Entry   Access XTD2 tomorrow, posted by Tobias Haas on 26 Apr 2017, 17:48 
I added the requests that I was made aware of to the list of access requests for tomorrow. While the interlock in XTD2 will be broken and hence the tunnel
is accessible without special procedures, please note the followoing

    Please make sure your request in in the DESY table of access requests 
    You have valid access permissions and two
Entry   Motion loop, posted by NEREA JARDON on 26 Apr 2017, 18:06 
Dear all,
I will do an update into the Motion loop. Would take only few minutes and the PLC will be running again.
Thank you and sorry
Entry   Update MOV loop, posted by Tobias Freyermuth on 27 Apr 2017, 09:34 
Hi all,
 
in order to integrate the CRL in XTD2 I am going to update the motion loop.
Entry   Status and Plans after 09:30 meeting, posted by Tobias Haas on 27 Apr 2017, 15:11 
 XTDs Info:
Tunnel XTD2/4 will be accessible today until 1500. Dosimeter
and General radiation training required. 
Entry   Accelerator plans for the next 5 days, posted by Tobias Haas on 27 Apr 2017, 15:28 
27/04 Th A Beam operation to TLD 10 GeV, 1 bunches, 0.1 nC,
1 Hz; interlock set XTD2-XTD427/04 Th N 
Entry   Motion Loop is up, posted by Valerii Bondar on 27 Apr 2017, 17:41 
Dear all, 
motion loop is up and all Karabo devices in it are running.
Thank you.
Entry   Fertigmeldung phase II cables SPB Optics Hutch D.02 and SPB laser hutch D.13, posted by Adriano Violante on 28 Apr 2017, 08:25 
 ACTEMIUM has delivered the handover document for the phase II cables installed in D,02 and D.13. The beckhoff crates can be connected to the cables
in these areas of SASE1.
 
Entry   Status and plans after SASE1 Readiness Meeting, posted by Tobias Haas on 28 Apr 2017, 13:08 
 Tunnel Status (T. Haas):

    Tunnels XTD2/4/10 were interlocked yesterday afternoon
    Beam is already going through the T2 and T4 beam lines to T4D

   XTD9 remains open until approximately 15 May

Vacuum (J. Eidam, R. Villanueva):
Entry   Small correction to minutes posted just before, posted by Tobias Haas on 28 Apr 2017, 13:24 
Note that plans for next week (points 2& 3) should refer to XTD9 and *NOT* XTD2
 Plans for next week:

    Consolidate vacuum in XTD2 so that V0 can be reliably opened when first beam should
Entry   AE OCD April 29 - Mai 1, posted by Tobias Freyermuth on 28 Apr 2017, 14:31 
AE on call service:
    Contact person:
        Tobias Freyermuth 
Entry   CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid, posted by Hugo Silva Santos on 28 Apr 2017, 14:43 
 Dear All, 
I would like to share the CAS members on the OCD from 29/04 to 01/05:

    Saturday 08:00 to Sunday 08:00 - Valerii - Phone: 95471
    Sunday 08:00 to Monday 08:00 - Gabriele - Phone: 96894
Entry   WP74 OCD contacts for the coming weekend, posted by Jan Grünert on 28 Apr 2017, 15:44 
WP74   OCD  for the coming weekend 29.4.-1.5.2017:
 
Saturday: Theo, theophilos.maltezopoulos@xfel.eu, 9-6792 
Entry   Vacuum group call service, posted by Janni Eidam on 28 Apr 2017, 16:29 
Not really official, but in emergency case you can call 96993 for vacuum group. Next week Martin is back and I think we will have official on call service.

Have a nice weekend with hopefully no problems :-)
Entry   ERRATA: CAS - On-Call Duty Planning - Valerii, Gabriele and Wajid , posted by Hugo Silva Santos on 29 Apr 2017, 10:04 
 Dear All,
Still in time, I would like to correct out schedule.
The scheduled previous agreed for this weekend/holiday was from 10:00 to 17:00. Therefore,
Entry   PBLM Motor drivers in PreOP, posted by Tobias Freyermuth on 02 May 2017, 10:05 
Hi all,
 
due to ongoing tests with the PBLM motor drivers I have to set the Elmo drivers in PreOp mode. 
Entry   Status of Vacuum System , posted by Harald Sinn on 02 May 2017, 10:56 
XTD2: All gate valves are now OK (not interlocked) after re-instantiating and re-setting the XGM_DP_OK. 
The interlock errors of some valves in XTD9 are shown in the screen shots below (Janni and Valerii starting now in XTD9 to debug some more controllers)
 
Entry   Access to XTDs on Thursday, posted by Adriano Violante on 02 May 2017, 15:30 
 This Thursday the XTDs will be accessible with ZZ procedure. Access can be requested via T. Haas. 
Entry   Status after 0930 meeting, posted by Tobias Haas on 03 May 2017, 11:04 
Tunnel Status: XTD2/4/10 closed. XTD9 open. Controlled
Access to 2/4/10 possible upon request
 
Entry   Correction to plans for Vacuum (e-log message n3. 199) in XTD9, posted by Raúl Villanueva-Guerrero on 03 May 2017, 11:15 
 Dear all,
it seems that this morning was somehow a misunderstanding. The XTD9 Gas Section Interlock test was succesfully finished the last 26th of April
(see e-log message nr. 179).
Entry   GUI Server redeployment, posted by Alessandro Silenzi on 03 May 2017, 12:32 
The GUI server has been redeployed and a second one has been added.
In order to access those:
please log out of the gateway and log in again using the usual command