth=1
cp -f .temp-commissioning/project_generation/install.sh .install.sh
rm -fr .temp-commissioning
. .install.sh
rm ${outfilename}
rm .install.sh
|
298
|
22 Jun 2017, 15:15 |
Tobias Haas | XTD2 | Information | Schedule for first beam SASE1 hutches |
It was just decided to put a very low intensity beam into the SASE1 hutches starting tomorrow morning at 8 AM. Both instruments declared that they are ready to accept it. Due to the very low intensity no special measures need to be taken outside the hutches. SRP and D3 shall be in the experiment hall. Harald Sinn shall coordinate beam activities from the BKR. Please note that the TC and S1R meetings take place as announced. |
87
|
24 Mar 2017, 13:21 |
Tobias Haas | General | Information | Schedule for PLC and Karabo Week 13 |
Day |
Motion Loop |
Vacuum Loop |
EPS Loop |
SPB Tunnel Loop |
Karabo |
Monday |
Loop up. |
Loop up. |
Loop up |
Loop inactive |
Version update by CAS 12:00 - 18:00 |
Tuesday |
Loop up. |
Loop up. |
Loop up |
Loop inactive |
Running and no change |
Wednesday |
Loop up. |
Loop up |
Loop up |
AE brings up loop |
Running and no change |
Thursday |
Loop up |
Loop up |
Loop up |
AE brings up loop |
Running and no change |
Friday |
Loop up |
Loop up |
Loop up |
Loop up |
Running and no change |
|
93
|
03 Apr 2017, 10:03 |
Tobias Haas | General | Information | Schedule for PLC and Karabo 3 April after 09:30 Meeting |
Tunnels closed today and tomorrow
- AE updates Vacuum and motion loop in the morning
- V. Bondar, J. Eidam and H. Sinn test vacuum in the afternoon (emphasis on understanding interlock conditions)
- A. Koch tests XTD2 imagers in the afternoon
See also https://in.xfel.eu/redmine/projects/sase1/agile_board
Problems solved on Friday last week:
- Arms 2 & 4 of SRA are now moving. Apparently spindles had mechanical resistance that resulted in error condition. After moving a few times, this appears to be gone
- One of the problematic ion pumps had the serial line disabled. However, other lines
|
94
|
04 Apr 2017, 11:21 |
Tobias Haas | General | Information | Schedule after 09:30 Meeting |
Tunnel closed today. Might re-open around 14:00
Note that that we re-convene briefly at 17:00 today in MCR (Mock-up Control Room)
Vacuum Loop:
Status:
- Large number of ion pumps not responding properly (2 in XTD2, 63 in XTD9). There is the suspicion that the parameters on some ion pump controllers might be set incorrectly, such as baud rate or the bus address. The generated error code indicates a bad address.
- Test in the lab requires Ion pump controller and PCL. No setup currently readily available. Check in the tunnel required. Could take place between 1200 and 1300 in XTD2 with a ZZ. (Update: B. Racky thinks she will be done around 1400 and would prefer access after this time)
- Preparations needed to include XGM
EPS Loop:
Status:
- Temperature sensors return null value. Suspected firmware bug has been fixed and EPS loop updated by TF
- EPS to MPS interface requires testing. Should be done tomorrow
Motion Loop:
Status:
- Fixes have been applied to the MC2 lib. Tested for TECHNOSOFT driver. Should now work also for PBLMs . Tests do be done starting Wednesday
Imagers
Status:
- Camera driver for SR imager not working
- Camera driver for FEL driver working for imager in XTD2 but not for XTD9
Tasks for today:
- E. Eidam, V. Bondor, , J. Tolkiehn H. Sinn go through all ion pumps in the Silenzi list
- E. Eidam, T. Freyermuth check pump controller settings in the tunnel
- A. Koch and W. Ehsan work on Photonics Camera driver for FEL imager
Tasks for tomorrow:
- M. Planas, T. Maltezopoulos, N. Jardon, J. Eidam test XGM vacuum integration in XTD2 (not XTD9)
- N. Gerasimova, N. Gerasimova and 1 firmware expert test PBLMs in the tunnel
- T. Freyermuth tests EPS -> MPS interface
Other topics
- The two signals from MCP to EPS shall be called MCP-upstream and MCP-downstream
|
123
|
10 Apr 2017, 10:47 |
Tobias Haas | General | Information | Schedule after 09:30 Meeting |
Tunnel Open.
