ID |
Date |
Author |
Location |
Severity |
Subject |
97
|
04 Apr 2017, 15:11 |
Tobias Haas | General | Information | Access to XTD2 | MPS informed me that they hit some problems and that they still need 30 mins to 1 h until we can go to XTD. |
176
|
26 Apr 2017, 17:48 |
Tobias Haas | General | Information | Access XTD2 tomorrow | I added the requests that I was made aware of to the list of access requests for tomorrow. While the interlock in XTD2 will be broken and hence the tunnel is accessible without special procedures, please note the followoing
- Please make sure your request in in the DESY table of access requests
- You have valid access permissions and two (!) dosimeters, one from XFEL one from DESY
|
120
|
07 Apr 2017, 19:13 |
wajid ehsan | XTD2 | Information | Acceptance test IMAGERS (FRIDAY 07-04-2017) |
SA1_XTD2_IMGPII45:
1) MOTOR/SCREEN(DONE)
2) Check operation of range of movement, defined by end switches (DONE)
3) Check repeatability (DONE)
4) Switch on/off LED (DONE)
5) Switch on/off camera (DONE)
6) Acquire images with a camera (DONE)
7) Hardware Trigger of camera (DONE)
8) EPS switch (DONE)
SA1_XTD2_IMGFEL:
1) Move all motors (DONE)
1.1) MOTOR/SCREEN (DONE)
1.2) MOTOR/FILTER (DONE)
3) Check operation of range of movement, defined by end switches (DONE)
3.1) END_ Switches/SCREEN (DONE)
3.2) END_Switch/FILTER (DONE)
4) Check repeatability (DONE)
5) Switch on/off LED. (DONE)
6) Switch on/off camera. (DONE)
7) Take images with a camera. (DONE)
8) Trigger of camera (DONE)
9) ESP switch (NOT WORKING, hardware issue, to be tested)
10) Braking switch_SCREEN_MOTOR (NOT WORKING, to be tested)
SA1_XTD2_IMGSR:
1) Test motors. (DONE)
1.1) Motor/Screen (DONE)
1.2) Motor/y (DONE)
1.3) Motor/ Focus (DONE)
1.4) Motor / IRIS (DONE)
2) End Switches:
2.1 Motor/Screen (DONE)
2.2 Motor/y (DONE)
3. Check repeatability(DONE)
4. Switch on/off LED (DONE)
5. Switch on/off camera (DONE)
6. Acquire images (NOT DONE, Photonic science camera device is not working but acquired images with eBus(low level driver))
7) EPS (DONE)
8) Braking switch_SCREEN_MOTOR (NOT WORKING)
|
184
|
27 Apr 2017, 15:28 |
Tobias Haas | General | Information | Accelerator plans for the next 5 days | 27/04 Th A | Beam operation to TLD 10 GeV, 1 bunches, 0.1 nC, 1 Hz; interlock set XTD2-XTD4 | 27/04 Th N | Beam operation to TLD 10 GeV, 1 bunches, 0.1 nC, 1 Hz, EOD shift | 28/04 Fr M | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 28/04 Fr A | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 28/04 Fr N | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 29/04 Sa M | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 29/04 Sa A | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 29/04 Sa N | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 30/04 Su M | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 30/04 Su A | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 30/04 Su N | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 01/05 Mo M | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 01/05 Mo A | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | 01/05 Mo N | Beam operation to T4D 10 GeV, 1 bunches, 0.1 nC, 1 Hz | Access to TLD: |
203
|
03 May 2017, 13:38 |
Tobias Haas | General | Information | Accelerator Schedule for the next days | Author: Decking
Run Coordinators: W. Decking (93430), D. Sanzone
Tunnels XTIN, XTL, XTD2-4, XTD10 closed
Temporary access to XTL,XTD2-4, XTD10 possible on Wed, 4.5.
