Entry   Motion loop update, posted by NEREA JARDON on 06 Jun 2017, 13:46 
Dear all,
We will start with the Motion loop update. Will take us a little bit, around 3 hours, but I will let you know when it has finished.
Thank you,
Entry   SOLVED BROKER Problem , posted by Alessandro Silenzi on 03 Jun 2017, 22:39 
A pile up in the BrokerQueue was detected by  CAS monitoring system
and 
a response action from the On-Call personnel  was triggered.
Entry   Status and plans after SASE1 Readiness Meeting, posted by Tobias Haas on 02 Jun 2017, 13:01 
General

    Due to the water incident in the hall commissioning activities are somewhat delayed
    Next week 2 technicians from Actemium/Jovo
arrive and shall fix damaged connectors, disassemble a subset of connectors and test all cables
    Detailed planning for the repair and testing
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 31 May 2017, 11:05 
 General

    Photon tunnels will be searched starting
at 1500 today and then closed. Machine will go back into regular operation this afternoon
    XTD9 stays open until further notice
   
Entry   Vacuum Loop, posted by NEREA JARDON on 31 May 2017, 10:45 
Dear all, we will proceed with the update of the Vacuum loop.
Thank you!
Entry   Vacuum Loop, posted by NEREA JARDON on 30 May 2017, 20:42 
Dear all,
We have detected with Karabo guys that there was a problem in the IonPumps in SASE1. The IonPumps are working, Raúl went to the Tunnel to
check the controllers in XTD9 to confirm that.
Entry   Motion loop, posted by NEREA JARDON on 30 May 2017, 19:43 
Dear all, we will run another update in the Motion loop.
Thank you
Entry   Vacuum Loop, posted by NEREA JARDON on 30 May 2017, 18:32 
We will run again an update in the Vacuum loop, just to fix small bug detected.
Thank you
Entry   Motion loop, posted by NEREA JARDON on 30 May 2017, 18:14 
Dear all,
I will make an update of the Motion loop in the next minutes, all the systems are in safe state.
Thank you
Entry   Vacuum Loop, posted by NEREA JARDON on 30 May 2017, 15:52 
Dear all,
We will run the update of the Vacuum loop in the next half hour.
Thank you!
Entry   Vacuum Loop, posted by NEREA JARDON on 30 May 2017, 11:08 
Dear all,
Sorry, my last message was not correct. We will do the hardware changes when we have prepared the Vacuum update also.
Thank you
Entry   Vacuum Loop, posted by NEREA JARDON on 30 May 2017, 10:56 
Dear all,
It is needed to add two digital input terminals in Rack 1.17 and 1.18 in XTD9 for the vacuum loop, and Denis will do it in the next minutes. Therefore
you will loose communication for those motion racks.
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 29 May 2017, 16:30 
 General

    Photon tunnels are open until Wednesday afternoon due to the flooding on the weekend. 
    The down time should be used
to do important fixes/upgrades
    XTD9 can stay open all week depending on the decision of the PCT
    Photon commissioning successfully
Entry   Status of beam commissioning, posted by Harald Sinn on 27 May 2017, 16:31 
We got the beam to the end of XTD9 onto the SPB screen and FXE Pop-in (the SPB pop-in does not work).
Everything looks quite good and the beam is quite stable.
Lasing photon engery is around 6.2 keV and 200-300 mJ per pulse.
Entry   CAS OCD phone numbers for the weekend, posted by Gabriele Giovanetti on 26 May 2017, 18:01 

    Friday 7 PM - Saturday 8.00 AM    : 98060
    Saturday 8.00 AM - Sunday 8.00 AM : 98054
    
    Sunday 8.00 AM - Monday 8.00 AM   : 98055

Entry   Status after 0930 meeting, posted by Tobias Haas on 24 May 2017, 10:39 
 General:

    DESY will try to lase again at higher energies during the next days
    XTD9 will searched an interlocked this afternoon at
1400 as PCT will try to transport photons as far as possible
    Company Wille has started to work on the radiation interlocks in SASE1. New
Entry   Reminder: SASE1 Readiness Dispatch @ 0930 today, posted by Tobias Haas on 24 May 2017, 09:06 
see you there 
Entry   Status and Plans after 09:30 Meeting, posted by Tobias Haas on 22 May 2017, 13:31 
[B]General:[/B]
[LIST]
[*]No break this week on Wednesday. (Wednesday breaks for XTD10 should start next week)
Entry   AE PLC OCD, posted by Tobias Freyermuth on 22 May 2017, 11:06 
From now on the PLC OCD contact person will have always the phone number:
  9 8040
Entry   SASE1 Imager FR, posted by Dennis Goeries on 21 May 2017, 17:10 
Dear all,
we are experiencing constantly crashes with the photonic science camera in the SA1 imager FR. We found now out 
- If the pixel format is set to Mono16 the camera will most likely crash, go in error.