Mirrors:
Status:
- Both mirrors M1 & M2 installed
- Vacuum being closed in M2 today should be ready for ion pumps tomorrow
- Surveying work going on (see email by M. Schlösser below)
Vacuum Loop:
Status:
- Needs reconfig for XGM in XTD9
- Interlock tests on XGM in XTD2 should go on.
- 2 Turbopumps still have a communication problem (J. Tolkiehn is working on this)
- 6 Ion pumps in XTD9 still have communication problems (list was given by AS to JE)
- Systematic testing according to the list by J. Eidam with V. Bondar starting this afternoon
EPS Loop:
Status:
- One terminal needs to be exchanged for FEL Imager
- Description of EPS interlock still missing. It is planned to start with just one imager in for first beam commissioning
- One fiber connection from Balcony room to DESY still to be done by DESY. AFter this testing of communication should start
Motion Loop:
Status:
- Quick fix for motors not stopping was deployed on Friday. Now TF is working on a better fix to be deployed this evening
Imagers
Status:
- EPS switch on FEL imager should be checked after exchange of terminal
- Photonics camera driver still not working but not critical for tunnel closure
- Work should now concentrate on SR imager
Karabo:
Status:
- New version with TCP fix needs to be deployed. This should also be done to the local software run by users.
Tasks for today:
Note: Loop reconfiguration and updates of Karabo to be done in the morning. Testing can resume after lunch. Status updates should please be recorded in the log
- Reconfigure vacuum and motion loops (updates for XGM interlock, motors not stopping)
- Replace broken terminal in EPS loop for FEL imager
- Continue test XGM interlocks (N. Jardon, M. Planas, T. Matsopoulos)
- Go through systematic test of the vacuum components (J. Eidam, V. Bondar)
- Continue tests with PBLM in the tunnels (M. Jidda)
- Test motion system of the imagers in the tunnels (A. Koch and W. Ehsan)
- Monitor stability and responsiveness of GUI Server and Log Servers (A. Silenzi)
- Set up monitoring of temperatures and pressures overnight (A. Silenzi)
- Test communication between XFEL and DESY MPS once fiber connection from Balcony rooms to MPS is available (B. Fernandes)
Tasks for tomorrow:
- Put XGM into the vacuum interlock
- Continues testing of all interlock conditions for the vacuum
Other topics
- Surveying is going on for mirror chambers M1 and M2 in XTD2
- We need a well defined startup configuration of PLC, Karabo, Parameters, List of devices (A. Silenzi)
Email by M. Schlösser re alignment
Hi Tobias, hi Markus, Hi Winni,
Tobias, we discussed briefly the schedule for the T9 and T10 beamlines for the next few days, when we met in the tunnel yesterday.
From what i understand it is impossible to finish T10 until April 11th from the alignment and vacuum side. And probably more important, this also holds true for T9. There is at least one major problem with the alignment of the mirror chambers of T9 in XTD2, which will need some additional days to solve.
From my understanding at least the T9 beamline should be closed and aligned before putting SASE1 in operation. While it will of course be possible to send electrons down to the XSDU2 dump, it will not be possible to send photons to the experimental hall with the current state of the beamline.
Since it is not possible to work in XTD10 while the SASE1 electron beamline is in operation, i would propose to also finish this beamline before SASE1 electron startup. Since there is major work to do in XTD10 to finish the beamline, there is no hope to do the remaining work during maintenance days. Finishing the beamline would require a major shutdown of the SASE1 branch later.