Next open access XTIN, XTL, XTD2-4, XTD10 on Wed, 10.05. 08-16
|01/05 Mo M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo A | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|01/05 Mo N | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 1 Hz; establish 6, 8 GeV File
|02/05 Tu A | Beam operation to T4D 6 GeV, 1 bunches, 0.5 nC, 1 Hz
|02/05 Tu N | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We M | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz; study beam optics
|03/05 We A | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|03/05 We N | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|04/05 Th M | Beam operation to T4D 6.4 GeV, 1 bunches, 0.5 nC, 1 Hz
|04/05 Th A | No beam operation, tunnels closed
|04/05 Th N | No beam operation, tunnels closed
|05/05 Fr M | No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr A | No beam operation, Acces to TLD for leak search, Temporary access to T2-T4 possible
|05/05 Fr N | No beam operation, tunnels closed
|06/05 Sa M | No beam operation, tunnels closed
|06/05 Sa A | No beam operation, tunnels closed
|06/05 Sa N | No beam operation, tunnels closed
|07/05 Su M | No beam operation, tunnels closed
|07/05 Su A | No beam operation, tunnels closed
|07/05 Su N | No beam operation, tunnels closed
|08/05 Mo M | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo A | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz
|08/05 Mo N | Beam operation to T4D 11 GeV, 1 bunches, 0.5 nC, 10 Hz |
259
|
22 May 2017, 11:06 |
Tobias Freyermuth | General | Information | AE PLC OCD | From now on the PLC OCD contact person will have always the phone number:
9 8040 |
209
|
05 May 2017, 14:35 |
Nicola Coppola | General | Information | AE OCD Mai 5 -- Mai 8 | AE on call service:
Contact person:
Nicola Coppola
Phone:
9 - 5627
|
253
|
19 May 2017, 15:42 |
Nicola Coppola | General | Information | AE OCD Mai 19 -- Mai 22 | AE on call service:
Contact person:
Nicola Coppola
Phone:
9 - 5627 |
189
|
28 Apr 2017, 14:31 |
Tobias Freyermuth | General | Information | AE OCD April 29 - Mai 1 | AE on call service:
Contact person:
Tobias Freyermuth
Phone:
9 - 6822
|
444
|
10 Jan 2018, 17:20 |
Bruno Fernandes | General | Information | 1Hz Triggers | Hello everyone,
The main Timing System at DESY, which distributes all timing information to our systems, is right now configured to generate 1Hz trigger signals on Event #16. This is the trigger that is deliver to most detectors/cameras on our site.
DESY is testing a new Gun and wanted to use a slower trigger frequency during this evaluation.
We were not inform in advance about this reconfiguration. After a few colleagues from SPB approach us reporting this problem, we contacted DESY and got the update. We will take steps to make sure that future Timing changes done by DESY are communicated to XFEL ahead of time. |
202
|
03 May 2017, 13:29 |
Tobias Haas | General | Information | *IMPORTANT* Change of plans re Access tomorrow |
Due the recent results from XFEL, the urgent maintenance is shiftet from Thursday 4th to Friday 5th. On Thursday, there will be operation till 14:00, after 14:00 the machine will be switched to standby. All the work planned will shift accordingly by one day. No ZZ before Thursday 14:00. The machine will be shut down Friday moring 7:00. Interlock situation: The machine will stay in interlock, only the access to XTL from OSDORF will be brocken. XTL: Access from Osdorf - activation measurement XS1 XTL/rear part by D3 - Leak search and repair in the TLD beamline by MVS - A20 work by MHF-p (Exchange of filament heating, work on phase shifter) - CS8 RF measurement on load (MHF-p) - Repair of wire scanner relais XTL: Access from Bahrenfeld - Exchange of filter in the BCM monitors by MKS - Repair of DCCT of a B2D quad - Change of AMC board in A8 by MSK XTD2: - ZZ for repair of a BPM system XTD10: ZZ for Photon Beamline Work All further work has to be agreed by the run or machine coordination. |
559
|
10 Sep 2018, 09:12 |
Adriano Violante | General | Information | switch software update - ITDM request | The office switched reported below have to be upgraded. Some of them belong to accelerator and some to us. Below you find the detailed list of the switches and the time schedule (assuming everything runs fine) for the update. ITDM needs feedback the latest today evening.
if you see problems with the upgrade, please reply to this e-mail. If we do not receive complaints until this evening, we assume that everything is fine.
