Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 274
Entry time: 31 May 2017, 11:05
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and Plans after 09:30 meeting |
|
|
General
- Photon tunnels will be searched starting at 1500 today and then closed. Machine will go back into regular operation this afternoon
- XTD9 stays open until further notice
- Flooding damaged several connectors in SPB Optics and FXE Instrument.
- Jovo will replace connectors that show optical damage and test all cables that were in the water. A list is being compiled by Adriano. Meeting held for this purpose today at 1330 in XTOB.
XTDs
- Work continues on stability problem of SR imager
- 2 updates were done on motion loop since a bug was still found for the MC2 lib after the first update
- 1 update was done for vacuum loop but another one needs to be done since there is still an issue with the NAGIOS system
- Test with the PBLM is still outstanding and will be done today
- The systems should be in a fully functional state again this afternoon!
FXE
- Vacuum gate valves can be controlled now after some work by J. Tolkiehn. Ion pumps are not controlled yet
- Next update of firmware should resolve the problem with ion pumps
- Cables for loops 4&5 were in the water and hence work on these components has to wait
SPB
- Full E2E test was done for the PSLIT.
- Further tests will have to wait for fixes to cables
PLC
- AE works on AGIPD today and will go back to instruments tomorrow
- An update to the EPS needs to be done at some point in the near future to implement the end switches of the screens
- When cables are fixed and tested, all modules in the respective loop have to be pulled out as they are daisy-chained
KARABO
- New system implemented for deploying new versions that allows quick switch and possible roll-back
- Script system implemented that performs schema evolution for scenes. Hence, old scenes will be adapted to changes automatically. This is important for the many scenes developed by the PCT.
- Deployment of next Karabo version with bug fixes to be done before machine restart this afternoon
|