Since there will be no alternative to send the beam to (e.g. SASE2) for the next year (?), it does not make sense to stop work in XTD10 now, just to continue later then, without any overall benefit for the machine.
Of course i don't have a complete overview of all the machine schedule, but from my point of view it would make more sense to finish work in the northern branch, at least to align all components and to close the vacuum system, even if that means some more weeks before the SASE1 startup.
cu
Markus |
103
|
05 Apr 2017, 10:15 |
Tobias Haas | General | Information | Schedule after 0930 Meeting |
Tunnel Open.
Vacuum Loop:
Status:
- Communication problem with Ion pump controllers is fixed after adjusting controller settings
- Loop is now down to allow inclusion of XGM
EPS Loop:
Status:
- Temperature sensors return reasonable values after EPS loop fix
- EPS to MPS interface is working but fiber to central desy interface still lacking
Motion Loop:
Status:
- Should be up for testing PBLMs and Imagers
Imagers
Status:
- Test of FEL imager ok, but hampered by occasional slow response of the system
- SR Imager needs work on the driver
Tasks for today:
- Include XGM in Vacuum loop (N. Jardon, M. Planas, T. Matsopoulos, V. Bondar)
- Test updated MC2 lib with PBLM in the tunnels (N. Gerasimova, M. Jidda)
- Work on camera driver for SR imager (A. Koch and W. Ehsan)
- Test motion system of the imagers in the tunnels (A. Koch and W. Ehsan)
- Monitor stability and responsiveness of GUI Server and Log Servers
- Set up monitoring of temperatures and pressures overnight
- Push DESY to get fiber connection to MPS (P. Gessler)
Tasks for tomorrow:
- Terminals need to be added and firmware adjustments made in motion loop (take loop down as early as possible for one hour)
- Test EPS inputs to MPS system with DESY people
- Power down crate 1.15 for grounding. Could take longer than one day
Other topics
- N. Jardon needs complete info of motor names in rack 1.18
|
22
|
24 Jan 2017, 08:17 |
Tobias Haas | XTD2 | Information | STATUS UPDATE: XTD2 Differential Pumping Modules running under interlock control |
Post on behalf of Raul Villanueva:
As we just finished the exhaustive testing and final adjustments of local
test and the interlock program for each of the turbopumps at each
Differential Pumping Sections in XTD2 Tunnel, we are happy to announce
that the system has been released and is up and running smoothly and under
control. That means that the isolation gate valves in front of each
turbopump is open and therefore the latter is pumping already the beamline
as expected during the upcoming operation phase of the facility. That also
means that WP74, after having already received the wiring documentation
from the Vacuum Group can proceed with the same protocol to keep the whole
gas section in XTD2 in a consistent fail-safe status.
With this positive news, we wish you to have a nice evening,
Regards,
Raúl, Tobias and Nerea,
|
32
|
02 Feb 2017, 14:29 |
Richard Bean | XTD9 | Information | SPB/SFX updates to component table |
Table updated with status of SPB/SFX devices at end of XTD9 in preparation for SASE1 readiness meeting on 03.02.17 |
Attachment 1: Components-XTD2-9.xlsx
|
512
|
17 Apr 2018, 14:23 |
Torsten Schoen | XHEXP | Information | SPB emergency power off tests |
Dear all,
the emergency power off test has been successfully performed in SPB.
Nobody can instantly cut the power to non hazardous racks (see racklist.xlsx managed by Ulf Brueggmann) by pushing the emergency off button anymore. The outlets in the experiment hutch do not go off. This is due to some missing cables. These will be installed in the next weeks and a new test will be planned for next shutdown.