Monday, 24.09.2018, 06:00 - 08:00 am:
sw-hh-al-324.desy.de XFEL_XHEXP1_SASE2_A21.UH3.03
sw-hh-al-325.desy.de XFEL_XHEXP1_SASE2_A22.UH7.02
sw-hh-al-323.desy.de XFEL_XHEXP1_SASE3_E21.UH2.03
sw-hh-al-322.desy.de XFEL_XHEXP1_SASE3_E22.UH3.01
sw-hh-al-274.desy.de XFEL_XHQ.1.174
sw-hh-al-298.desy.de XFEL_XSDU1_UG01.001_R01_3175m
sw-hh-al-295.desy.de XFEL_XTD1_SA2.R002_R26_2238m
sw-hh-al-296.desy.de XFEL_XTD1_SA2.R005_R16_2384m
sw-hh-al-297.desy.de XFEL_XTD1_T3.R007_R33_2500m
sw-hh-al-299.desy.de XFEL_XTD1_T3.R010_2.1_2581m
Tuesday, 25.09.2018, 06:00 - 08:00 am:
sw-hh-al-287.desy.de XFEL_XTD10_3.13_3297m
sw-hh-al-285.desy.de XFEL_XTD10_3.4_3141m
sw-hh-al-286.desy.de XFEL_XTD10_3.7_3209m
sw-hh-al-290.desy.de XFEL_XTD2_T4.R009_R14_2590m
sw-hh-al-293.desy.de XFEL_XTD3_T5.R005_R01_2846m
sw-hh-al-292.desy.de XFEL_XTD3_UN1.R002_R16_2740m
sw-hh-al-288.desy.de XFEL_XTD4_SA3.R001_R27_2838m
sw-hh-al-289.desy.de XFEL_XTD4_SA3.R002_R48_2888m
sw-hh-al-291.desy.de XFEL_XTD4_T4D.R006_R19_3057m
sw-hh-al-294.desy.de XFEL_XTD5_UN2.R001_R04_2972m |
110
|
06 Apr 2017, 13:36 |
Andreas Koch | XTD2 | Information | motion loop not working !? | Has anyone an idea why the motion loop is not working? Thanks Andreas |
111
|
06 Apr 2017, 14:32 |
Andreas Koch | XTD2 | Information | motion loop not working !? |
Andreas Koch wrote: |
Has anyone an idea why the motion loop is not working? Thanks Andreas
|
Hello Andreas,
please use redmine for bug reports. I opened a redmine issue for this:
https://in.xfel.eu/redmine/issues/16265
Please log in and give more details on what you experienced.
In case of emergency contact your main contact person Wajid.
Cheers
Alessandro |
112
|
06 Apr 2017, 14:45 |
Andreas Koch | XTD2 | Information | motion loop not working !? |
Andreas Koch wrote: |
Andreas Koch wrote: |
Has anyone an idea why the motion loop is not working? Thanks Andreas
|
Hello Andreas,
please use redmine for bug reports. I opened a redmine issue for this:
https://in.xfel.eu/redmine/issues/16265
Please log in and give more details on what you experienced.
In case of emergency contact your main contact person Wajid.
Cheers
Alessandro
|
Thanks, Alessandro,
It's working again.
It was the Wifi that slowed down.
Andreas
|
24
|
24 Jan 2017, 08:23 |
Tobias Haas | General | Information | Karabo Names in Vacuum component list | Post on behalf of Alessandro Silenzi:
please find below the link to the first version of the master component list and the link to the direct download:
Please give your comments directly to me to avoid confusion.
The next steps after collecting your input, will be to implement a test in the Firmware project generation that will test the deviceIds against this list.
Best regards
Alessandro Silenzi
|
Draft
|
14 Sep 2018, 13:38 |
Adriano Violante | XHEXP | | | |
|