SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 183
Entry time: 27 Apr 2017, 15:11
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and Plans after 09:30 meeting |
|
|
XTDs Info:
Tunnel XTD2/4 will be accessible today until 1500. Dosimeter and General radiation training required.
XTD10 will be closed starting this afternoon
Vacuum:
- DPS with interlocks was tested successfully yesterday evening but...
- ... Complete failure of gas sections in both XTD and XTD9 some time tonight. Valves were closed and turbo pumps were off. Reason is still being investigated
-
- Systematic tests of ion pumps in XTD9 done for 3 vacuum sections. Currently only the pumps are tested. Tests of the interlock will follow
Karabo:
- The problem with the GUI server has unfortunately not re-occured. Hence it can currently not be debugged.
- Second GUI server is available for fall back
- Remote reset of TP controllers has been implemented and will be deployed in the next release
PLC
- A problem was found in the MC2 library affecting the ELMO controller. This only affected the systems deployed in the tunnel.
- The non-linear behaviour of the PBLM motors was reproduced independently of PLC and KARABO. Suggestion: Could this happen when the motor has to work against vacuum pressure? Evidence: It does not occur in the lab (no vacuum!)
- A video session with the manufacturer is schedule for next week to look at the problem
PBLM/Motion Loop:
- There is a resource problem when trying to read out the cameras. This problem will be reconsidered once the general issue with the GUI server is solved.
- ASilenzi will discuss offilen with Natalia the acceptance test definition for PBLM
- List of errors and relative solution concerning ELMO absolute encoder implementation being worked out by AE/CAS
EPS
- Logic of EPS was agreed between AE and H. Sinn:
- Currently only covers devices up to XS3
- Vacuum ok requires all valves to be out of the way
- Any screen down forces single bunch mode
- All imagers in safe position allows full beam mode
- Meeting next week @ DESY to discuss technical details with MPS group
SPB Tunnel components
- Renishaw encoder can be read out reliably after fix for error signal line
- SPB would like to work on the pulse picker next and is waiting for it to be integrated
FXE
- FXE guys would like to help with tests of Hard X-Ray Mono
Tasks for today:
- Perform various maintenance tasks in XTD2, e. g. integrate CRLs, exchange photo tubes, exchange gases
- Investigate why gas sections switched off yesterday
- Continue test of vacuum components in XTD9
|