Furthermore three racks for D.02 (SPB optics) and two racks for D.13 (SPB laser) cannot be powered off anymore by pushing the emergency off in D.09. The missing two emergency power off switching devices will be mounted in UV-XHEXP1-01-13-AV in the next shutdown. Until then the power to those five racks (D03-UH1 - D03-UH3, D13-UH1, D13-UH2) cannot be cut by emergency off buttons in D.02 or D.13. |
345
|
26 Jul 2017, 14:10 |
Bernard Baranasic | XHEXP | Information | SPB - Loop 5 is back online |
SPB Loop 5 is back online:
- but without crate BKF00095-SPB_IRU_CHL (there is missmatch of hardware and documentation (investigation is ongoin)),
- pumps: PUMP_TURBO4, PUMP_TURBO5, PUMP_TURBO8, PUMP_ROOT_1, PUMP_ROOT_2 ,PUMP_ROOT_3 and IRU_VAC/PUMP_ROOT_1 are without serial connection
Interlock is inlcuded and ready for testing.
Best Regards,
Bernard |
276
|
03 Jun 2017, 22:39 |
Alessandro Silenzi | General | Problem | SOLVED BROKER Problem |
A pile up in the BrokerQueue was detected by CAS monitoring system and
a response action from the On-Call personnel was triggered.
Regrettably, the following device servers have been shutdown and will be re-instantiated.
- Dataloggers
- alarm server
- camera servers
- Motion Loop and Vacuum Loop beckhoff servers
Sorry for the inconvenience |
554
|
28 Aug 2018, 11:19 |
Alessandro Silenzi | XTD10 | Information | SASE3 loops will restarted at 11:30 |
This announcement is to notify you that the intervention planned to configure the interlocks as read-only will be carried out at 11:30.
A following message will notify of the end of the intervention
Alessandro |
516
|
25 Apr 2018, 11:42 |
Marijan Stupar | XTD10 | Information | SASE3 MOV1 loop update |
I will update the SASE3 MOV1 loop in 30 minutes. Please let me know if you would like me to postpone the update.
Best regards,
Marijan |
506
|
13 Apr 2018, 09:05 |
Torsten Schoen | XHEXP | Information | SASE3 E.21 and E.22 electrical power distribution |
changes according to the racklist on the electrical power distribution cabinets for rackrooms E.21 and E.22 are done. Power supply should be stable now. Please note that there will be emergency power off tests prior to the final acceptance test of SASE3 electrical installations around mid of May. You will be notified about the exact time and date. |
393
|
29 Sep 2017, 11:03 |
Monica Aresté | General | Information | SASE1/SASE3 Readiness meeting on Monday cancelled |
The SASE1/SASE3 Readiness meeting next Monday is cancelled we will meet again on Wednesday the 3rd of October. |
394
|
29 Sep 2017, 11:09 |
Monica Aresté | General | Information | SASE1/SASE3 Readiness meeting on Monday cancelled |
Correction: We will meet again on Wednesday the 4th of October.
Monica Aresté wrote: |
The SASE1/SASE3 Readiness meeting next Monday is cancelled we will meet again on Wednesday the 3rd of October.
|
|
459
|
24 Jan 2018, 16:15 |
Bruno Fernandes | General | Information | SASE1 Timing System Update |
Dear all,
the update to the SASE1 Timing system has been perform with no problems. The Timing board is now running firmware 1.24.0 and the doocs server was updated to version 7.8. I also updated the MCH firmware to version 2.19
|
430
|
06 Dec 2017, 17:17 |
NEREA JARDON | General | Information | SASE1 MOV |
The Motion loop in SASE1 is totally operated again. |
258
|
21 May 2017, 17:10 |
Dennis Goeries | XTD2 | Problem | SASE1 Imager FR |
Dear all,
we are experiencing constantly crashes with the photonic science camera in the SA1 imager FR. We found now out
- If the pixel format is set to Mono16 the camera will most likely crash, go in error.
- Before instantiation the camera may show Mono16. During connection Karabo but gets a fresh update and the field in the scene switches to Mono8.
Please don't apply Mono16 again.
Best wishes, Dennis |